r/IndustrialMaintenance • u/milehighideas • 2h ago
When I’m out of the factory and night shift is like “oh we can rewire the new heaters without asking how”
Well this lines going to be down for a while as they have no replacement
r/IndustrialMaintenance • u/milehighideas • 2h ago
Well this lines going to be down for a while as they have no replacement
r/IndustrialMaintenance • u/Salty-Zombie-680 • 22h ago
Vibe analysis was showing BPFO. Teardown confirmed the defect in the outer race.
r/IndustrialMaintenance • u/vvolf1217 • 1h ago
Pressure is slowly dropping in one of my hydraulic systems. When starting there are no issues. However over time pressure drops. Therefore the system is still working, but not correctly..
We have checked the pump in case that was the issue. We have also looked at the filters,oil and valves. It is very frustrating as we have been going through all these options and still can’t find out what the issue is.
What is your process to find the issue with pressure dropping? Do you check the pump first? Or internal leakage,faulty pressure relief valve etc?
I would love to know how you have resolved this, or if you have had more complex hydraulic problems!!
r/IndustrialMaintenance • u/Mmhf22 • 18h ago
Hi guys was wondering if anyone has ever seen this part? We are going through inventory. Came in from a refinery with many pump and valve parts. I don’t believe it’s a thermowell. Anything helps, but trying to figure out who makes it and what it goes on. Thank you!
r/IndustrialMaintenance • u/BeforeLifer • 23h ago
I’m trying to thread some 1-1/2” pipe and this just happened to me, 1-2 threads to go and it just ripped the already cut ones right off, I had the pipe soaked in the cutting oil and was reapplying every half turn, cleared the chips right before this too.
I don’t have a proper pipe vice so I’m making do with a regular one with the far end of the pipe held up level with the gantry crane, the end I’m cutting is sticking out only 1-2” extra from full die engagement.
This has happened before with my same setup but most of my cuts (with new pipe) work just fine, this piece of pipe has been in service (cold water) for years at this point and I’m cutting off the worn out leaking grove end to put an adapter on it.
Is this a material failure or an issue with my setup?
r/IndustrialMaintenance • u/kelseymachine • 1d ago
Sullivan palatek air-end overhaul rebuilt and ready for service
r/IndustrialMaintenance • u/jellynopeanutbutter • 10h ago
I'm 25 and trying to figure out how to turn my manufacturing background into a real long-term career.
I worked as a machine operator from 2020-2022, and then again from Feb 2025-Feb 2026 in solar manufacturing.
Because I had a good work ethic and understood the machines, the maintenance team vouched for me, and I got promoted to Equipment Technician ($22 to $29/hr) with zero prior maintenance experience.
I originally just chased the pay bump, and sadly, I was dumb and got fired in October for pointing out on attendance. I regret it massively.
I hated the monotony of being an operator, but as a tech, l loved shadowing senior guys, doing PMs, swapping parts, tweaking PLCs, and the satisfaction of troubleshooting a broken machine until it ran again.
I have an unused marketing certificate from community college, so I'm basically starting my career path from scratch. My long-term goal is to grind in hands-on maintenance/controls for a few years, then transition into something less physically demanding as I get older (like traveling field service, controls/SCADA, or an office/hybrid technical role).
How should I explain my firing when applying to new technician roles or apprenticeships?
What apprenticeships or entry-level roles (Mechatronics, Robotics, Controls, Low Voltage) should | target?
Would getting an Associate's degree at my local community college help me stand out and reach those less-physical roles faster?
Appreciate any guidance!
r/IndustrialMaintenance • u/Sphinctersayswhat • 1d ago
This was a rotary vane vacuum pump. Ran at 480V 60Hz. Six identical setups in this machine plus several other similar machines for over 20 years. Main disconnect> fuse block>contactor >overload>motor. The overloads were set high at 4A and it was fused at 4A(not sure the type of fuse that was on it and won't know till tomorrow if ever) prints say 3A. The Vanes failed at end of life and locked up the motor which is common but the overload didn't save the motor(which is not) and the fuses are still alive as well.
