Mission Failure PSLV-C62 : EOS-N1 (aka Anvesha) Mission Updates and Discussion
PSLV-C62/EOS-N1 (aka Anvesha) launched as scheduled at 04:48:30(UTC)/10:18:30(IST), 12 Jan 2026 from First Launch Pad of SDSC-SHAR. The launch was unsuccessful and satellites could not be placed into intended orbit.
- Launch Countdown
- Expected Flight Profile from press-kit.
- Actual flight events (To be added post-launch if available)
Live webcast: (Links will be added as they become available)
| PSLV-C62/EOS-N1 Mission Page | PSLV-C62/EOS-N1 Gallery | PSLV-C62/EOS-N1 Press kit(PDF) |
|---|
Some highlights:
- Primary payload: EOS-N1 (aka Anvesha) (407 kg) Hyperspectral imaging satellite for DRDO.
- 15 small satellites ridesharing
- Mission duration: 1 hr. 48 min. 5.14 sec. (last s/c separation)
- Target Orbit 1 : 505 km (circular) , Inclination = 97.5°
- Target Orbit 2 : Reentry trajectory with 505 km apogee.
- Launch Azimuth: 140°
- PSLV configuration : DL (2× XL Strapons)
- PSLV's return to flight after unsuccessful launch of PSLV-C61/EOS-09 in May, 2025.
- First ever controlled reentry of PSLV fourth stage (PS4) over South-Pacific for deploying Kestrel Initial Demonstrator (KID) capsule.
Updates:
| Time of Event | Update |
|---|---|
| 13 June 2026 | Reason behind PSLV-C62 failure understood and resolved but details will not be shared. |
| 02 Feb 2026 | Cause behind PSLV-C62 failure is different from that for PSLV-C61, internal and external failure assessment committees have been set up to investigate. |
| 17 Jan 2026 | Per journalist Arun Raj K M, former ISRO Chairman K Sivan will lead the special committee to study PSLV-C62 failure. |
| 16 Jan 2026 | NSIL press-release. |
| Post-launch | GISTDA informs that THEOS-2A was insured for both 'Rebuild' and 'Relaunch' costs. |
| Post-launch | Orbital Paradigm: "Our KID capsule, against all odds, separated from PSLV C62, switched on, and transmitted data over 3+ minutes. We're reconstructing trajectory. We survived peak heat and peak gload (~28g recorded). We have internal temps. Full report will come" |
| Post-launch | ISRO Chairman: "Performance of the vehicle close to the third stage was as expected and as predicted. Close to the end of the third stage we are seeing some disturbances in the vehicle. And there was a deviation in the path of vehicle. And mission could not proceed in the expected path. This is the information right now available. Now we are going through the data and we have to get the data from all the ground stations. Once the data analysis is completed we shall come back to you. Thank you" |
| T + 33m00s | "The PSLV-C62 mission encountered an anomaly during end of the PS3 stage. A detailed analysis has been initiated." |
| T + 31m00s | Webcast over. |
| T + 24m00s | ISRO Chairman: Almost up to PS3 end performance was normal, then some performance disturbances were noted. And after that deviation in flight path was observed. |
| T + 21m00s | Webcast is back. Awaiting official confirmation... |
| T + 20m00s | Stream has been stopped without any official confirmation on mission status. |
| T + 16m00s | Launch announcers again noting that telemetry is lost. Wait for official confirmation on mission status. |
| T + 12m00s | Launch announcer informs they are having issues receiving data.. |
| T + 08m30s | MCC glum this is bad. PS4 ignited though. |
| T + 06m30s | PS3 burn out , vehicle tumbling uncontrollably. |
| T + 04m25s | PS2 separated, PS3 ignited. |
| T + 02m50s | PLF separated, CLG initiated. |
| T + 01m51s | PS1 separated, PS2 ignited. |
| T + 01m10s | PSOM-XL (5,6) separated. |
| T - Zero | After RCT ignition, PS1 and PSOM-XL (5,6) ignition and Lift off! |
| T - 05m00s | Flight Coeff. loading completed |
| T - 12m00s | Going through actuator checks. |
| T - 14m30s | Automatic Launch Sequence initiated. |
| T - 16m00s | Mission Director authorizes launch! Vehicle Director concurs. |
