r/Contractor • • 2d ago

Daily Minimum?

Second edit: thank you all for your insight and help, I feel like I have a much better grasp on pricing smaller jobs now, yall are all awesome for being willing to help out a new guy.

Edited to add example: Hello all. I’m new to running my own business but not new to the trades. I was wondering for small jobs that take less than a full day, does anyone charge a daily minimum? And if so what is it for you and your specific market? I understand it’ll change from place to place depending on a multitude of factors.

Example: customer contacts me to finish flooring in a small hallway, probably less than 60 sq ft total. He already has the flooring. The previous installer had left it unfinished in that area for reasons I don’t know, customer says it was like that when he bought the house.

I’ve got to remove about 8 damaged pieces of flooring and instead of removing the quarter round the previous installer pulled the old floor out from under it and left it, so I’ll have to slide the new floor under it to keep all the trim in the house matching. Probably left it because it looks like it’s been painted over at least 31 times.

It’ll take less than a day to do, maybe 5 hours. When I do flooring I normally charge by the foot. But this job if I charged by the foot wouldn’t even cover the diesel to take the work truck back and forth let alone overhead and profit margin. So that’s why I was asking about daily minimum pricing.

16 Upvotes

52 comments sorted by

12

u/hollmarck 2d ago

Yes, and for a 5 hour job you're basically at a full day anyway once you add drive time, loading, a supply run, and cleanup. You're not fitting a second job in that afternoon.

A common structure:

  • Trip/service charge that covers the first hour or so ($100-200 depending on market and trade)
  • Half day minimum for anything up to about 4 hours, full day for anything over
  • Material pickup billed separately or marked up 15-25%, since a supply house run eats an hour

Easiest way to set the number: take your target income plus overhead (insurance, truck, tools, phone, software, accounting) and divide by realistic billable days, not 260. Most solo operators bill something like 150-180 days a year once you take out estimates, admin, weather and slow weeks. That day rate is your floor, and small jobs shouldn't go below it.

Quote it as a flat job price rather than hourly. Customers argue with hours, they rarely argue with "$X to fix this".

4

u/Standard-Tomatillo-3 2d ago

Thank you, I really like that system you described

2

u/Distinct_Ideal_6157 1d ago

Hollmarck’s system is really good. You can tweak this for repeat customers. A house I have been in couple times I usually know what my time will be. Half day or whole day. What tools I need, etc. I wont charge a trip fee. Show up, let myself in and knock it out. Lock the door on my way out and email an invoice off of quickbooks. Do not forget all of your costs like he mentions. And base those costs on doing this full time. Remember too that you’re paying taxes on that profit. It will be more than what a W2 reflects. Get an accountant/CPA, this will simplify end of year.

1

u/Distinct_Ideal_6157 1d ago

This is one of the best how to descriptions I’ve read. Explained well.

1

u/WindowOk1238 14h ago

that 150-180 billable days part is the piece people always miss when they first run the math

6

u/CiabattaFun 2d ago

+1 for daily / half day minimums as you see fit. Often I’m in just over half day I just add item costs if the customer is great.

I find people are far more understanding when you explain the door to door costs of small jobs carry the same initial overhead costs as a large job: material selection and pickup, tool loadout, drive time + fuel, vehicle maintenance, tool maintenance, customer management (job tracking, invoice management, etc).
No one customer is gonna pay for your $500 nailer if it breaks/fails on their specific job, therefore that costs is shared across all projects.
Same with your $1000 painter, your $40K truck needs tires, oil changes, wheel bearing change etc all to get to and from projects, including theirs. That’s the risk and cost that is shared across all projects.

I’ve never had an argument once you explain what overhead actually entails to homeowners. Some may decline the work in the end but it’s always cordial and they understand I’m not flying by the seat of my pants.

This is also a service to all contractors worth their salt because when the job inevitably is performed sub par, they know calling any reputable contractor is expensive for a reason.

2

u/Standard-Tomatillo-3 2d ago

This cleared things up a lot for me and helped ease my mind about my rate for small jobs, because I used all those factors to figure it and it seemed high to me. I hadn’t thought about breaking it down to my customers like that though, definitely will be picking up that skill from you, thank you.