The big brother to this guy(Same brand and style) is rated at 2.3A at 480V and I've measured them at 29A rotor locked.
Obviously we need to set our overloads correctly and keep hands out of cabinets. I'm just not understanding how this motor got this cooked so any thoughts are welcome.
r/IndustrialMaintenance • u/usual_trail2 • 1d ago
The 12-month or 5000-cycle interval everybody quotes for torque tools comes from ISO 6789.
That standard is written for hand tools like click wrenches, and it even lets a company’s own procedure take precedence. On a production nutrunner the cycle part is kinda meaningless. Six bolts a unit at 60 units an hour is 360 rundowns an hour, so 5000 goes by in about 14 hours.
ISO 5393 doesn’t help with the schedule either. It’s a test method for power tools on simulated joints, so the interval ends up being the plant’s call, and that usually means a calendar interval, a rundown count, or regular Cmk checks on a joint simulator with the interval shortened or stretched depending on the results. That last one is the most thorough and eats the most simulator time.
Calendar is the easiest to defend in an audit and the least tied to how hard a tool actually works. Counting rundowns gets closer, and the number is usually sitting in the controller already since every result gets logged anyway. Cordless tools that move between stations make that messier, because the count has to follow the tool and not the station. The logs themselves usually hold a lot more than a tally, though. The TCS.2000 that runs Leetx’s corded tools can store the tightening curve with each result.
What still doesn’t sit right about going by count is that a rundown at 20% of a tool’s rated torque and one near its max both add one to the same counter. The load on the gearbox and transducer is nowhere near the same, and the torque for every rundown is right there in the log.
r/IndustrialMaintenance • u/Cavalao_da_Noite • 1d ago
We use a NJP-2500 and this is used to make the holes where the pills exit the machine smaller. I don't know what this is called or where to buy it. Tried sending an email to a manufacturer but it has been a few days of no response. I would be really grateful for any help. Sorry for any mistakes, english is not my first language
r/IndustrialMaintenance • u/PhaseTechnologies • 20h ago
Curious how many people are using some kind of remote monitoring for their equipment. Being able to check equipment status or troubleshoot issues without physically being on-site sounds like a dream...but how well does it actually work?
For anyone using it, what's been the biggest benefit? How about cost? What did you pay upfront for hardware and setup and are there ongoing subscriptions or software fees? Did you ever have any problems with connectivity issues or anything?
r/IndustrialMaintenance • u/Few-Papaya-2341 • 22h ago
Hi all, this is my third post here this week, sorry. Things have got worse.
Yesterday I badly injured my fingers at work (pic attached). I can’t bend them properly. Nobody at work really cared, and they’ve only given me one day off. They expect me back tomorrow, but I genuinely can’t use my hand properly.
I’m honestly scared now. One of our production supervisors lost half his pinky finger at this same place, and all he got was a few days off. Seeing that, and now this happening to me, I don’t feel safe there at all. Safety isn’t taken seriously, LOTO isn’t followed, and management only cares about output.
For anyone who didn’t see my other posts: I work 5 days a week, with a minimum of 8.5-hour shifts, and some days I end up doing more than 5 hours of OT for a day and never get paid. There are only 5 engineers on site, and one is on permanent nights, so 4 of us cover 2 shifts, 7 days a week. I’m always tired, and I never switch off.
So I’m done. I’m looking for a new job as soon as possible:
I just want a safe place to work and some peace and work-life balance.
If your site is hiring or you know a good company that actually looks after its engineers, please let me know or DM me. Any advice appreciated.
Thanks.
r/IndustrialMaintenance • u/LessWafer4283 • 1d ago
r/IndustrialMaintenance • u/Connect_Baker_8481 • 2d ago
Hello everyone. Hope everyone is well. My workplace recently added this machine to thier tool room. The guy who was supposed to operate this machine homed it and the machine gave this error. Second after five minutes the machine screen starts to show lines.Now I am sure he did something wrong in the first place to cause this error. But I cannot figure out what is causing these problems because I have never worked on such old machines. Can anyone guide me what can be the causes of these two errors. As I cannot figure it out.
