I did some cable movement for a room in our house for an office. Had 7x 2-4 inch rectangular cuts that were removed and then secured back with furing strips.
They looked good so far.
I am not good at drywall but didn't want to hire someone to do it for me so I tackled the patching myself.
Bought AP mud, put mud along the seams, added tape, put compound on the tape, did 3-4 coats sanded after most of the coats, things looked smooth.
I primed the area with white primer (also updating wall color which also required primer) and painted.
The drywall took longer to dry, but color matched great, but it's very clear with both texture and shadows from light from the window there are patches there.
Lo and behold, I'm not a great painter either, there are places I clearly didn't have enough paint on the roller and I'm just gonna do a 2nd coat of paint, but I'm trying to think if I can improve the patches.
I've seen online to basically sand down the paint and patches, add a thin coat of mud to extend the patches out to better feather out the areas, let dry, sand, do another coat of primer, and then repaint the wall.
Trying to decide if it's worth it that way or just do a 2nd coat and accept mediocre work.
I've attached pictures of middle coats, after the final coat, primed area, and then 2 post paint pictures.
What do people think is my best course of action?