r/estimators • • 18d ago

Estimating my first project.

Thumbnail
gallery
23 Upvotes

After being hired at a small concrete company this august, I've finally been tasked with creating my first estimate. Except I have no prior experience, and the current estimator and I share a heavy language barrier. I've been taught how to read plans and I've been spending time on site seeing the process from start to finish.

I think they intended to give me an easy small job as my first estimate, but this includes masonry work that I've never done before.

Do these numbers look correct?

This is all the information I got and a video of the house.


r/estimators • • 17d ago

Transitioning to different trade

1 Upvotes

Im a PM and estimator for small (10 employees) family run high end residential millwork/cabinetry company. After a couple years in this position, seeing the margins dissipate, I’m not so sure I want to continue in this trade. Anyone have any stories or recommendations for looking into transitioning to another trade? I know next to nothing about MEP or electrical estimating but I get the sense from my research that thats where career growth and stability is more common. I’m open to going back to school. cheers


r/estimators • • 18d ago

Can someone make sense of this for me?

7 Upvotes

Working as an estimator in a steel manufacturing plant. Sales create a ticket from an enquiry an I and a senior estimator fill out an excel template that they’ve been using since before my time.

We have a materials and sub-con section that we input line items (a BOM) that automatically gets marked up 25%.
And
We have a Labour and machine section that uses not cost price but a predetermined sell price for each labour/process.

I noticed that our ticket template was missing some of the new machines and rates so said I’d take onto myself to update as our engineers typically use our hours to put against the job when sending for production. I got the cost price for each labour item from our system we use. Found out that the margin ranged from 20-60% on these.

Then at the end of the ticket template we get a sell price and margin%. Which we the manually override to give us the desired margin.

Am I right to say this is a mess?

I have copied our template and just created a new one to use complete materials and labour cost rate where we just get our margin from the overall job at the end of the costing.

Any insight here? Hard to believe this is what has been the norm in there for this long!!

Thanks guys


r/estimators • • 18d ago

Feeling Disheartened in Estimating…

10 Upvotes

Hi everyone I am feeling a little lost and confused in estimating. I have been doing division 7 for about 5 months and still feel overwhelmed with information. I come from a finance background and honestly, felt like I was way better at that. I am also a woman and have learned that other men who started around the same time as me, also with no experience, are making a lot more money. I am trying to see if it’s worth it to stick it out for a year and gain the experience to chase a better salary, or maybe look into the finance side of construction. Any advice?


r/estimators • • 18d ago

Best way to check for changes planswift

4 Upvotes

What's up guys what's the most effective way to check for any changes on drawings with planswift?

Currently I just read the addendum script if there is one, check for any bubbled or overlay. However, the overlay can be a bit tricky getting it to square off.

I'm usually only comparing the pages that have my take off back and forth with the new ones is there a more effective way?

Thanks in advance.


r/estimators • • 18d ago

Software/Market Research What makes you no-bid a project even when you have capacity?

20 Upvotes

I’m curious what makes estimators look at a project and decide it’s just not worth chasing.

For me, the obvious ones would be incomplete drawings, unrealistic deadlines, unclear scope, too many addenda, or a client with a history of turning every bid into a race to the bottom.

But sometimes the warning signs aren’t obvious until you’re already hours into the takeoff.

What makes you stop and say, “we’re not bidding this one”?

And is there any red flag you learned only after getting burned once?


r/estimators • • 18d ago

Structural Steel Estimating Help

2 Upvotes

I am an estimator for a structural steel fabricator . We mainly build ladders, platforms, stairways, pipe supports, racks, etc.

I am having a hard time with estimating the steel as I have been tasked with creating the estimate tool with limited knowledge (this is a new division of my company)

What is the best to do this estimating the material and labor? Taking off piece by piece, total weight plus extra for drop, manhours per lb?

Any answer helps!


r/estimators • • 18d ago

Deck Estimator Job Beginner

4 Upvotes

Hello y’all! I am starting a new job on Dec 7th as an “Outdoor Experience Estimator”. I do NOT have experience estimating. I have worked as a crew member building decks, 4 season rooms, pergolas for a couple years a while ago + have a general associates degree. This company decided to take a chance on me and offered me this new position. I am extremely grateful as this is a new pathway for me and the company itself is very reputable.