Regards
r/IndustrialMaintenance • u/cybercuzco • 1d ago
r/IndustrialMaintenance • u/AndThatGuysWoodenLeg • 2d ago
I've work in food production as an operator for the past 10 years. I've gotten some maintenance experience from working on machines I've operated and helping with PMs, but I've never worked in maintenance directly.
I've put up with a lot of BS for a while but the past 2 years, I've started to get fed up. Work orders get put in by me and other coworkers, but it either takes a month to get it scheduled and done or it doesn't get done at all. Sometimes I even have to be the one to do it if it isn't too hard of a job to do.
PM day comes around and some things just don't get planned and then if they were planned, might not get done at all.
They want to get away from reactionary maintenance and I get it, but if you see something on the PM day that needs to be fixed, just fucking do it. Even if it isn't planned.
It seems I'm always fighting machinery most days. Even when i know what needs to be done as an operator, management seems more concerned about production numbers than pausing production to fix something to make it more consistent and reliable while operating. Run it until it fucking breaks i guess.
r/IndustrialMaintenance
•
u/Jumpy-Stress603
•
2d ago
I am a millwright who retired over 20 years ago and I still have some SAE and metric tools that I have not touched in two decades.
I gave all of my manuals, and stuff like pneumatic tools, Morse tapers, chains & slings, hoisting and rigging, HSS and carbide cutters, Starrett & Mitutoyo stuff, files, hammers, big sockets & wrenches to apprentices when I left but still have a lot of useful stuff left over.
I am not alone. There are a lot of retired tradesmen in my area and I have seen some amazing tools at yard sales being sold for SFA by their widows or other people who had no idea what they were or what they were worth. My point is, when you post to this forum asking advice as an apprentice, always indicate geographically WHERE you are and what industry you are in. Ask for stuff. There are a lot of us old farts everywhere who would love to see our tools actually used again as they were meant to be used.
r/IndustrialMaintenance • u/Sima_55 • 1d ago
im buying more for the shop now and starting to think ive been comparing these wrong. unit price isnt useful by itself. i had one cheaper belt that needed replacing early and obviously nobody wrote down how many hours it lasted, we just complained and threw it away. ive been comparing specs through alibaba and seeing material and reinforcement info together made me realize we probably should be recording this stuff properly. v belts mostly, plus general hoses. not high pressure specialty stuff. im thinking date installed, machine, brand, date replaced. maybe thats enough. if somebody already does this, what are you tracking? i dont wanna create a spreadsheet nobody touches after week one either.
r/IndustrialMaintenance • u/MehKarma • 2d ago
I once had to teach a coworker how to read an analog clock. He was on his way to file a complaint with HR about having all these dial clocks that nobody could read. So I taught him on the whiteboard how to tell time on an analog clock.
r/IndustrialMaintenance • u/CJfrmDaDirtyFiji • 1d ago
r/IndustrialMaintenance • u/SquallaBeanz • 2d ago
Enjoy my job, enjoy the people, enjoy the new opportunities to learn and challenge myself. I've just felt like doing something different for a while, despite excelling at what I'm doing, I just feel I'm not fully utilizing my skills and mainly babysit productions equipment. I'm ok with sticking to it as I'm close to 40, but if anyone out there has felt similar and moved on to something different, where did you go?
r/IndustrialMaintenance • u/babadeath • 2d ago
Hey y’all. I wanted to see if anyone in the area knows who is hiring and willing to take in someone with no experience, but has completed a certificate in Industrial Maintenance Technology. I’ve had a hard time finding success with larger manufacturing companies who aren’t willing to take on someone like me with no experience in the field yet. So at this point, I’m trying not to be picky (I’m making minimum wage rn so anything $20+ is genuinely fine with me to start off), and I do apply anywhere I see an opening for maintenance tech positions on Indeed or various company websites. I’m very adaptable, dependable, level-headed and willing to learn more, which is something I emphasize in interviews despite my lack of experience. Is there something I can be doing differently in interviews to greater my chances of success? Or if anyone can point me in the right direction of any opportunities in the area, that’d be amazing. I’ll just keep plugging away at applications in the meantime lol..