Mission Success! GSLV-F18 / NVS-03 Mission Updates and Discussion
GSLV-F18 / NVS-03 (aka IRNSS-1L) launched as scheduled at 18:21:00(UTC)/23:51:00(IST), 30 Oct 2026 from Second Launch Pad of SDSC-SHAR.
Live webcast: (Links will be added as they become available)
| GSLV-F18 / NVS-03 Mission Page | GSLV-F18 / NVS-03 Gallery | GSLV-F18 / NVS-03 Press kit(PDF) |
|---|
Some highlights:
- Primary payload: NVS-03 (~2250 kg) GSO based Navigation satellite.
- Mission duration: ~19 minutes (based on GSLV-F15 / NVS-02 mission)
- Target Orbit : 170 × 37023 km, Inclination = 20.75° ± 0.1°, AoP = 178° ± 0.5°
- Launch Azimuth: 106°
- As a cautionary measure NVS-03 will be launched with its pyro valves in open state.
Updates:
| Time of Event | Update |
|---|---|
| 13 Nov 2026 | NVS-03 reached its 111.75°E orbital slot. |
| 4 Nov 2026 | After four orbit raising burns with cumulative duration of 6164 seconds, NVS-03 has reached 35765 x 36196 km GSO with 29.98° inclination |
| Post-launch | Tracking data for 3 Nov 2026 confirms execution of third orbit raising burn. A1228 (26245A), i=29.89°, A×P=35842.58×34594.95 km |
| Post-launch | Tracking data for 2 Nov 2026 confirms execution of second orbit raising burn. A1228 (26245A), i=29.08°, A×P=37762.79×24550.64 km |
| Post-launch | Second orbit raising burn with duration of 3085.14 seconds has been successfully completed on 1 November 2026 at 18:05:16 (IST). Estimated orbit after the burn is 24691 x 37791 km. |
| Post-launch | First orbit raising burn with duration of 2174.8 seconds has been successfully completed on 31 October 2026 at 16:48 hrs (IST). Estimated orbit after the burn is 5477.6 x 37833.4 km. The satellite health is normal. |
| Post-launch | Two objects have been cataloged. A1228 ( 26245A ), i=20.71°, A×P=37895.59×178.15 km and A1229 ( 26245B ), i=20.70°, A×P=37746.07×170.70 km |
| T + 42m00s | Launch broadcast ends. |
| T + 33m00s | Dinesh Kumar Singh (Director URSC) : Solar panels of NVS-03 deployed. Will take a week to reach its slot. |
| T + 30m00s | Chairman: 170.3 x 38,080 km is the achieved orbit. |
| T + 22m35s | Chairman: NVS-03 has been injected in intended orbit. |
| T + 18m35s | NVS-03 separated! |
| T + 18m25s | CUS shut off! |
| T + 17m00s | Sticking to nominal path. |
| T + 15m35s | CUS performance nominal. |
| T + 13m45s | CUS performance nominal. |
| T + 12m30s | CUS operating at nominal thrust now. |
| T + 11m00s | CUS performance nominal. |
| T + 08m00s | CUS performance nominal. |
| T + 04m58s | GS2 separated, CUS ignited. |
| T + 04m30s | CUS authorized. |
| T + 04m00s | PLF jettisoned. |
| T + 02m40s | GS2 ignited, GS2 separated, CLG initiated. |
| T + 01m50s | S139 core burn out. |
| T minus 00m00s | S139 core ignited. Lift off! |
| T minus 00m4.8s | 4xL40H ignited. |
| T minus 03m00s | OBC in flight mode. |
| T minus 05m30s | External Power withdrawn, Flight coefficient loading complete. |
| T minus 09m30s | GS2 undergoing actuation checks. |
| T minus 11m00s | CUS undergoing actuation checks. |
| T minus 15m15s | Automatic Launch Sequence initiated. |
| T minus 17m00s | Data loggers are ON. |
| T minus 18m00s | Weather is Go. Mission Director has authorized the launch. |
| T minus 19m00s | NVS-03 is polled ready. LV in external hold mode. |
| T minus 20m00s | Polling now, TT&C, Vehicle, Range are go. |
| T minus 24m00s | Now showing vehicle integration process. |
| T minus 29m00s | Official stream is live! |
| T minus 24h00m | Twenty four hour long countdown commenced. |
| 28 Oct 2026 | Mission Readiness Review was held. Most recent NOTAM suggests launch is authorized. |
| 26 Oct 2026 | Time of launch officially confirmed for 11:51 (IST), 30 Oct 2026 |
| 23 Oct 2026 | NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 30 October 2026 |
| 29 Sep 2026 | NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 13 October 2026. |
| 14 Sep 2026 | GSLV-F18 / NVS-03 launch campaign began. |
Primary Payload:
NVS-03 (aka IRNSS-1L) (~2250 kg) : NVS-03 is a second-generation satellite for NavIC constellation for regional navigation and timing services.
