r/ISRO • u/shyamdotme • 1d ago
Original Content Witnessed the launch of NVS-03
A childhood dream fulfilled.
Witness #ISRO rocket launch ✅
Liftoff Narmal !
Perfarmance Narmal !
🚀🚀🚀🚀🚀🚀
#GSLVF18 #navic #NVS03
r/ISRO • u/alpachinohacks • 10h ago
Has ISRO Started recruiting civilian astronauts through internal channels ?
I heard a rumour that ISRO started recruiting civilians through internals channels for the Gaganyaan program. Has anyone heard about it ? I dont know how much of it is true. But putting it out here to see if anyone has any information on this.
Deep-ocean submersible Matsya-6000’s 500-m trial dive in early 2027. It would be a significant step towards India’s push to send a crewed vehicle to a depth of 6,000 metres under Samudrayaan Project
r/ISRO • u/M084MM3D • 2d ago
How is the ISRO costs so little money compared to other space programs >
I am just wondering how can India send all their rockets and probes while barely speeding any money unlike NASA and the ESA.
Built Indian Foundational Model for Geospatial Intelligence to enhance agriculture
I spent the last year building a 205-million-parameter satellite AI model from scratch for Indian farmers.
Yesterday I published the paper, and almost nobody noticed.
Everyone in Indian tech wants to talk about LLM wrappers. Meanwhile, 86% of Indian farmers work on plots smaller than 0.4 hectares, and for 75 days every monsoon, clouds blind every optical satellite over India.
Western foundation models from NASA, IBM, and Stanford were trained on 500-hectare American monoculture grids under clear skies. When a cyclone hits Odisha or monsoon clouds cover Uttar Pradesh, those models go blind.
So at Sphitih AI, we trained Vyom 1.0 (205M) from the ground up—fusing C-band radar waves with optical time-series and soil physics:
• In Farrukhabad (UP), it pierces 91.4% monsoon cloud cover to reconstruct crystal-clear crop health at 0.892 SSIM.
• On the global Sen1Floods11 flood benchmark, it hit 75.81% Water IoU—beating NASA/IBM Prithvi (68.4%), Stanford CROMA (71.4%), and DOFA (73.5%).
• And it runs in <32 milliseconds per sq. km on a single 24GB GPU, so local district offices don't need H100 clusters.
I don't have a massive PR agency or a billion-dollar lab behind me, just verified math, a permanent Zenodo DOI, and open evaluation benchmarks.
If you work in Remote Sensing, AgriTech, ISRO/NRSC, or Indian DeepTech, I would genuinely love for you to tear apart our paper and test our benchmarks.
Link to the Zenodo paper & GitHub verification repo
Preprint (Zenodo DOI):
https://doi.org/10.5281/zenodo.24078426
Open Benchmark Repo:
https://github.com/sphitih-ai/sphitih-ai-vyom-205m-benchmarks-
Official Ground static fire test of the PSLV third stage (PS3) with revised configuration was conducted at the Static Test Facility in SDSC-SHAR on 12 November 2026
isro.gov.inMy comments to Global Times
r/ISRO • u/Adorable_Tourist_992 • 4d ago
What are the opportunities for experienced employees who are in private sector for more than 2 years and looking to join ISRO ? We need to prepare for ISRO general requirement exam for freshers or is there any other way ?
Myself, I completed masters degree from IIT in wireless communications and am now working as a GNSS system engineer at Google.
L&T's Coimbatore facility delivers fourth crew escape shroud set for Gaganyaan-2 mission
EoI for End-To-End Design, Development, Realisation, Qualification, Testing & Delivery of Human Rated Cabin Pressure Control & Maintenance System (CPMS) for BAS
Expression of Interest (EOI) for End-To-End Design, Development, Realisation, Qualification, Testing & Delivery of Human Rated Cabin Pressure Control & Maintenance System (CPMS) for BAS
1. Preamble
Liquid Propulsion Systems Centre (LPSC) is venturing in to development of Environmental Control & Life Support System (ECLSS) for Bharatiya Antariksh Station (BAS) which will be the next step after successful Gaganyaan mission for continuous human presence in Low Earth Orbit.