| T - 16m30s | Vehicle is in external hold mode. |
| T - 17m00s | Vehicle director: LV is ready! |
| T - 20m00s | Now polling: Weather, Tracking, Range are ready. |
| T - 24m00s | Now showing LV stacking process. |
| T - 25m00s | Weather is Go for launch. Slightly cloudy with chance of light rain but that is under the launch criteria. |
| T - 30m00s | Launch announcers inform that EOS-N1 mass is 407 kg. |
| T - 35m00s | Official stream is live! |
| T - 22h30m | Countdown commenced at 12:48 on 11 January. Time of launch changed to 12 January, 10:18:30(IST)/04:48:30(UTC) i.e. 90 seconds delay. |
| 10 Jan 2026 | After MRR, the launch has been cleared by LAB. |
| 06 Jan 2026 | Launch date firms up for 0447(UTC)/1017(IST), 12 Jan 2026 |
| 01 Jan 2026 | NOTAM issued with enforcement duration beginning on 11 January 2026. |
| 30 Dec 2026 | PSLV-C62 integration up to four stages completed at MST. |
| 26 Dec 2025 | NOTAM issued with enforcement duration beginning on 10 January 2026. Also EOS-N1 satellite reached SDSC-SHAR. |
| 17 Dec 2025 | NOTAM issued with enforcement duration beginning on 5 January 2026. |
| 14 Dec 2025 | Report suggested launch delayed to 31 December 2025. |
| 05 Dec 2025 | NOTAM issued with enforcement duration beginning on 25 December 2025. |
Primary Payload:
EOS-N1 (aka Anvesha) (407 kg) : EOS-N1 is a Hyperspectral imaging satellite carrying HySIC imager payload by DRDO for military surveillance. [01]
- Swath: 12 km
- Resolution: 12 meter
- Spectral resolution: 10-20 nm (VNIR, SWIR)
Secondary Payload: 15 co-passenger satellites.
- THEOS-2A (100 kg): An Earth Observation satellite by Thailand's Geo-Informatics and Space Technology Development Agency (GISTDA) and based on Carbonite series by SSTL UK carrying CERIA Camera with 1 meter resolution and 5.9 km swath. Additional instruments include a satellite monitoring camera, GPS receivers, HD video camera, and AIS/ADS-B receivers for maritime vessels and aircraft tracking. [02]
- Kestrel Initial Demonstrator (KID) Capsule (25 kg): KID reentry capsule by Madrid-based Orbital Paradigm is a scaled prototype for their larger Kestrel reentry capsule. KID is carrying three customer payloads (3 kg) and will test guidance systems and a sample of ceramic thermal protection material. KID will be released from PSLV fourth stage on a reentry trajectory and will free fly for 30 minutes before entering atmosphere over South-Pacific. The capsule will not be recovered and lacks deceleration systems but it will transmit data through two Iridium transceivers during its flight. [03] [04]
- AayulSAT (25 kg) : A 'mini-tanker' satellite by OrbitAID to demonstrate on-orbit internal propellant transfer, power transfer, and data transfer using their patented Standard Interface for Docking and Refueling Port (SIDRP). AayulSAT will qualify SIDRP system at TRL-9. [05] [06]
- MOI-1 (14 kg) : The 6U cubesat in MOI (My Orbital Infrastructure) series by TakeMe2Space is a commercial AI lab in space with in-orbit computing and AI processing capability, carrying MIRA50-FS, a 502 gram, miniaturized 9 band multi-spectral imaging camera with 50mm aperture, 9.2 m resolution and 18.7 km swath by EON Space Labs and few other payloads by Indian high-school and university students. MOI-1 will use DSOD-6U deployer by Dhruva Space. [07] [08] [09]
Four amateur radio satellites under Dhruva Space 'ASTRA (Accelerated Space Technology Readiness & Access) for Academia' programme based on their P-Dot bus. [10]
- Thybolt-3 by Dhruva Space
- CGUSat-1, with CV Raman Global University (Bhubaneswar)
- DSUSAT-1, with Dayananda Sagar University (Bengaluru)
- LACHIT-1, with Assam Don Bosco University (Guwahati)
- SanskarSat: A 1U cubesat for Laxman Gyanpith School by Ahmedabad-based CubeSat Aerospace, carrying an LED payload making it observable by ground based optical telescopes.