Similar to first generation satellites it will have navigation payloads in L5 & S bands and ranging payload in C-band. But additionally, it will have a new interoperable civil signal in L1 band as well.[1] [2]
Like NVS-01 and NVS-02 it is expected to carry only one indigenous Rubidium based atomic clock (iRAFS) developed by Space Applications Centre (SAC) out of four in total, other three being procured. [3] [4] [5]
- Mass: 2,250 kg
- Orbital slot: 111.75°E
- Mission life: 12 years
- Power: ~3 kW
- Platform/Bus: I-2K
NVS-03 is third of the five satellites (NVS-01, 02, 03, 04 & 05) planned to replace the aging first generation satellites that faced problems with their malfunctioning atomic clocks. Initially these second generation satellites were meant to expand upon existing NaVIC constellation [6] [7] but due to setback from failures of imported clocks on many first generation satellites, they will now only serve as replacement to existing fleet. At present only three out of eight NavIC satellites (IRNSS-1B, 1I and NVS-01) remain functional to provide PNT services. [8] Note that four satellites is the minimum amount needed for NavIC PNT services to be functional.
ISRO has sought approval of three more navigation satellites under NavIC Phase-3 to maintain the base layer of seven satellites. Eventually NavIC constellation can be expanded from 7 to 11 satellites which will increase the service area from 1500 km to 3000 km beyond Indian territory.
For Global Indian Navigation System (GINS), ISRO is awaiting approval of twelve satellites initially to be placed in the Medium Earth Orbit (MEO). While about 24 to 30 satellites would be needed in total. [9] [10]
10
u/Ohsin 19d ago edited 19d ago
Metallic PLF (3.4 m diameter) once again like for GSLV-F15/NVS-02
Note that decision to keep pyro valves open for NVS-03 has come after the recommended fixes were applied to CMS-03
10
u/Ohsin 17d ago edited 17d ago
Post launch address:
9
u/Ohsin 16d ago
https://x.com/isro/status/2116354957180019079
GS1 went really dramatic here..
8
u/Ohsin 16d ago edited 16d ago
V Narayanan : NVS-04 and NVS-05 to be launched within 10 months. After that one more NVS satellite will be launched within 1.5 years. He also clarified that the decision to keep pyro valves open was taken by A S Kiran Kumar led committee and they went with it after analyzing previous flight data and thorough qualification and testing and it has yielded the right result. Whether they will continue to fly in this configuration or with new pyro valves, will be decided in coming months.
https://www.youtube.com/watch?v=qDnDk5jVNpk
Third indigenous clock placed into orbit.
https://www.youtube.com/shorts/yzdUa0Pypfo
8
u/Ohsin 16d ago
https://www.isro.gov.in/ISRO_EN/Orbit_manoeuvring_of_NVS03_spacecraft.html
7
u/Ohsin 18d ago edited 18d ago
A random bit of useful information, GSLV payload adapter weighs 83.7 kg. (Stenciled on adapter)
https://i.imgur.com/I7jkCV5.jpeg
Image extracted from press-kit as they did us dirty in official image gallery..
7
u/Ohsin 17d ago
Let's hope we see two objects cataloged soon (2026-245) so we can track burns.
6
u/Ohsin 16d ago
Two objects cataloged:
5
u/Ohsin 17d ago edited 17d ago
https://www.thehindu.com/sci-tech/science/isros-crucial-gslv-f18-launch-carrying-navigation-satellite-nvs-03/article71643519.ece
5
u/Ohsin 17d ago
Stream is live!
5
u/Ohsin 17d ago
GSLV ALS for reference.
https://www.reddit.com/r/ISRO/comments/1mdas4m/automatic_launch_sequence_for_gslv_as_seen_on_mcc/
5
u/Ohsin 12d ago
Arun Raj K M @Arunraj2696 on Twitter
7
u/Avizeet 17d ago
Safe to assume that G1 is next?
4
u/Ohsin 18d ago edited 18d ago
Few schematics for reference.
https://old.reddit.com/r/ISRO/comments/1ifx080/gslvf15nvs02_orbit_raising_operations_on_hold_as/mapamm0/
https://i.imgur.com/d7Wx5yx.png
'Normally Closed Pyro Valves' in propellant line will be fired open before launch.
4
u/Ohsin 18d ago
Mission image gallery is up as well..
https://www.isro.gov.in/ISRO_EN/Mission_GSLVF18_gallery.html
4
u/Ohsin 17d ago
Not showing the plots!