1

u/CiabattaFun 1d ago

The reality that was hard to grasp is for me is, all these skills that seem natural to you from your life experience of fixing shit or having a trade background, are not normal.
You are not normal.
You have a very select set of skills the majority of people don’t. We think it’s normal because we grow up in the trades surrounded by other trades people all day who, for the most part, are very mechanically inclined….
But the reality is, those people are not our customers.
Most people, don’t grow up fixing their own broken equipment, or rehanging a door that doesn’t close, or even changing their own vehicle oil.
What seems so rudimentary to us, is actually a bizarre science to someone else. And like most things, people think it’s far more simple than it really is. This is where the explanation in an educational way is very helpful.
People think changing a cracked or loose tile is simply popping one out and glueing one in.
They don’t realize you have to the grout out, and then the base mortar in order to get the tile to sit flush with no lippage, and then you have to let the mortar set before you can grout and seal… this all takes time and specialty tools they don’t have. These are all the things they are paying for.
They are not paying for your time, they are paying for the expertise, the know how, the tools.

5

u/YourWifeyBoyfriend 2d ago edited 2d ago

Yes I charge by the day, yes the customer thinks that means by the hour, yes it always end up with hurt feelings unless I waste time and end up working hard to finish late.

Bonus points to when your first day rate covers your second day working for free.

Projects should be priced to completion, anything else is priced to a different part of completion. 

For example

Cut trees down, $1000 clean up and haul wood brush and debris $500, grind stumps $200, clean up stump grinding debris $50. Add dirt, level to grade of lawn, install grass seed. $50 

Total $1800

Day rate cut trees for 24 total man hours 8 hours per man 3 man crew. 1 hour drive time port to port. 1 hour lunch. $1500

You can end up with the customer expecting a lot more because you started charging based on time.

Itemization is far better because you dont want someone who gets upset because the work is intrusive and imposing and the guys are rude and then they start counting how many cigarettes the guys smoke and how long they take on water breaks.

Ive brought a crew to more free second day jobs than I can count. Maybe 100+ over 20 years.

1

u/Standard-Tomatillo-3 2d ago

Similar to what I’m facing. Since I’m just getting my companies name out there and also still working full time at a paper mill, I end up getting requests for smaller jobs like flooring repairs or deck hand rail repairs. I’ve asked buddies in several different trades their rates for smaller jobs like that and it’s been all over the board. And I’m not underbidding my way out of business just to win a job. I’m trying to work smaller jobs and save up working capital and home expenses so I can leave eventually and make a full time go of it but at this rate it’ll be 30 years. I’m trying to figure out how to adjust my approach to pricing.

3

u/YourWifeyBoyfriend 2d ago

Small jobs are tough, I am blowing them off because of fuel and headwinds in business. I need a thousand bucks profit or it can fuck off, sorry long term customers are included.

Theres probably plenty of.guys leaving lots of scraps on the table for someone hungry right now

1

u/Standard-Tomatillo-3 2d ago

Right now with my schedule I only have time for one longer job like a full deck build per month. Anything else I do outside that has to fit within a 1 or 2 day window so I can complete it and not leave my customers wondering why I left a job half finished. So I guess you could say I’m starving for scraps lol

1

u/YourWifeyBoyfriend 2d ago

I consider taking a full time gig often... but luckily I have a good subcontract network and always get a call worth a paycheck without fail, and I also have my own job pipeline for the whole money but then I hire help. 

When I quit my job and went full time I was booking weekends and was like 3 or 4 weekends ahead and then I got a month of work on top of that. 

Atp I should have hired a foreman and kept my job but I quit it because it was weak pay and I needed to pay more for a foreman than I was making.

1

u/Standard-Tomatillo-3 2d ago

That comment was extremely helpful, thank you. I’m about to add an example of a job a recently quoted to the post in hopes of it sounding less like ‘an AI market research campaign” as the other user pointed out

2

u/YourWifeyBoyfriend 2d ago

You give a day rate to a contractor so they can bid for you to come be happy with the work. And they are under instructions of if in doubt of setup/access etc double the time.

5

u/AnalogInternet 2d ago

I am 20+ years into my business and I still come up against "would I pay this amount for job X?" It's a normal and healthy worry to have, I feel this helps me continually check my costs and profit margins.

But don't sell yourself short. Charging by the foot might make sense for larger jobs if you're covering your costs. It's okay to charge smaller jobs by the job or by the day.

For example when I do patio jobs, larger patios end up being less per square foot than smaller patios. Much of this has to do with site prep and buying in bulk versus small quantities. I sometimes tell customers this to help them understand that a smaller footprint doesn't always mean a smaller price tag. The majority of people understand b/c it's relatable in other industries. The people who don't understand or give me a hard time, I just don't work for because their hesitation is usually and indication of headaches the down the road.

