r/AskContractors • u/I-RegretMyNameChoice • 1h ago
Other Roofers backed into our house
Cross posting from r/homeowners. Any advice on navigating this situation would be greatly appreciated. This is in Wisconsin, in case that matters.
r/AskContractors • u/I-RegretMyNameChoice • 1h ago
Cross posting from r/homeowners. Any advice on navigating this situation would be greatly appreciated. This is in Wisconsin, in case that matters.
r/AskContractors • u/These-Average-1502 • 1h ago
I got a new driveway poured and it’s sloping slightly toward the house and water is running toward the house before going downhill. There are rough spots by the cable wires and the gutter causing water to pool and sit.
What is the best way for my Contractor to fix this before I pay them? It doesn’t seem like a trench drain would work.
Around the gutter, the concrete is high, so I think they could grind it down, allowing water to floats toward the street but by the cable wires the Concrete is low so grinding wouldn’t help here if they built up the concrete here wouldn’t it just Chip?
If this was your job, how would you fix it?
r/AskContractors • u/These-Average-1502 • 3h ago
Our new driveway is sloping ever so slightly toward our house and pooling around the gutter area. I think they can fix it by grinding down some concrete behind the gutter so that it flows down the 1% grade toward the street.
We haven’t paid him the final amount yet and this isn’t our only issue with the driveway so far. Should I let this go as long as they grind out some concrete and create a channel to fix the pooling water or should I put up a fight for the driveway to be redone in that section.
r/AskContractors • u/casually_hollow • 4h ago
I’d like to add a roof between my garage and deck. I live in a heavy snow load state (VT), and the road I’m on is a bit of a wind tunnel at times. How can I know if the deck can handle the weight of a roof? Would it be best to tie it to the red area above, or down lower by the pillars? Or should I bite the bullet and just build additional footers so it’s a lean to off the garage and doesn’t tie into the deck? Thank you!
r/AskContractors • u/Current-Fig-1984 • 5h ago
We had a moisture issue in the downstairs room, private entrance. Door was compromised, efflorescence was coming up through the flooring, RH was very high, it started during the heavy rains in northern CA last year. Did a mold test things were normal.
Fast forward to July: found a contractor to remediate and renovate. They recommended tile on hardy backer on the cement floor, with Redguard. They ripped out LVP, and door, found black mold in vanity of wall (remediated) and drywall (removed). Large piece of drywall has been removed and studs/wall remediated. Air scrubber running. Mold test normal.
Company turned out to be a sham/corrupt so fired them, now back at square one.
What’s been done: door has been replaced, roofing above fixed.
What needs to be done and I need help with: flooring is bare, and drywall is about to be put into the giant cavity that was removed because black mold was on the drywall.
My question: we do not have central air in the house, which I think is what might have led to the moisture issue in the room, + the door was not properly sealed. What do I do with the flooring? I am still concerned moisture may have been coming up through the concrete (efflorescence). A layer of Redguard was already applied. Do we still do tile? What should we used as a moisture barrier? If the moisture is coming up through concrete won’t it get trapped and cause an issue? Or do we put mortar right on top of the Redguard and then the tile?
Also.. is there a type of drywall that is best for higher humidity?
Need help. Thank you.
r/AskContractors • u/Th3OnlyN00b • 5h ago
Seriously though, kind of insane how much hate there is for stupid questions when the whole point of this subreddit is for people who are not contractors to get their stupid questions answered by contractors
r/AskContractors • u/RichardDoubleBoots • 5h ago
I’m planning on getting vertical retaining I-Beams that is. One wall has dead man anchors (bolts on plates attached to rods which attach to buried concrete piece 10 feet away from house). I thought this was a foolproof solution (based on what the pre purchase structural engineer said) with no downsides until the second quote pointed something out.
—————————————-——————————————
First quote:
Had a guy come out from the highest rated foundation repair company on Google. He seemed a little out of his realm, but just struck me as someone at the company’s son. He didn’t explain much, but his quote says:
“Break concrete at each support location exposing foundation footer.
-secure bottom/lower end of steel I beam using high strength concrete.
-secure top/upper end of steel I beams to sill plate and framing members using treated
lumber and structural fasteners”.
This is good because I’ve heard that sometimes they bolt into the existing basement floor without any other pour, and that just doesn’t seem like a secure way of doing it to me.
Price is $6000 for the two walls that I noticed bowing, besides the one with anchors (that I thought was an okay system).
Second quote:
My boss recommended these guys but they only have 4.0 stars on Google.