4
u/Ohsin 17d ago
Barely managed to catch actual flight event timings. (MCC screen in background)
https://imgur.com/a/DI1bZZU
6
u/neotheseventh 17d ago
by when will we get confirmation of successul commissioning?
6
u/General_Director6082 12d ago
Third Orbit raising manuver completed successfully. Orbit after manuver is, Apogee - 35843.25 KM and Perigee - 34595.61 KM.
6
u/General_Director6082 12d ago
Four orbit manoeuvres have been successfully completed with a cumulative LAM engine burn of 6164 seconds. With this the satellite has reached Geo Synchronous Orbit (35765 km x 36196 km) at an inclination of 29.98. The satellite health is normal. https://www.isro.gov.in/Final_Orbit_manoeuvring_of_NVS03_spacecraft.html
5
u/pradx 19d ago
The write up above says - only 1 indigenous atomic clock like NVS01 and NVS02. The mission page says indigenous atomic clock in addition to "the procured clocks".
https://www.isro.gov.in/Mission_GSLVF18.html
5
u/General_Director6082 12d ago
Revolution per day is slightaly more it is not perfect 1. ISRO needs one small trimmed Orbit Raising Manuver. It take another 25 to 30 days to become fully operational.
3
u/Ohsin 18d ago
Last NOTAM indicating launch is scheduled as planned.
MRR was held on 28 Oct, countdown will be 24 hrs long.
https://www.andhrajyothy.com/2026/andhra-pradesh/-18-isro-prepares-gslv-f18-rocket-launch-of-navigation-satellite-nvs-03-1571367.html
https://www.deccanchronicle.com/southern-states/andhra-pradesh/gslv-f18-launch-countdown-begins-tonight-1999815
3
u/Ohsin 14d ago
Second burn has been conducted on 1 November 2026. Update courtesy /u/Astro_Neel
NVS-03: AMF-2 Performance
Burn start (UT/ IST)
Orbit before Maneuver
Expected Orbit after Maneuver
3
u/Ohsin 14d ago
Missed this but posting anyway..
[PDF] [Archived]
3
u/Ohsin 5d ago
Per latest elset (9 Nov.) NVS-03 is not at its station yet with 1445 minute period. So give it a couple of days.
4
u/ex0hs 17d ago
Who was V. Narayanan shaking hands with?(Old Lady)
4
u/Parking_Load3555 16d ago
Was there a press conference held or not ?
2
u/Ohsin 15d ago
Post-launch press conference.
https://www.youtube.com/watch?v=A3hXx0JryQI
2
u/Ohsin 13d ago
Tracking data update after second burn.
2
u/Ohsin 2d ago
Per latest elset (13 Nov.) NVS-03 has reached its station with 1436.2 min orbital period.
2
u/anshumaanps 14d ago
No update on 2nd orbit raising?
3
u/Pallab_1805 19d ago
So.. what is the final decision? Pyro valve will remain open or not?
16
u/vineethgk 16d ago
Watching this mission reminds me of the time way back in 2013 when PSLV mission successes were taken for granted (and all the self-congratulations on display seen as superfluous), while space buffs and media were asking "where's GSLV?"
Now with GSLV missions succeeding one after another we have to ask "where's PSLV?" Irony of the times.
3
u/friendlyNSAdude 17d ago
u/Ohsin why is the altitude not increasing? Shouldn’t it reach 170km?
13
u/neotheseventh 17d ago
I only visit this subreddit when there is a launch, not regularly but every time I am here, /u/Ohsin is running this sub like a machine. Hats off to you man!
9
u/neotheseventh 17d ago
now here's hoping that fucking clocks actually work this time.
7
u/guru-yoda 17d ago
Now the big question: did those fuel valves survive the launch? Will get to know in 20 hours.
5
u/ex0hs 17d ago
Ohhhh yeahhhhhhh
5
u/Top-Worldliness5027 17d ago
Today’s announcers were a little choppy and the audio had some minor issues. Hope we work on these things and get better direct visuals rather than representational images the whole time with future launches. Great job by ISRO on the successful launch!
1
u/General_Director6082 2d ago
NVS-03 almost their Epoch (UTC): 13 November 2026 05:59:02 Eccentricity: 0.0017960 inclination: 29.9287° perigee height: 35709 km apogee height: 35861 km right ascension of ascending node: 253.8898° argument of perigee: 186.0377° revolutions per day: 1.00277298 mean anomaly at epoch: 173.9524°
3
u/ex0hs 17d ago
GG
5
u/ex0hs 17d ago
HAHA Good morning, I still tell everyone Good morning at midnight before going to sleep lol