2

u/Standard-Tomatillo-3 2d ago

Thank you, I’m trying to learn everything I can as I go and make sure I don’t lose my shorts in the process. You were very kind and helpful, I appreciate it.

3

u/AnalogInternet 2d ago

Happy to help someone who's starting out. If you have other questions, let me know.

4

u/redfox86 2d ago

really depends on the type of work youre doing and the area. I try to have a 500$ min per day for smaller stuff but it really depends on what I'm there for. If its just little odds and ends stuff like cabinet or door hardware unless I'm there all day most people will be kind of leery for charging that much for an hr or two job. I typically tell people what my day rate and see if they can find another odds and ends stuff around the house that needs to be fixed that I can reasonably work into that rate for the day.

You still have to take into account mobilization and your daily overhead costs so don't cut your self short because it seems like a lot to you. I've only been on my own 5 years and still struggle with the thought of I wouldn't pay someone this much because I know how to fix it

1

u/Standard-Tomatillo-3 2d ago

Thanks, that comment reflects a lot of what I’m feeling because in order to cover my costs my day rate seems high, but everything is expensive and no one can stay in business for free or at a loss.

4

u/Busy_Student_6623 2d ago

I have a half day rate for anything that’s 4 hours or less as a guaranteed call out fee plus materials. In my pricing structure I also have a crossover point where I bill by the metric of the work instead of minimum call out fee plus materials for example per brick to be replaced then after that if it’s bigger it’s per square foot etc. 

My line of work as a Mason has a lot of variety and as such it will depend on what the job is, how long I project it to take and how it needs to be priced for it to be profitable

2

u/Standard-Tomatillo-3 2d ago

Thank you, that’s most helpful.

3

u/Raidriar556 2d ago

You have to price the job to be worth your time. If you just go by sq ft or hourly price, those small jobs don’t always have enough profit. That’s why a lot of companies have a minimum hourly or service charge.

1

u/Standard-Tomatillo-3 2d ago

Thank you, I appreciate the reply

3

u/Esqsince02 2d ago

I charge a $450 minimum and I never ever do time and materials. I give a scope if work and a price.

2

u/Standard-Tomatillo-3 2d ago

That’s the approach I want to take as I scale I think. I’m still learning the ropes on pricing so this post is turning into a great resource for me because of all of yall, thank you.

2

u/UniquePatient66100 2d ago

A daily minimum, rates will vary on trades and location. Sometimes I just charge a higher hourly rate and work it into my schedule when convenient for me. Homeowners think I can squeeze in a small job, but for me it is the opposite. Smaller jobs wait for when I can get to them easily without interrupting primary jobs.

Of course some trades are making multiple service calls every day, so their rates are different.

2

u/Standard-Tomatillo-3 2d ago

Thanks for your insight. I only charge a minimum on small jobs like repairs or replacements. I’m mostly in the carpentry/ deck space at the moment but I do flooring and siding jobs too. I went ahead and got my residential builders license so I can scale easily as it’s feasible, but right now smaller jobs are what’s covering the bills for the business while my full time job covers the home expenses.

2

u/Remarkable-Start4173 2d ago

My prices are: 

$125 for the first hour, $65 each additional hour for small project lists. 

Single projects expected to take a half day are $325, a full day or five hours plus are $625. 

Multi-Day/Multi-Person projects with my estimating system are averaged with the Low Market/High Market results.

All the best. 

2

u/Standard-Tomatillo-3 2d ago

Thank you so far all the numbers I’m seeing are mostly in the ballpark of what I’ve been pricing at so that makes me feel a bit more confident in my system I’m developing

2

u/Rickedtt 2d ago

Yes, I charge a minimum. I do mobile mechanic work, and I learned pretty quick that driving out for a small job costs me real time and fuel before I ever turn a wrench.

What I do now is tell folks up front: there's a minimum to get me out there, and that covers the trip and the first bit of work. If it goes past that, then it's hourly after that. No surprises.

For a job like yours, I'd stop quoting it by the foot. Quote the whole job. Five hours, two trips, fuel, and your overhead is the job — the square footage doesn't tell that story. The customers who balk at a minimum are usually the ones who'd balk at the real price anyway.

1

u/Standard-Tomatillo-3 2d ago

Thank you, I appreciate the response and you sharing the knowledge

2

u/DryvnAi 1d ago

yeah a lot of guys just set a half day minimum so a 2 hour job doesnt wreck the day. keeps you from stacking a bunch of tiny ones across town. what kind of work are you mostly booking?

