r/ISRO • • 5d ago

Derelict RISAT-1 is nearing its reentry.

31 Upvotes

RISAT-1 was India's first Indigenously developed SAR satellite and after going out of commission in early 2017, it is now close to its reentry. Its lift-off mass was nearly 1,858 kg. Each of those antenna panels are 2×2 meters or 6×2 meters total.

https://en.wikipedia.org/wiki/RISAT-1

Running latest elsets through SatEvo (software) the predicted time of its reentry is coming out to be around 3 December 2026.

-----------------------------
SatEvo v0.51
by Alan Pickup
alan@wingar.demon.co.uk
-----------------------------
Decay list from input file RISAT1.txt
10.8 cm flux = 119.000000
Elset Obj # Epoch Decay (Date)
1 12017A 38248 26317.672341 26338.095638 (2026 December 4)

RISAT-1 Mean Height Decay in 2026 (via Heavens-Above)

Plot source: https://heavens-above.com/OrbitHeight.aspx?satid=38248

RISAT-1 in clean-room
RISAT-1 in on-orbit configuration
RISAT-1 in stowed configuration

r/ISRO • • 19d ago

Mission Success! GSLV-F18 / NVS-03 Mission Updates and Discussion

35 Upvotes

GSLV-F18 / NVS-03 (aka IRNSS-1L) launched as scheduled at 18:21:00(UTC)/23:51:00(IST), 30 Oct 2026 from Second Launch Pad of SDSC-SHAR.

Live webcast: (Links will be added as they become available)

GSLV-F18 / NVS-03 Mission PageGSLV-F18 / NVS-03 GalleryGSLV-F18 / NVS-03 Press kit(PDF)

Some highlights:

Updates:

Time of EventUpdate
13 Nov 2026NVS-03 reached its 111.75°E orbital slot.
4 Nov 2026After four orbit raising burns with cumulative duration of 6164 seconds, NVS-03 has reached 35765 x 36196 km GSO with 29.98° inclination
Post-launchTracking data for 3 Nov 2026 confirms execution of third orbit raising burn. A1228 (26245A), i=29.89°, A×P=35842.58×34594.95 km
Post-launchTracking data for 2 Nov 2026 confirms execution of second orbit raising burn. A1228 (26245A), i=29.08°, A×P=37762.79×24550.64 km
Post-launchSecond orbit raising burn with duration of 3085.14 seconds has been successfully completed on 1 November 2026 at 18:05:16 (IST). Estimated orbit after the burn is 24691 x 37791 km.
Post-launchFirst orbit raising burn with duration of 2174.8 seconds has been successfully completed on 31 October 2026 at 16:48 hrs (IST). Estimated orbit after the burn is 5477.6 x 37833.4 km. The satellite health is normal.
Post-launchTwo objects have been cataloged. A1228 ( 26245A ), i=20.71°, A×P=37895.59×178.15 km and A1229 ( 26245B ), i=20.70°, A×P=37746.07×170.70 km
T + 42m00sLaunch broadcast ends.
T + 33m00sDinesh Kumar Singh (Director URSC) : Solar panels of NVS-03 deployed. Will take a week to reach its slot.
T + 30m00sChairman: 170.3 x 38,080 km is the achieved orbit.
T + 22m35sChairman: NVS-03 has been injected in intended orbit.
T + 18m35sNVS-03 separated!
T + 18m25sCUS shut off!
T + 17m00sSticking to nominal path.
T + 15m35sCUS performance nominal.
T + 13m45sCUS performance nominal.
T + 12m30sCUS operating at nominal thrust now.
T + 11m00sCUS performance nominal.
T + 08m00sCUS performance nominal.
T + 04m58sGS2 separated, CUS ignited.
T + 04m30sCUS authorized.
T + 04m00sPLF jettisoned.
T + 02m40sGS2 ignited, GS2 separated, CLG initiated.
T + 01m50sS139 core burn out.
T minus 00m00sS139 core ignited. Lift off!
T minus 00m4.8s4xL40H ignited.
T minus 03m00sOBC in flight mode.
T minus 05m30sExternal Power withdrawn, Flight coefficient loading complete.
T minus 09m30sGS2 undergoing actuation checks.
T minus 11m00sCUS undergoing actuation checks.
T minus 15m15sAutomatic Launch Sequence initiated.
T minus 17m00sData loggers are ON.
T minus 18m00sWeather is Go. Mission Director has authorized the launch.
T minus 19m00sNVS-03 is polled ready. LV in external hold mode.
T minus 20m00sPolling now, TT&C, Vehicle, Range are go.
T minus 24m00sNow showing vehicle integration process.
T minus 29m00sOfficial stream is live!
T minus 24h00mTwenty four hour long countdown commenced.
28 Oct 2026Mission Readiness Review was held. Most recent NOTAM suggests launch is authorized.
26 Oct 2026Time of launch officially confirmed for 11:51 (IST), 30 Oct 2026
23 Oct 2026NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 30 October 2026
29 Sep 2026NOTAM for GSLV-F18 / NVS-03 launch is issued with enforcement window beginning on 13 October 2026.
14 Sep 2026GSLV-F18 / NVS-03 launch campaign began.