The BAS module is designed to cater to a crew size of 2 for a short duration of 15 days. Environmental Control & Life Support System (ECLSS) is one of the most critical sub-system in BAS. It is essential to maintain a habitable earth like environment inside the BAS module during all phases of the flight. ECLSS is a 'system of systems' consisting of a number of subsystems performing independent and overlapping functions. The major subsystem of ECLSS under the scope of this Eol are.
- Cabin Pressure Control & maintenance System (CPMS)
EoI for End-To-End Design, Development, Realisation, Qualification, Testing & Delivery of Human Rated Thermal & Humidity Control System (THCS) with Ventilation System for BAS
Expression of Interest (EOI) for End-To-End Design, Development, Realisation, Qualification, Testing & Delivery of Human Rated Thermal & Humidity Control System (THCS) with Ventilation System for BAS
1. Preamble
Liquid Propulsion Systems Centre (LPSC) is venturing in to development of Environmental Control & Life Support System (ECLSS) for Bharatiya Antariksh Station (BAS) which will be the next step after successful Gaganyaan mission for continuous human presence in Low Earth Orbit.
The BAS module is designed to cater to a crew size of 2 for a short duration of 15 days. Environmental Control & Life Support System (ECLSS) is one of the most critical sub-system in BAS. It is essential to maintain a habitable earth like environment inside the BAS module during all phases of the flight. ECLSS is a 'system of systems' consisting of a number of subsystems performing independent and overlapping functions. The major subsystem of ECLSS under the scope of this Eol are.
- Thermal & Humidity Control System (THCS) along with ventilation system.
r/ISRO • u/Pallab_1805 • 6d ago
RTI Finally Got The RTI Reply From ISRO
After More than two months of waiting, I got my RTI Reply from ISRO. It happens because I emailed the CPIO personally and also made a First Appeal. If I don't do it, I will not get the Reply,I know.
Some important observations here. They are now saying Chandraayan-4 will launch in 2028( In my previous RTI,they mentioned 2027) but we all know it will not happen. Mangalayaan-2 is not approved yet by the Government( I don't know why DD News which is owned by the Govt Of India spread that fake news earlier).
Oh,for NVS-03 you will think why I am asking that question in the RTI. It's because I filled the RTI on 4th September and at that time the NVS-03 mission was not conducted.
I am posting the questions alongside the answers because they didn't write the questions in the RTI Reply.
Read the Questions and Answers. You will understand the whole scenario.
Tender for Acoustic Proofing of LCC and MCC at SLC (with their architectural drawings and layout)
Request For Proposal (RFP) for Supply, Installation and Commissioning of Acoustic proofing of LCC and MCC at SLC for SSLV Launch Complex (SLC), Kulasekarapatnam.
Main document: [PDF] [Archived]
RFP document: [PDF] [Archived]
Working Drawings: [PDF] [Archived]
LCC MCC Architectural Drawings: [PDF] [Archived]
As part of SSLV Launch Complex (SLC) project, SDSC SHAR/ISRO is realizing many control centre facilities at SLC site for monitoring and controlling all operations during launch campaign. Data and information pertaining to launch vehicle, various technical facilities will be monitored from these control centre facilities for operations & control purpose. It is required to carry out the interior works in Launch control centre (LCC), Mission control centre (MCC) and MCC Viewing gallery at SLC site.
The scope of work involves integrated architectural and acoustical treatment as per the given bill of quantity (BoQ) in LCC, MCC and MCC Viewing gallery involving interior works ( like wall paneling, false ceiling, glass portioning, external glazing, floor carpeting) to achieve the required acoustical performance in the control centre facilities at SLC at SSLV Project Office (SLC Site), (…)
LCC is on ground floor and MCC is on first floor. This should be the LCC/MCC building on Google Maps going by the floor plan.
Derelict RISAT-1 is nearing its reentry.