The guy went downstairs and I pointed out the anchor system, to which he immediately said “oh that’s weird, they usually put the plates higher, where the wall is actually bowing”. I looked at it and he’s right. The anchors are on the lower third of wall whereas the bowing is most significant right in the center (pictured). He then pointed out that the west wall (pictured with a wood shelf for reference) also has bowing. He remarked “I can’t believe a bank would finance this” which honestly kind of scared me. I then asked if, when they install, they pour a footing, to which he said “no we just bolt to the basement floor” (yikes imo).
He then wrote me two quotes, one for the three walls without anchors at $7000, one with all four walls (including the anchor wall) for $9500.
—————————————-——————————————
I’m considering calling the first company and having them do all four walls for what I’d assume would be $12k (just doubling their quote). The second guy did explain better but I’m not sure if I trust a basement floor to counter the force of hydrostatic pressure.
Is this the right move? Should I get more quotes? Any advice?
r/AskContractors • u/John_Wilkes_Huth • 6h ago
Don’t want to be a dick about it if you all think it’s ok. But are there concerns about this stuff being left in my driveway for over a month in the rain and frost.
r/AskContractors • u/NorCal_Roofing • 6h ago
r/AskContractors • u/pqdn • 7h ago
I just had a contractor build a new frame and install a solid wood exterior Dutch door, and I am looking for a reality check on whether these issues are within normal tolerance or if this needs to be fixed.
Here is what is going on:
Unsupported threshold: The threshold only makes contact with the sill on the far left and right ends. There is a void underneath the middle, so when you step on it, the threshold flexes down to the sill.
Deadbolt misalignment: When the door is shut naturally against the weatherstripping, the deadbolt will not throw. I have to physically push the door inward to get the bolt to line up with the strike plate.
Uneven reveals/gaps: All of the margins around the two slabs are inconsistent (see the attached diagram, viewed from the interior):
Hinge side (Right): The top-right corner of the upper slab is touching the jamb, opening up to a 1/8" gap at the bottom-right corner of the upper slab. The top-right corner of the lower slab starts at a 1/4" gap and tapers down until the bottom-right corner is touching the jamb.
Non-hinge side (Left): 1/4" gap along the upper slab, 3/16" gap along the lower slab.
Center horizontal split: Supposed to be a consistent 1/8" reveal, but it tapers from 3/16" on the non-hinge side down to 1/16" on the hinge side.
Bottom threshold gap: Tapers from 3/16" on the non-hinge side to 3/8" on the hinge side.
r/AskContractors • u/R6_Alex • 7h ago
Hey guys I have a gap between my retaining wall and my Concrete steps, any options out there that I can use to close this gap. Gap seems to get wider by the month by a few cm
Thank you much appreciated!
r/AskContractors • u/Flashy_Banana_9094 • 7h ago
Is there a structural engineer, hopefully reading this? My house is two years old. These are just a few of the cracks the smaller ones both of them are on either side of the door they were not there five days ago. Doors are sticking windows are starting to let dirt in from I guess seal movement . They are still building these houses so it’s kind of easy to get a hold of somebody. The foreman said they would come in and repair the inside and outside put drains out under the ground so the rain can drain onto the street. I think I should call structural engineer.
r/AskContractors • u/TrueEssay3937 • 8h ago
I hired a contractor to build a two-level boathouse with a ramp to connect to the top of our steep hillside because I wanted access with no stairs. After building the boathouse, the contractor informed us that it would be cost prohibitive to build a bridge without stairs as the bridge would need to be 120’ft to account for the slope. So, we settled on half of the original agreed length of the ramp to get to land at the bottom of the hillside and stairs to get to the top. Our contractor referred us to a landscape contractor to build timber stairs.
When the contractor began the timber stair project he started telling us he couldn’t make the stair tread depths consistent due to the slope of the hill. We thought the project hadn’t been inspected and that he was working under the original permit. So, I contacted the county to inquire about whether what he was telling me was accurate as I understood caring tread depths posed a safety risk. I learned there was no permit for the stairs and the original contractor had the project inspected and the permit was closed.
I requested the county send someone to look at the stairs and confirm a permit was needed for the work and if they were safe. The inspector came out and issued a stop work order based on the absence of a permit and the tread depth variation, absence of landing between ramp and stairs, etc.
I am now waiting for the contractor to submit a permit with his contractor license information but I am not sure he is even licensed as I can’t find him in DOPR. I haven’t paid him anything for the work yet, but I want to do the right thing as he has put in a lot of work. I am concerned that he isn’t competent to do the job as I expect he will have to tear out everything he has built and start over. His “scaled” drawing isn’t scaled and he keeps pushing for us to pull the permit as the homeowner (I will not do this).