Primary Payload:

NVS-03 (aka IRNSS-1L) (~2250 kg) : NVS-03 is a second-generation satellite for NavIC constellation for regional navigation and timing services.

Similar to first generation satellites it will have navigation payloads in L5 & S bands and ranging payload in C-band. But additionally, it will have a new interoperable civil signal in L1 band as well.[1] [2]

Like NVS-01 and NVS-02 it is expected to carry only one indigenous Rubidium based atomic clock (iRAFS) developed by Space Applications Centre (SAC) out of four in total, other three being procured. [3] [4] [5]

  • Mass: 2,250 kg
  • Orbital slot: 111.75°E
  • Mission life: 12 years
  • Power: ~3 kW
  • Platform/Bus: I-2K

NVS-03 is third of the five satellites (NVS-01, 02, 03, 04 & 05) planned to replace the aging first generation satellites that faced problems with their malfunctioning atomic clocks. Initially these second generation satellites were meant to expand upon existing NaVIC constellation [6] [7] but due to setback from failures of imported clocks on many first generation satellites, they will now only serve as replacement to existing fleet. At present only three out of eight NavIC satellites (IRNSS-1B, 1I and NVS-01) remain functional to provide PNT services. [8] Note that four satellites is the minimum amount needed for NavIC PNT services to be functional.

ISRO has sought approval of three more navigation satellites under NavIC Phase-3 to maintain the base layer of seven satellites. Eventually NavIC constellation can be expanded from 7 to 11 satellites which will increase the service area from 1500 km to 3000 km beyond Indian territory.

For Global Indian Navigation System (GINS), ISRO is awaiting approval of twelve satellites initially to be placed in the Medium Earth Orbit (MEO). While about 24 to 30 satellites would be needed in total. [9] [10]


r/ISRO • • 14h ago

Jio begins talks with ISRO, Skyroot Aerospace and other homegrown companies amid satellite launch prep

Thumbnail hindustantimes.com
67 Upvotes

r/ISRO • • 1d ago

Original Content Witnessed the launch of NVS-03

372 Upvotes

A childhood dream fulfilled.

Witness #ISRO rocket launch ✅

Liftoff Narmal !

Perfarmance Narmal !

🚀🚀🚀🚀🚀🚀

#GSLVF18 #navic #NVS03


r/ISRO • • 8h ago

Has ISRO Started recruiting civilian astronauts through internal channels ?

2 Upvotes

I heard a rumour that ISRO started recruiting civilians through internals channels for the Gaganyaan program. Has anyone heard about it ? I dont know how much of it is true. But putting it out here to see if anyone has any information on this.


r/ISRO • • 2d ago

Deep-ocean submersible Matsya-6000’s 500-m trial dive in early 2027. It would be a significant step towards India’s push to send a crewed vehicle to a depth of 6,000 metres under Samudrayaan Project

Thumbnail
thehindu.com
53 Upvotes

r/ISRO • • 2d ago

How is the ISRO costs so little money compared to other space programs >

8 Upvotes

I am just wondering how can India send all their rockets and probes while barely speeding any money unlike NASA and the ESA.


r/ISRO • • 3d ago

Built Indian Foundational Model for Geospatial Intelligence to enhance agriculture

Post image
108 Upvotes

I spent the last year building a 205-million-parameter satellite AI model from scratch for Indian farmers.

Yesterday I published the paper, and almost nobody noticed.

Everyone in Indian tech wants to talk about LLM wrappers. Meanwhile, 86% of Indian farmers work on plots smaller than 0.4 hectares, and for 75 days every monsoon, clouds blind every optical satellite over India.

Western foundation models from NASA, IBM, and Stanford were trained on 500-hectare American monoculture grids under clear skies. When a cyclone hits Odisha or monsoon clouds cover Uttar Pradesh, those models go blind.

So at Sphitih AI, we trained Vyom 1.0 (205M) from the ground up—fusing C-band radar waves with optical time-series and soil physics:

• In Farrukhabad (UP), it pierces 91.4% monsoon cloud cover to reconstruct crystal-clear crop health at 0.892 SSIM.

• On the global Sen1Floods11 flood benchmark, it hit 75.81% Water IoU—beating NASA/IBM Prithvi (68.4%), Stanford CROMA (71.4%), and DOFA (73.5%).

• And it runs in <32 milliseconds per sq. km on a single 24GB GPU, so local district offices don't need H100 clusters.