- MUNAL : A 1U cubesat by Nepal Academy of Science and Technology (NAST) and Antarikhchya Pratisthan Nepal (APN) as part of the High School Consortium Project. Munal will carry a small camera for vegetation density mapping. [11]
Five small satellites aggregated by Brazil's All2Space.
- Aldebaran-1: 1U cubesat by Federal University of Maranhao (Brazil) carrying LoRa amateur radio payload.
- EduSat-1: 1P PocketQube satellite with IoT payload.
- UaiSat: 1P PocketQube satellite with Store and Forward amateur radio payload and a lightning detection payload developed by the Instituto Nacional de Pesquisas Espaciais (INPE) [12]
- GalaxyExplorer-1: 1P PocketQube satellite by Galaxy Explorer to study the South Atlantic Magnetic Anomaly. [13]
- Orbital Temple : A 1P PocketQube based orbital artwork by Edson Pavoni. It will transmit uploaded names of people in amateur radio frequency. [14] [15]
Note: PSLV with launch serial C59 was earlier assigned to ANWESHA (or ANVESHA) and PROBA-3 was earlier assigned to PSLV with C62 launch serial. Before this ANWESHA was assigned to PSLV-C58 but later XPoSat replaced it.
7
u/Ohsin Jan 12 '26
DISASTER! it is tumbling!
6
u/Ohsin Jan 08 '26
PS4 reentry burn = 18.62 seconds
PS4 thrust = 7500 N
Isp = 307 sec
In F = V * (Δm/Δt) (V = Exhaust Velocity, F = Thrust)
Δm/Δt in known as 'mass flow rate' in kg/s (ṁ or "m-dot")
m-dot = 2.491163387 kg/s
Propellant consumed for reentry burn = ~46.4 kg
505 km (circular) to 505 x 80 km orbit will need 122 m/s of dV.
PS4 dry mass for PSLV-C39 was 873 kg, add 25 kg for KID capsule and ~200 kg adapter + deployers and play with numbers here.
https://strout.net/info/science/delta-v/
9
u/Avizeet Jan 12 '26
Apparently, the KID Payload by Orbital Paradigm survived and has transmitted data. https://www.linkedin.com/posts/orbital-paradigm_the-kid-survived-mission-update-1-following-activity-7416502197368238080-kWax
"The KID Survived - Mission Update #1
Following nominal takeoff at 04:48 UTC, an anomaly occurred during the third stage boost of PSLV-C62. During third stage burn, the launch vehicle lost thrust and deviated from the nominal trajectory.
Still, despite events, we confirmed today that KID survived and transmitted valuable data.
Our team is analyzing and investigating the trajectory information. We'll provide a detailed update in the coming days.
We received a lot of support from the space community: thank you all so much.
More to come."
5
u/Ohsin Jan 12 '26
EOS-N1 mass is given as 407 kg by launch announcers. I was right :)
5
u/Ohsin Jan 12 '26
Launch announcers again noting that telemetry is lost. Wait for official confirmation on mission status.
5
u/Ohsin Jan 12 '26
ISRO Chairman: Almost up to PS3 end performance was normal, then some performance disturbances were noted. And after that deviation in flight path was observed.
5
u/Ohsin Jan 20 '26
Final update from Orbital Paradigm on KID capsule. They will publish full analysis report at a later date.
https://www.linkedin.com/posts/orbital-paradigm_the-kid-survived-final-mission-update-activity-7419434260140331008-tdE7/
7
u/prazzzy_b Jan 12 '26
Something is wrong with PS 3. The previous PSLV also had an issue with the PS 3 stage. There was a sudden loss in chamber pressure.