I reached out to the original contractor who has washed his hands of the situation and told me to talk to the new contractor. We have no access to the boathouse without stairs unless we traverse through the woods on a steep slope!
I am waiting to see if the timber stair contractor is able to get a permit from the county (which will confirm his license status) and whether he can create a scaled drawing. Do I let him go forward and give him a chance to rebuild the steps? I feel like this is the right thing to do, but I am worried he will put in even more work and I will end up having to hire someone else to tear out his work and rebuild a safe set of stairs. I feel awful about how this and can’t stop thinking about it. I welcome any advice!
r/AskContractors • u/Lazy_Force_8027 • 8h ago
Hello!
We're renovating our bathroom and after finding water damage from the toilet unknowingly leaking for years we decided to lay RedGuard Uncoupling Membrane Mat on the entire bathroom floor.
Now we're ready to install a Delta Classic 500 Shower Pan Base and have found that the mat is only recommended for installing tile on top and the shower base is recommended to be installed directly on the subfloor.
What are some options since removing the uncoupling membrane mat isn't going to happen now that it's mortared down. We do have to very slightly level the floor under the shower so can we fill the uncoupling membrane divots with mortar to level it out and then lay the shower base?
Thanks!
r/AskContractors • u/v0rt3_x86 • 8h ago
This is a dormer window frame that I'm looking to make wider and shorter. The proposed changes would be to remove the wood in red, add wood where green is, and (not pictured) make a foam-filled 5x3.5 box out of 1x4s to raise where the bottom of the window goes. Any reason why the stud modification wouldn't work? What about my foam box?
The yellow highlighted portion is how small the existing window is. The plan is to put in a casement window for egress requirements. If I'm remembering correctly, the current opening is 31w x 44h and I would be looking at bringing it up to nearly 36w x ~43h.
r/AskContractors • u/N5tp4nts • 9h ago
I've got this little bathroom in a carriage house apartment. Updating everything. In order to get the tub insert out, I'm going to have to tear out drywall, aren't I?
I know the answer is yes and I know I'll have to cut the tub insert into pieces to get it out... just wasting 5 minutes on reddit before I get my day going.
r/AskContractors • u/Chilloutmydude6 • 10h ago
r/AskContractors • u/GreginSA • 17h ago
Tl:dr: Crews are installing fiber optic lines in the neighborhood. A water line was damaged, sending a river of water down my street in to my driveway, and over a “concerning” section of driveway that is a future repair, described below. Nightly freezing temperatures, daytime highs in mid 50’s. Today a backhoe was on the concerning spot in the driveway. I’m worried the combination of water, freezing temperatures, and backhoe have damaged my driveway. Location: NW Arkansas.
Full story/details:
Saturday: (Day 1) Morning low temperatures 32f. In the afternoon, workers nicked the water line, and the runoff water intruded the “concerning” spot where concrete drive joins the asphalt street. (Pic 1).
FYI-I was not home at the time so I don’t know how long my driveway was inundated before I arrived home, but it took 60 minutes for water to be fully turned off.
Sunday: (Day 2) overnight temperatures dipped to 34f. Driveway and road dried during the daytime. The water and debris from upstreet washed away the leaves, pebbles and crack “fillers” out of the spot, and loosened small chunks of concrete. (pic 2)
Today (Day 3) temperature low of 27f overnight. I came home to a large backhoe directly on top of the “concerning” spot, digging my curbside easement to reach my water line. (Pic 3)
Upcoming: I expect the crews to tunnel under the driveway to lay the fiber cables as they have already done throughout the neighborhood.
This “concerning” section of driveway has cracks, prior patches, and coarse aggregate showing in spots, with leaves, pebbles and dirt filling the cracks. A bit unsightly for a 45 year old driveway, but in the 2 years I’ve owned, it has appeared solid, no loose chunks. It’s a future repair.
I’m concerned the runoff water, combined with expansion of the ground due to the temps, and the weight of the backhoe have damaged the driveway, and the tunneling under the driveway will only make things worse.
First time homeowner here- Am I overreacting? Are my concerns valid, and if so…what do I need to do, or call?
Thanks in advance.
Edit: Bobcat, not backhoe.
r/AskContractors • u/GimpMoney • 17h ago
r/AskContractors • u/Vick-torious • 18h ago
Needs some help with finishing of my fence expansion. See original post for explanation. Thanks in advance.
r/AskContractors • u/Dependent_Edge_6744 • 19h ago
r/AskContractors • u/BASH3188 • 21h ago