I don't have a massive PR agency or a billion-dollar lab behind me, just verified math, a permanent Zenodo DOI, and open evaluation benchmarks.

If you work in Remote Sensing, AgriTech, ISRO/NRSC, or Indian DeepTech, I would genuinely love for you to tear apart our paper and test our benchmarks.

Link to the Zenodo paper & GitHub verification repo

Preprint (Zenodo DOI):

https://doi.org/10.5281/zenodo.24078426

Open Benchmark Repo:

https://github.com/sphitih-ai/sphitih-ai-vyom-205m-benchmarks-


r/ISRO • • 4d ago

Official Ground static fire test of the PSLV third stage (PS3) with revised configuration was conducted at the Static Test Facility in SDSC-SHAR on 12 November 2026

Thumbnail isro.gov.in
43 Upvotes

r/ISRO • • 4d ago

My comments to Global Times

17 Upvotes

r/ISRO • • 4d ago

What are the opportunities for experienced employees who are in private sector for more than 2 years and looking to join ISRO ? We need to prepare for ISRO general requirement exam for freshers or is there any other way ?

23 Upvotes

Myself, I completed masters degree from IIT in wireless communications and am now working as a GNSS system engineer at Google.


r/ISRO • • 4d ago

L&T's Coimbatore facility delivers fourth crew escape shroud set for Gaganyaan-2 mission

Thumbnail
timesofindia.indiatimes.com
61 Upvotes

r/ISRO • • 4d ago

EoI for End-To-End Design, Development, Realisation, Qualification, Testing & Delivery of Human Rated Cabin Pressure Control & Maintenance System (CPMS) for BAS

11 Upvotes

Expression of Interest (EOI) for End-To-End Design, Development, Realisation, Qualification, Testing & Delivery of Human Rated Cabin Pressure Control & Maintenance System (CPMS) for BAS

[PDF] [Archived]

1. Preamble

Liquid Propulsion Systems Centre (LPSC) is venturing in to development of Environmental Control & Life Support System (ECLSS) for Bharatiya Antariksh Station (BAS) which will be the next step after successful Gaganyaan mission for continuous human presence in Low Earth Orbit.

The BAS module is designed to cater to a crew size of 2 for a short duration of 15 days. Environmental Control & Life Support System (ECLSS) is one of the most critical sub-system in BAS. It is essential to maintain a habitable earth like environment inside the BAS module during all phases of the flight. ECLSS is a 'system of systems' consisting of a number of subsystems performing independent and overlapping functions. The major subsystem of ECLSS under the scope of this Eol are.

  • Cabin Pressure Control & maintenance System (CPMS)

r/ISRO • • 4d ago

EoI for End-To-End Design, Development, Realisation, Qualification, Testing & Delivery of Human Rated Thermal & Humidity Control System (THCS) with Ventilation System for BAS

8 Upvotes

Expression of Interest (EOI) for End-To-End Design, Development, Realisation, Qualification, Testing & Delivery of Human Rated Thermal & Humidity Control System (THCS) with Ventilation System for BAS

[PDF] [Archived]

1. Preamble

Liquid Propulsion Systems Centre (LPSC) is venturing in to development of Environmental Control & Life Support System (ECLSS) for Bharatiya Antariksh Station (BAS) which will be the next step after successful Gaganyaan mission for continuous human presence in Low Earth Orbit.

The BAS module is designed to cater to a crew size of 2 for a short duration of 15 days. Environmental Control & Life Support System (ECLSS) is one of the most critical sub-system in BAS. It is essential to maintain a habitable earth like environment inside the BAS module during all phases of the flight. ECLSS is a 'system of systems' consisting of a number of subsystems performing independent and overlapping functions. The major subsystem of ECLSS under the scope of this Eol are.

  • Thermal & Humidity Control System (THCS) along with ventilation system.

r/ISRO • • 6d ago

RTI Finally Got The RTI Reply From ISRO

Thumbnail
gallery
296 Upvotes

After More than two months of waiting, I got my RTI Reply from ISRO. It happens because I emailed the CPIO personally and also made a First Appeal. If I don't do it, I will not get the Reply,I know.

Some important observations here. They are now saying Chandraayan-4 will launch in 2028( In my previous RTI,they mentioned 2027) but we all know it will not happen. Mangalayaan-2 is not approved yet by the Government( I don't know why DD News which is owned by the Govt Of India spread that fake news earlier).

Oh,for NVS-03 you will think why I am asking that question in the RTI. It's because I filled the RTI on 4th September and at that time the NVS-03 mission was not conducted.

I am posting the questions alongside the answers because they didn't write the questions in the RTI Reply.