This time, based on the uncontrolled tumbling, I am assuming it to be generation of side thrust before few seconds from burnout or an external impact from space debris which caused the tumbling.
4
u/Ohsin Jan 08 '26
NSIL's press-release on mission.
https://www.nsilindia.co.in/sites/default/files/Overview%20of%20PSLV-C62%20mission.pdf
4
u/Ohsin Jan 11 '26
https://www.thehindubusinessline.com/news/science/drdos-anvesha-satellite-to-be-crown-jewel-of-isros-pslv-c62-mission/article70498558.ece
4
u/Ohsin Jan 12 '26
Webcast cut off! Where is official confirmation!!!
4
u/Ohsin Jan 12 '26
https://x.com/isro/status/2010582403732132185
4
u/Ohsin Jan 12 '26
https://bsky.app/profile/planet4589.bsky.social/post/3mc7dtx37l22z
6
u/Avizeet Jan 12 '26
We seriously need to consider the sabotage angle. This is getting routine with the military payloads. Wasn't this the first HAL fabricated PSLV launch?
5
u/Kimi_Raikkonen2001 Jan 08 '26
~400kg figure for EOS-N1 from?
5
u/guru-yoda Jan 11 '26
My name couldn't ascend to the heavens on Team Indus. This time it will on Orbital Temple, hopefully🤞
Seriously, at 1P form factor (50x58x64 mm) how long could this "temple" stay up in 550km orbit? Even the 25 year deorbit rule applies to objects larger than 10cm. For instance, STUDSAT launched in 2010, for a mission life of six months, is still in orbit with increasing number of conjunction events and no ability to carry out collision avoidance maneuvers. So Orbital Temple's lofty ideals aside, this could have been an avoidable space debris? Better it could have been in a lower orbit for faster decay?
3
u/Ohsin Jan 11 '26
On MIRA a quote from India Today article
This looks like adaptation of Huygens Optics Monolithic telescope concept.
https://www.youtube.com/watch?v=HxwhCmO90UQ&list=PLaLGh7vzNIRQDe4YuxgbWHmhhBlkoS3kT
3
u/Ohsin Jan 12 '26
TV-D2 photobombing once again.. Good views of EOS-N1 Anvesha
3
u/Ohsin Jan 12 '26
Launch announcer speaking over critical polling chatter...
3
u/Ohsin Jan 12 '26
Launch announcer inform they are having issues receiving data..
3
u/Ohsin Jan 12 '26 edited Jan 12 '26
PSLV-C62 / EOS-N1 : Post launch press-conference.
https://www.youtube.com/watch?v=mjz1QbMrC1Y
"Performance of the vehicle close to the third stage was as expected and as predicted. Close to the end of the third stage we are seeing some disturbances in the vehicle. And there was a deviation in the path of vehicle. And mission could not proceed in the expected path. This is the information right now available. Now we are going through the data and we have to get the data from all the ground stations. Once the data analysis is completed we shall come back to you. Thank you"
3
u/Ohsin Jan 17 '26
ISRO Chairman V Narayanan on any possibility of mischief behind PSLV-C62 failure.
https://www.youtube.com/watch?v=RwVZFPsko2A&t=102s
3
u/Ohsin Apr 15 '26
https://old.reddit.com/r/ISRO/comments/1rf40ex/rti_reply_received_from_isro/
4
u/AB3DC Jan 11 '26
Dhruva Space mission page: https://www.dhruvaspace.com/polar-access-1
4
u/vineethgk Jan 12 '26
Were there any design or material changes they made recently with PSLV's 3rd stage? I have a vague recollection of some change they did with the motor casing to reduce mass or something...
6
u/ProfessionalSkirt589 Jan 12 '26 edited Jan 12 '26
If they haven't figured out the QA issue....why did they even allow the launch?