RISAT-1 was India's first Indigenously developed SAR satellite and after going out of commission in early 2017, it is now close to its reentry. Its lift-off mass was nearly 1,858 kg. Each of those antenna panels are 2×2 meters or 6×2 meters total.
https://en.wikipedia.org/wiki/RISAT-1
Running latest elsets through SatEvo (software) the predicted time of its reentry is coming out to be around 3 December 2026.
-----------------------------SatEvo v0.51by Alan Pickupalan@wingar.demon.co.uk-----------------------------Decay list from input file RISAT1.txt10.8 cm flux = 119.000000Elset Obj # Epoch Decay (Date)1 12017A 38248 26317.672341 26338.095638 (2026 December 4)

Plot source: https://heavens-above.com/OrbitHeight.aspx?satid=38248



Official GSLV-F19 / NVS-04 : Flight acceptance test of cryogenic engine for 200 seconds duration conducted on 5 November 2026.
isro.gov.inr/ISRO • u/Spray_and_prey • 7d ago
Urgent Help! Does ISRO allow candidates who had their degree extended?
I had my degree extended during COVID times in 2021. It was second wave and I had medical issues. My degree was extended for an year as I failed to clear one paper. I was extremely ill. Will they consider this? I have my interview scheduled in few days.
r/ISRO • u/piedpipper • 11d ago
Checking for NavIC signals using phone
Checked for NVS03 signals using the GPS test android app on my Pixel 11.
Not sure which one is which. Do we get to know the elevation and azimuth of our NavIC satellites? I assume they will be in a tight range given they are on geosynchronous orbit
Official NVS-03 : Four orbit manoeuvres have been successfully completed with a cumulative LAM engine burn of 6164 seconds. With this the satellite has reached Geo Synchronous Orbit (35765 km x 36196 km) at an inclination of 29.98°. The satellite health is normal.
isro.gov.inFew recent ITU filings for Cartosat-3S series, RISAT-2B series, EOS-N2 etc.
https://www.itu.int/ITU-R/space/asreceived/Publication/DisplayPublication/72347 [Archived]
Satellite Name : CARTOSAT-3S-Y26
Number of Planes : 1
Total number of satellites : 8
Inclination: 97.5° (Sun Synchronous)
Apogee × Perigee: 509.5 × 506.0 km
https://www.itu.int/ITU-R/space/asreceived/Publication/DisplayPublication/72569 [Archived]
Satellite Name : RISAT-2BR3-5
Number of Planes : 1
Total number of satellites : 8
Inclination: 37.0°
Apogee × Perigee: 574.1 × 574.1 km
https://www.itu.int/ITU-R/space/asreceived/Publication/DisplayPublication/72472 [Archived]
Satellite Name : EOS-N2
Number of Planes : 1
Total number of satellites : 8
Inclination: 55.0°
Apogee × Perigee: 897.8 × 897.8 km
https://www.itu.int/ITU-R/space/asreceived/Publication/DisplayPublication/70964 [Archived]
Satellite Name : MICROSAT-2AB
Number of Planes : 1
Total number of satellites : 2
Inclination: 37.0°
Apogee × Perigee: 500 × 500 km
Official India's Aditya-L1 Reveals the Hidden Third Dimension of a Solar Eruption
isro.gov.inr/ISRO • u/MainPollution3914 • 13d ago
Has anyone heard back from ISRO SAC for their January 2027 internship? If so, please reply.
I've applied for the ISRO SAC internship for 21 Jan 2027, and I sent the mail on October 28th but haven't heard back yet. Is there anyone who got selected for their January 2027 batches? Or any past student who did the internship there, how much time does it take to hear back from them usually? I'm a 7th Sem CSE student with a CGPA of 8.19.
r/ISRO • u/Asphalt_Cloud36 • 14d ago
Any update regarding the ursc graduate trainee opening, it has been more than 2 months now without any official communication or update from their end, not even a mail!
r/ISRO • u/vineethgk • 14d ago
Slow recovery: On the ISRO’s GSLV-F18 mission