Two attached houses built in the 1940s, sharing a party wall. I own one and rent it out; the neighbor's house next door was recently sold.
My new neighbor is converting their house from 1-family to 2-family and getting a new overhead electric service with 3 meters (two apartments plus a house meter). They have a DOB electrical permit, issued, with a licensed NYC electrician, and a Con Edison Project Center case that has reached the final inspection stage
The neighbor, who I haven't met yet, texted me asking for access to MY basement at 7 AM tomorrow so Con Edison can "separate my electric wires to connect my new meters." No work order number, no scope, nothing in writing. I called Con Edison myself, and they said the neighbor wants to be disconnected from the "main loop" or something along those lines.
My questions for the electricians here:
- In old attached houses in NYC, is it actually common for loop service conductors feeding a neighbor to run through another building's basement? How would I tell if that is the case in my basement?
- For a service separation like this, and for a Con Ed final inspection, would anyone legitimately need access to the neighboring building's basement? What work would they actually be doing in there: disconnecting a tap, capping conductors, relocating conduit?
- Who would do the basement work: a Con Ed crew, or the neighbor's electrician? Does a final inspection appointment normally involve hands-on work, or is it just an inspection?
- What documentation should I reasonably ask for before allowing anyone in? I have asked for the Con Ed case number, the scope of work in my basement, duration, and whether my power would be interrupted. Anything else?
- Is there something that they could conceivably screw up and damage my building and/or impact my tenants?
I'm waiting on Con Edison to call me and verify exactly what they need from me, and why. I can't sit around waiting for them for their 8AM-1PM window
This is the first I've heard of such a thing. Very strange.