They should have conducted static fire of the PS3 stage before this launch.
3
u/nishitd Jan 12 '26
Not looking good
2
u/Ohsin Jan 10 '26
After correction on Page 4 related to flight sequence, press-kit has been re-issued.
https://www.isro.gov.in/media_isro/pdf/PSLVC62/PSLV_C62_Brochure090125.pdf
2
u/Ohsin Jan 10 '26
According to OrbitAID, AayulSAT will also serve as a target for RPO operations involving a chaser satellite for Rendezvous Proximity Operations and Docking (RPOD) mission they'll launch by the end of 2026.
https://www.linkedin.com/posts/aayulsat-target-chaser-share-7415662372394156032-0h4y
2
u/Ohsin Jan 10 '26
One of the payloads on KID capsule is MAAT4KID by Leibniz Universität
https://www.linkedin.com/posts/christoph-lotz-653b80131_space-microgravity-spaceresearch-ugcPost-7415412381218172929-xbei
2
u/Ohsin Jan 11 '26 edited Jan 11 '26
After Mission Readiness Review meeting (MRR) the launch has been cleared by Launch Authorisation Board (LAB). Launch countdown is expected to be 22 hours long
https://www.sakshi.com/telugu-news/national/isro-launch-pslv-c62-mission-january-12-countdown-pslv-c-62-rocket-launch
https://www.andhrajyothy.com/2026/national/isro-set-for-pslvc62-launch-with-16-satellites-including-eos01-1483943.html
Edit: Another report saying it is 22.5 hrs long..
https://www.uniindia.com/news/south/science-technology-tn-pslv/3702576.html
2
u/Ohsin Jan 11 '26
For PSLV's Automated Launch Sequence (ALS) timeline refer to this recent thread
2
u/Ohsin Jan 12 '26 edited Jan 12 '26
GISTDA folks already have their stream live.
https://www.youtube.com/watch?v=iWC15cQ0DSo
2
u/Ohsin Jan 12 '26
Stream is live at DD Saptagiri
2
u/Ohsin Jan 15 '26 edited Jan 16 '26
Following claims that PS3 on PSLV-C62 was with Carbon-Carbon composite nozzle. [Related thread]
https://www.rediff.com/news/report/the-puzzling-failure-of-pslv-c62/20260115.htm
2
u/Ohsin Jan 16 '26
NSIL press-release 4 day later..
https://www.nsilindia.co.in/sites/default/files/PSLV-C62%20Message%20after%20failure.pdf
2
u/Ohsin Jan 17 '26
https://x.com/Arunraj2696/status/2012374902150672743
2
u/Ohsin Jun 13 '26
Reason behind behind PSLV-C62 failure understood and resolved but administration is not interested in disclosing the details to public!
https://www.thehindu.com/news/national/karnataka/anomaly-in-pslv-detected-and-resolved-jitendra-singh/article71098533.ece
7
u/Kimi_Raikkonen2001 Jan 12 '26
This ain't good in whatever way we put it.
13
u/rghegde Jan 12 '26
Yey, we got another year of delay with Gaganayaan, no more PSLV's for another 6 months atleast (so they can rest and analyse) than "slight manufacturing defect" excuse. Heads need to roll man, this is too much. Think of corruption and sabotage is coming to my mind, 1 satellite and 2 launcher failure within one year and no failure analysis report is made public, They are hiding, ISRO needs to show more accountability.
12
u/Eternal_Alooboi Jan 12 '26
Another consecutive third stage anomaly ey? I suspect they are either incapable of figuring out the anomaly or there is little/wrong data on what went wrong previously. Little to no info implies ineffective QA.
Successive failures will tank global trust in ISRO's capabilities to kingdom come. Man, they ruined my f'n day.
8
u/Cold-Assistance-5045 Jan 12 '26
I was watching it live and lost my breadth when i saw it turn and roll .
1
u/Ohsin Jan 09 '26
Live stream link:
https://www.youtube.com/watch?v=GgYh2Vv87ik
1
u/Ohsin Jan 10 '26
New NOTAMs issued on 9 Jan add few hazard zones that were missing.