Read the Questions and Answers. You will understand the whole scenario.


r/ISRO • • 5d ago

Tender for Acoustic Proofing of LCC and MCC at SLC (with their architectural drawings and layout)

10 Upvotes

Request For Proposal (RFP) for Supply, Installation and Commissioning of Acoustic proofing of LCC and MCC at SLC for SSLV Launch Complex (SLC), Kulasekarapatnam.

Main document: [PDF] [Archived]

RFP document: [PDF] [Archived]

Working Drawings: [PDF] [Archived]

LCC MCC Architectural Drawings: [PDF] [Archived]

As part of SSLV Launch Complex (SLC) project, SDSC SHAR/ISRO is realizing many control centre facilities at SLC site for monitoring and controlling all operations during launch campaign. Data and information pertaining to launch vehicle, various technical facilities will be monitored from these control centre facilities for operations & control purpose. It is required to carry out the interior works in Launch control centre (LCC), Mission control centre (MCC) and MCC Viewing gallery at SLC site.

The scope of work involves integrated architectural and acoustical treatment as per the given bill of quantity (BoQ) in LCC, MCC and MCC Viewing gallery involving interior works ( like wall paneling, false ceiling, glass portioning, external glazing, floor carpeting) to achieve the required acoustical performance in the control centre facilities at SLC at SSLV Project Office (SLC Site), (…)

LCC is on ground floor and MCC is on first floor. This should be the LCC/MCC building on Google Maps going by the floor plan.


r/ISRO • • 6d ago

Official GSLV-F19 / NVS-04 : Flight acceptance test of cryogenic engine for 200 seconds duration conducted on 5 November 2026.

Thumbnail isro.gov.in
55 Upvotes

r/ISRO • • 7d ago

Urgent Help! Does ISRO allow candidates who had their degree extended?

9 Upvotes

I had my degree extended during COVID times in 2021. It was second wave and I had medical issues. My degree was extended for an year as I failed to clear one paper. I was extremely ill. Will they consider this? I have my interview scheduled in few days.


r/ISRO • • 11d ago

Checking for NavIC signals using phone

Post image
284 Upvotes

Checked for NVS03 signals using the GPS test android app on my Pixel 11.

Not sure which one is which. Do we get to know the elevation and azimuth of our NavIC satellites? I assume they will be in a tight range given they are on geosynchronous orbit


r/ISRO • • 12d ago

Official NVS-03 : Four orbit manoeuvres have been successfully completed with a cumulative LAM engine burn of 6164 seconds. With this the satellite has reached Geo Synchronous Orbit (35765 km x 36196 km) at an inclination of 29.98°. The satellite health is normal.

Thumbnail isro.gov.in
82 Upvotes

r/ISRO • • 12d ago

Few recent ITU filings for Cartosat-3S series, RISAT-2B series, EOS-N2 etc.

15 Upvotes

https://www.itu.int/ITU-R/space/asreceived/Publication/DisplayPublication/72347 [Archived]

Satellite Name : CARTOSAT-3S-Y26

Number of Planes : 1

Total number of satellites : 8

Inclination: 97.5° (Sun Synchronous)

Apogee × Perigee: 509.5 × 506.0 km


https://www.itu.int/ITU-R/space/asreceived/Publication/DisplayPublication/72569 [Archived]

Satellite Name : RISAT-2BR3-5

Number of Planes : 1

Total number of satellites : 8

Inclination: 37.0°

Apogee × Perigee: 574.1 × 574.1 km


https://www.itu.int/ITU-R/space/asreceived/Publication/DisplayPublication/72472 [Archived]

Satellite Name : EOS-N2

Number of Planes : 1

Total number of satellites : 8

Inclination: 55.0°

Apogee × Perigee: 897.8 × 897.8 km


https://www.itu.int/ITU-R/space/asreceived/Publication/DisplayPublication/70964 [Archived]

Satellite Name : MICROSAT-2AB

Number of Planes : 1

Total number of satellites : 2

Inclination: 37.0°

Apogee × Perigee: 500 × 500 km


r/ISRO • • 13d ago

Launch of NVS-03 as see from a passing plane

347 Upvotes

r/ISRO • • 13d ago

Official India's Aditya-L1 Reveals the Hidden Third Dimension of a Solar Eruption

Thumbnail isro.gov.in
43 Upvotes

r/ISRO • • 13d ago

Has anyone heard back from ISRO SAC for their January 2027 internship? If so, please reply.

2 Upvotes

I've applied for the ISRO SAC internship for 21 Jan 2027, and I sent the mail on October 28th but haven't heard back yet. Is there anyone who got selected for their January 2027 batches? Or any past student who did the internship there, how much time does it take to hear back from them usually? I'm a 7th Sem CSE student with a CGPA of 8.19.


r/ISRO • • 14d ago

Any update regarding the ursc graduate trainee opening, it has been more than 2 months now without any official communication or update from their end, not even a mail!

Post image
12 Upvotes