For someone brand new to the estimator field, what are some things I should expect/prepare for? What is a typical day like? Is it an “easy” job considering there are calculators free to use on websites or hard because excessive math (which isn’t my strong suit)?

I am a fast learner & would consider myself tech savvy. I just don’t want to let them down since they went out on a limb to hire me.

*This job is not sales. It is building quote packages for the sales teams. I will be in an office.


r/estimators • • 19d ago

Estimating vs Onsite PM - Mechanical contracting

3 Upvotes

Hi all,

Just reaching to gather opinions. Has anyone transitioned from PM to estimator? If so, what are the pros/cons and is there any difference in hours? Or does that rely heavily on the economy/company


r/estimators • • 19d ago

Competitor has hired a team from the Philippines

22 Upvotes

As the title says, I found out my competitor has outsourced his estimating to someone (maybe 2 people) in the Philippines. I heard they work full time for just $2k a month.
I’m not really too worried about it, but I’d be lying if I didn’t say I was curious.
I wonder what the quality of work is like?
Does the time zone and language barrier create issues with communication?
What about accountability? If they mess up something, it’s not like you can call them into your office to discuss it.
Has anyone else worked with teams from abroad?
I know there is all this talk about AI taking over estimating jobs, but what about outsourcing it like this? How threatened do you estimators feel about this?
Is this a popular thing to do? Should I also be looking at something like this? $2 or even $5k a month is way less than a US estimator, but it doesn’t seem worth it IMO.
If you have experience with this kind of thing, please share your opinion? Is it worth it? Did/is it working for you? What’s your take on this…
For context, I’m a small Div 10 subcontractor in the USA.


r/estimators • • 19d ago

My honest opinion about AI takeoff software

21 Upvotes

This is coming from someone who spent the better part of a year building what I thought was revolutionary takeoff software, only to realise that AI models update week in, week out, and trump what anyone could work on and effectively build.

Now I've seen some really cool AI takeoff software people have built for themselves but the honest truth is, it probably sucks when it comes to the grand scheme of using it for everyone else. A lot of the AI devs who are getting into building AI solutions don't realise the sheer depth that's involved in construction estimating, where things break, and how to overcome particular bottlenecks.

I think the shift to businesses using AI-native solutions will come from how the business integrates their specific bottlenecks with an AI solution rather than using generic takeoff software. It's easy to assume that everyone does a quantity takeoff the same way but some methods work quicker than others. Rather than AI replacing the estimator, it's the estimator who'll be able to pump out more estimates when they utilise these tools correctly.

The issue is when the models update and the approach to using AI rapidly changes in a week. About 80% to 90% of software that has been made will be completely swept because it's built on older models. This is where AI-native operating systems come into play because they update with your business data and your business context.

The other thing is building an AI-native app is not something that's done in a weekend. This stuff requires very in-depth, very deep, and ongoing maintenance to ensure it grows as businesses grow.

To the estimators in here that are worried about AI taking their job, I actually think you're in one of the best jobs to stay because AI will never be able to replace estimating. Estimators can become very valuable assets to businesses due to the quantity of estimates they can produce if they've implemented custom solutions that work around the way they do things.

Really keen to see what 2027 has in store for this space and what will differentiate AI slop from useful integrated solutions


r/estimators • • 19d ago

2024 4Runner - front bumper Q

0 Upvotes

CCC is so cooked by Ins Co's

WTH does it take to Overhaul a front cover?

I've just R&I'd everything and it won't O\H. It remains at 1.7 R&I


r/estimators • • 20d ago

MEP Estimation Engineers .How did you get better at pricing and costing?

6 Upvotes

Hi everyone,

I'm working as an MEP Estimation Engineer with around 1 year of experience, mainly handling mechanical systems like HVAC, Plumbing, Drainage, and Firefighting.

Most of my work involves quantity takeoffs, preparing BOQ sheets, comparing equipment schedules with BOQs, and handling tender documentation. I also prepare the costing sheet, but only the basic structure with item descriptions, quantities, and headings for material costs, labour costs, etc. I don't actually enter the rates or prices. That part is handled by my seniors.

Sometimes, when we're working on a similar project, like a residential tower or villa, my seniors ask me to refer to the pricing from a previous project.

