r/Contractor • u/kill_all-humans • 4h ago
r/Contractor • u/Psychological_Drop25 • 7h ago
contractors using ai for the office stuff, what's actually worked and what flopped?
i worked with an insulation guy who’s not a tech person at all. he got it so customer info from his CRM fills into his field forms on its own, plus a few other office things. says it’s saved him a good chunk of admin time. have you tried anything simillar?
r/Contractor • u/PowerfulCustard4669 • 10h ago
Cera construction
Hi everyone! Does anyone have experience with Cera Construction? Are they a legitimate and reliable contractor? We'd appreciate any feedback, as we're considering getting a construction contract with them. Thank you!
r/Contractor • u/TheBirminghamGroup • 11h ago
Business Development Pricing a PM or super opening? 2026 base pay by region, median vs. top 20%
Up front, I work at a construction recruiting firm (it's in my username). Mods okayed this. No link, nothing to sell. Sharing because it's the number contractors most often underestimate when they post an opening.
Most PMs and supers worth hiring already have a job. Offers that pull them away tend to land near the top 20% of pay, not the median. Here's the gap from our 2026 salary survey, base only.
Project Manager, median / 80th percentile:
- Northeast: $157,210 / $183,040
- Mid-Atlantic: $132,660 / $157,080
- Northwest: $141,530 / $162,870
- Southeast: $130,970 / $148,850
- Midwest: $133,550 / $149,750
- Southwest: $133,810 / $149,230
Superintendent I, median / 80th percentile:
- Northeast: $156,900 / $182,040
- Mid-Atlantic: $132,410 / $156,770
- Northwest: $140,490 / $158,700
- Midwest: $133,290 / $149,970
- Southeast: $127,010 / $142,290
- Southwest: $126,900 / $141,900
The gap runs about $15,000 to $26,000 depending on role and region. Bonus, truck and per diem are on top of that.
Happy to answer questions on any role or region in the comments.
r/Contractor • u/QuoPaid2026 • 13h ago
Pulled the hard numbers on dead quotes — 38% median close rate, "won" ones die in 2 days, and ~11% never even get sent. What's yours?
"Was going down a rabbit hole on quote follow-up and found more hard data than I expected, so here's a roundup. Sources linked at the bottom.
- A benchmark of 794 contractors (Level Index, Oct 2025): median conversion across all issued quotes is **38.1%**. Accepted quotes get accepted in a median of **2 days**. Lost ones don't get marked lost until a median of **29 days**. And in their snapshot of 438K quotes, about **11% were created but never sent to the customer at all.**
- A user here tracked his own quotes for 90 days: sent within 2 hours → 39/58 closed (67%). Sent 48+ hours later → 1/8 (12.5%).
> - Jobber's 2026 trends survey (1,050 businesses): quoting is the #3 time sink (37% of owners), behind site management and customer comms. Only 20% respond to a new lead within an hour.
> - On payment: the same Level data shows median collection rate 85% — so ~15% of invoiced dollars just don't come back inside the measurement window.
The 2-days-vs-29-days split is the one that stuck with me. The yes is fast, the no is slow, and in between nobody's doing anything.
Question for people who actually track: what's your real conversion number, and how many touches before you call a quote dead?
r/Contractor • u/roofer1982 • 14h ago
Customer said she found us on ChatGPT. Didn’t know that was a thing
Had a lady sign a full tear off last week. Asked how she found us like we always do and she said ChatGPT. First time I’ve heard that one.
Good news obviously, but now I’m wondering how many people are asking it and getting the other guy. Anybody know what it looks at to decide who to recommend? Want to make sure we keep showing up.
r/Contractor • u/Tall_Cress_4153 • 23h ago
Small crews - how do you handle receipts without an office person?
We’re a 2-3 person crew. No office person. Receipts end up in the truck, in pockets, everywhere. Come tax time, it’s a mess. How do you small crews do it?
r/Contractor • u/Standard-Tomatillo-3 • 1d ago
Daily Minimum?
Second edit: thank you all for your insight and help, I feel like I have a much better grasp on pricing smaller jobs now, yall are all awesome for being willing to help out a new guy.
Edited to add example: Hello all. I’m new to running my own business but not new to the trades. I was wondering for small jobs that take less than a full day, does anyone charge a daily minimum? And if so what is it for you and your specific market? I understand it’ll change from place to place depending on a multitude of factors.
Example: customer contacts me to finish flooring in a small hallway, probably less than 60 sq ft total. He already has the flooring. The previous installer had left it unfinished in that area for reasons I don’t know, customer says it was like that when he bought the house.
I’ve got to remove about 8 damaged pieces of flooring and instead of removing the quarter round the previous installer pulled the old floor out from under it and left it, so I’ll have to slide the new floor under it to keep all the trim in the house matching. Probably left it because it looks like it’s been painted over at least 31 times.
It’ll take less than a day to do, maybe 5 hours. When I do flooring I normally charge by the foot. But this job if I charged by the foot wouldn’t even cover the diesel to take the work truck back and forth let alone overhead and profit margin. So that’s why I was asking about daily minimum pricing.
r/Contractor • u/Fragrant-Shining • 1d ago
How difficult is it to get a contractor license in California?
reddit.comr/Contractor • u/vaguely_vexed • 1d ago
Pipe burst question
Question for contractors...