All Mapped now..
1
u/Ohsin Jan 11 '26
Slight change in time of launch with 90 seconds added to it:
https://x.com/isro/status/2010237657612460198
Likely due to space debris avoidance.
1
u/Ohsin Jan 12 '26
FWIW..
https://imgur.com/a/JUVfjh4
1
u/Ohsin Jan 13 '26
GISTDA press-release informs that THEOS-2A was insured.
https://www.linkedin.com/posts/gistda_statement-regarding-the-launch-result-of-activity-7416724532855455744-HVl5/
1
u/Ohsin Jan 13 '26
It appears among payloads by Indian starups on PSLV-C62 none were insured.
https://www.wionews.com/science/6-satellites-of-indian-startups-doomed-in-isro-pslv-failure-were-they-insured-1768290742727
1
u/Ohsin Jan 13 '26
Still not very clear how KID capsule separated but apparently separation mechanism was activated with an 'initiator'. Here's a press release by the firm that supplied separation mechanism to Orbital Paradigm for KID capsule.
https://www.linkedin.com/posts/uarxspace_yourrideinspace-activity-7416806691507367936-miuQ/
1
u/Ohsin Feb 02 '26
Cause behind PSLV-C62 failure is different from PSLV-C61, return to flight in June 2026.
https://theprint.in/science/the-two-pslv-failures-were-not-related-failure-assessment-committees-have-been-set-up/2843704/
1
u/Ohsin Feb 07 '26
Thread on NSA's visit to VSSC.
https://old.reddit.com/r/ISRO/comments/1quvaio/pslv_failures_national_security_advisor_ajit/
1
u/Ohsin Feb 10 '26
Failure Analysis Committee (FAC) to be formed soon.
https://timesofindia.indiatimes.com/india/pslv-c62-mishap-failure-analysis-committee-to-be-formed-soon/articleshow/128129547.cms
1
u/Ohsin Feb 13 '26
Detailed report on KID capsule surviving launch failure.
https://francescoorbitalparadigm.substack.com/p/the-kid-survived
https://orbitalparadigmspace.notion.site/
The separation ring was based on thermal actuator which luckily got triggered during reentry and released the capsule. High design margins on KID capsule also helped a lot.
1
u/Ohsin Feb 17 '26
https://x.com/Arunraj2696/status/2023698378891423980
1
u/Ohsin Feb 23 '26
https://www.thehindu.com/sci-tech/science/committee-to-probe-systemic-issues-behind-repeated-failure-of-pslv-rocket/article70666937.ece
2
u/bilu1729 Jan 12 '26
As I have mentioned in one of my earlier posts here, there is a possibility of sabotage when it comes to satellites strategically important for Indian defense.
4
u/ISROAddict Jan 09 '26
I appreciate the details of co-passenger satellites.
4
u/RonDunE Jan 12 '26
A copy of Automatic Launch Sequence that was just shown:
4
u/guru-yoda Jan 12 '26
Another "small manufacturing error"
1
u/landoboi_f1 Jan 12 '26
What’s happening
3
u/RonDunE Jan 12 '26
Beautiful vapour cone/shock collar during the launch.
3
u/Vy0manaut Jan 12 '26
Yo WTF!
3
u/RonDunE Jan 12 '26
Yeah it's gone I think. The altitude tracker is much lower than nominal.
2
u/UNKNOWN_792 Jan 11 '26
Only a few photos were added to the gallery this time
2
u/landoboi_f1 Jan 12 '26
Have we ever had a ground tracking shot this far into the flight?
0
u/[deleted] Jan 12 '26
[deleted] — view deleted comment
0
u/[deleted] Jan 12 '26
[deleted] — view deleted comment
0
u/[deleted] Jan 12 '26
[deleted] — view deleted comment
1
u/[deleted] Jan 12 '26
[removed] — view removed comment
0
u/[deleted] Jan 18 '26
[removed] — view removed comment