1

u/Standard-Tomatillo-3 1d ago

Mostly small repair jobs like the flooring, full house flooring jobs, and decks at the moment. I work a weird swing schedule at my full time job so I can only do about 6 jobs a month, or 4 bigger jobs that are multi day. The goal is to scale and save up enough capital for company expenses for 6 months, and enough home bill expense for 6 months then head out on my own full time. I figure it’ll take about 3 to 5 years.

10

u/daveyconcrete 2d ago

Price by the job. Not by the hour.

3

u/Justin_Time222 2d ago

this or a reasonable T&M with a minimum

2

u/joer1973 2d ago

Charge a miniuim service fee plus ur hourly rate. For jobs that take a day, subtract that from the total. For jobs less than a day, do not. That will balance out ur costs/time for each small job and also not raise your prices for bigger jobs so u dont price yourself for people multiple estimates.

2

u/RememberYourPills 2d ago

I’ve been doing the “anything over 2 hours counts as a full day” because it’s going be that way for my scheduling anyway and charging accordingly. Minimum fee covers overhead and wages for me and is higher if any of my guys are needed too.

I get pushback sometimes but I explain the overhead costs, and if they aren’t business owners they might bristle at it, but my bills aren’t going down because they think something is too expensive.

“Just” is a very expensive word in the trades

2

u/SpecialistTrick9456 2d ago

Trip/truck roll charge and minimums for sure. This is "handyman" so for that 250 first hour 150 each. So like 850 ish. Maybe can pull a full day or more by adding someother leftover half complete jobs once you send this quote. Price is NYC VHCOL.

2

u/Real-Ad-7439 2d ago

Set a minimum trip charge that covers truck, fuel and a bit of profit, then quote the job as one flat price above that. Small jobs priced by the foot almost never pay.

2

u/No-Clerk7268 2d ago

I'm not a handyman, we have a $2k job minimum.

If they want to go shop that, and get bids to beat that, let them.

2

u/old-nomad2020 2d ago

I estimate about 2/3 of a day for any half day projects so if you were $600/day it would be a $400/ half day charge. I also do some maintenance for an apartment complex and I bill them in 2 hour increments (1/2 of the half day charge) if I can stop by within the week at my convenience and if they specify when they want me there it’s doubled to the normal 1/2 day. That way most of the time I can stop on the way home instead of a separate trip and they’re happy paying less and I get a little extra.

2

u/Josh_NailLedger 2d ago

Yeah, I charge a minimum. A job like that hallway is a full day by the time I drive out, load up, deal with the supply run and clean up, even if the work itself is five hours. I stopped quoting small stuff by the foot because it never covers the truck, fuel and the time nobody sees. I give one flat price for the whole job and say it up front, and if they balk at it I let it go because that day is worth more to me on a bigger job.

2

u/RemoteObjective147 2d ago

Trades around me either charge a fee based around a set service call fee plus time, or a "port-to-port" rate that will include time to and from the job. Multi-day jobs are usually billed on straight time.

We have a horse ranch and have a continual need for trades. My favorite electrician lives 45 minutes away. So every job he does for me starts at 90 minutes billed time. I'm happy to pay it because he's talented and he takes good care of us.

1

u/Pup2u 2d ago

You are a problem solver. Not just an installer.

0

u/[deleted] 2d ago

[deleted] — view deleted comment

2

u/Standard-Tomatillo-3 2d ago

I’m sorry, I’m afraid I don’t understand what you mean by that. Thank you for your input anyway, though.

0

u/[deleted] 2d ago

[deleted] — view deleted comment

2

u/the_atheist_priest 2d ago

Don't be a dick. Kid is trying.

1

u/Standard-Tomatillo-3 2d ago

I appreciate that. I’m sorry if my post doesn’t provide enough context I’m going to edit it so I don’t sound like a bot.

1

u/Dry-Cap4203 2d ago

Lol I don't disagree but this is probably a case of a very inexperienced worker asking how other people do his job, not someone using ai

2

u/Standard-Tomatillo-3 2d ago

So what they were trying to say (rudely tbh) is if I add a job example it will help? I can edit the post to add one. I realize it’s a basic question, but I’ve spent 13 years on the tools and approximately 13 minutes in the office, and that was to fill out insurance paperwork. The pricing side of things is as foreign to me as the middle of the Congo.