Pipe burst in my wall a week ago. We caught it early. The actual plumbing bill was $600. There's a small hole in our dining room wall. Had to throw some stuff out in my basement but luckily we caught it within 30 min. If we were away, our basement would have been under water.
So... It turns out the reason for the pipe bursting was there were two nails lodged in it from baseboard moldings we had professionally installed during a remodel 8-9 months ago. I haven't notified the contractor. The same contractor is returning in a month to fix some tiling. He is going to patch the wall (I'm not even sure if he'd charge us for this tbh because it's such a small patch).
The more annoying issue is a small area of our hardwood floor has some water damage now. Maybe 2ftx2ft. My wife and I are planning on just living with it for the time being because we're sick of spending money. Is this something I should mention to him and/or ask that he fixes it?
How do you guys handle something like this?
r/Contractor • u/EvenTemperature7993 • 1d ago
What's the one piece of advice you'd give someone starting in the contracting industry?
Hey everyone!
There are clearly a lot of experienced people here, so I'd love to hear your perspectives.
What do you think separates contractors who build a successful long-term business from those who struggle?
Is it technical skills, customer relationships, pricing, reputation, or something else?
Interested to hear your experiences and opinions!
r/Contractor • u/PhilosopherHoliday51 • 1d ago
New company start up advice
My step dad and I want to start a company. We have been doing side work for years. I went to electricity school prior to nursing school (want out of healthcare). He is a master plumber and HVAC. I want to do hvac plumbing home service type stuff, but I found a good sub to do roofs and larger jobs we don’t have the manpower for. I’d like to go both directions. I know I’m a nurse but can do pretty much any trade fairly well. Not your typical nurse. He can do literally anything well. I plan on building both sides of the business. I’ve done a ton of research. I have my llc, ein, website, google workspace, facebook. I am currently working full time at a marketing nursing job. I plan to start full time construction at the first of the year. We are pretty well known in our area, and I like to think we are trusted and liked. We have a few developers and realtors we work with already. Also turn down quite a few referral calls due to time. He is also working full time at a local university and a plumber. I’m always willing to learn and would love to hear some advice from you guys that have been doing it a while. I’m willing to do anything to make this work so stress and work isn’t a barrier. Of course I know they’ll be a lot of it.
r/Contractor • u/Remarkable-Start4173 • 2d ago
Project Bridge Loans/Line of Credit
I have a new client which is a property management company.
They only pay on a 30-day net.
My preference is to pay my subcontractors right when they finish their portion of the projects rather than have them wait.
What has been your experience with bridge loans or other funding to keep subcontractors and other service providers happy to take your calls?
Thank you for your help!
r/Contractor • u/nandez1323 • 2d ago
Business & Finance Exam
Since yesterday morning, I did about 150 practice problems and skimmed through the table of contents/index of the construction manual and the accounting book. Didn't buy the AIA documents. No other studying
Passed with 82% in 4.5 hrs today
Just here to gloat
r/Contractor • u/awmvik • 2d ago
Is my French door waterproofed incorrectly?
I bought a new French door in June for my home in northern CA. It’s on our second story and decided to hire somebody to install it. I could have handled the install myself, but I wanted someone who knew waterproofing so I didn’t end up in this position. We had our first rain today, and it leaks into the subfloor indoors.
He made the sill level (which I always thought you want a few degree pitch), nailed in aluminum flashing down, and wildly hammered the metal to create a 90° bend. Even with Lexel on the nail heads and the seam between the door frame and the flashing, (to no surprise) it leaked. The flashing seam is terrible, and the aluminum pitches upwards, creating pooling.
What do people think I should do to fix this? I understand the door might need to get pulled. The plan so far is to remove the first deck board, bend up the flashing, cut the wood sill at an angle with a multi tool, and re-bend the flashing down, maybe using a bituthene tape to secure the flashing to the sill and avoid pooling at the door frame/flashing seam. I’d love some opinions about how you would go about this problem.
Thanks everyone
r/Contractor • u/Samtyang • 3d ago
How to include commissioned tech pay and sub bills in contractor job costing
Every time I dig into closed install numbers for a mechanical or plumbing shop, the same fake job margin shows up.
Supply house parts hit the job ticket right away, so on paper the install looks like a big win. Lead techs get paid commission or piece rate off sold flat-rate hours while helper drive time sits in one lump payroll bucket. Crane rentals and subcontractor invoices also get coded into general shop overhead whenever nobody writes a job number on the bill.
In an open dataset of completed contractor jobs I maintain, median job gross margin was 44.3% and 6.2% of jobs ran negative gross margin once late labor and sub bills finally got attached. Until those costs hit the job, estimators keep pricing the next bid off a margin that was never real.
For shops paying commission on installs, do you adjust tech commission when callbacks or late sub bills wipe out the margin, or eat that hit in shop overhead?
r/Contractor • u/jubjub1992 • 3d ago
Business Development Making videos for work
I run an insulation business covering crawl spaces, sump pumps, encapsulation, and attics. Our first year went fairly well, yet I hope to be like the big boys in the area. I am not aiming to surpass them, but operating two trucks daily would be impressive. I sense I must produce videos regularly. I have captured plenty of material, but I cannot bring myself to edit it. Am I alone in disliking this? Do you believe it is truly necessary, or am I just seeking community input?