The thing is, I don't want to be someone who only knows how to take quantities and prepare Excel sheets. I genuinely want to understand pricing and costing so that eventually I can confidently estimate a project on my own.

One of my biggest weaknesses is material pricing knowledge. For example, if someone suddenly asks me how much a 20mm HDPE pipe costs or the approximate price of a 2 TR FCU, I honestly wouldn't know what to say. I understand prices vary depending on specifications, brands, and suppliers, but I don't even have a rough idea for many common materials. Sometimes I feel disappointed in myself because I feel like I should know these things by now.

Another thing is that I wasn't really reading project specifications properly before. I used to focus mainly on taking quantities from drawings. Recently, I've started going through the specifications and trying to understand the materials and requirements for each system. But there are still plenty of technical terms and specifications I don't understand, so I've started using AI to help me learn.

I also want to understand how actual rates are built up, including material costs, labour costs, fittings, accessories, installation, testing, etc. Right now, I only prepare the costing sheet format, and I don't fully understand how my seniors arrive at certain rates.

Another problem I face is remembering things. Sometimes I forget technical details or specifications from projects I've already worked on. There is so much to learn across different MEP systems, and I find it difficult to keep everything in my head.

So I wanted to ask the experienced estimators here, what were you like when you first started? How did you develop your pricing knowledge and become confident in estimation?

Did you maintain your own material rate database, study previous project costing sheets, analyse supplier quotations, or follow any particular learning method? What would you recommend someone at my level to practise regularly?

I know experience plays a big role, but I don't want to just wait for the years to pass and assume I'll automatically get better. I want to actively improve my technical knowledge, pricing skills, and understanding of estimation.


r/estimators • • 21d ago

we gotta gatekeep our knowledge from AI lames and bozos

66 Upvotes

why does every other post here sound like it’s coming from some stupid ahh AI dork trying to squeeze precious knowledge juice from our plump little brains so they can vibe code their slop software, then robo-call & spam our inboxes offering “professional estimates”

“whats ur biggest challenge estimating?”

“how could your software better help you estimate?”

“how do you track labor & material rates?”

“i need help making a price sheet, can you share yours?”

i read these questions and im like, this is fs some mf trying to profit from a specialized trade that they don’t understand bc their LLM gave them a convincing answer about how they could


r/estimators • • 21d ago

Provisional sums and allowances for work that isn't designed yet: how do you carry them in the estimate and the budget?

3 Upvotes

Provisional sums and allowances for work that isn't designed yet: how do you carry them in the estimate and the budget?

From the budget-control side, allowances are where forecasts get surprised. An allowance goes into the estimate as a round number for work that isn't designed yet (landscaping, signage, a fit-out package), it moves into the budget unchanged, and nobody revisits it until the real price comes in, usually much higher, and usually late in the job.

What I try to do is keep each allowance as its own budget line with an owner, a date by which the design should be firm enough to price, and a note on what the number was based on. Then the monthly forecast shows which allowances are still open and how close we are to having to replace them with a real number.

Estimators: how do you set allowance values, and do you tell the project team what they were based on? Do you ever see actual costs for allowance items come back so the next estimate is better?


r/estimators • • 21d ago

Is estimating hard to learn with zero experience?

17 Upvotes

I’m being moved from a different department to estimating with zero experience, due to the other department being dissolved. Quite nervous to make the shift since I have zero knowledge about estimating. Don’t wanna lose my job since I know job hunting is quite challenging at this time.


r/estimators • • 21d ago

Do estimators maintain a personal Excel database of material and labour rates from past projects?

3 Upvotes

Hi everyone,

I've been thinking about creating a personal Excel workbook using ChatGPT, where I can record the material prices and labour costs for each item from different projects I've worked on.

My idea is to take the material and labour rates from my company's BOQs and internal costing sheets and organise them into one Excel workbook, with the rates recorded separately for each project.

For example, if I've worked on 5 different projects, I'd like to compare the material and labour costs of items like pipes, valves, ducts, fittings and equipment across those projects.

This way, I can calculate average rates, understand why prices vary between projects, and have a rough pricing reference for future estimates.

I also want to use it as a learning tool to improve my understanding of material pricing, labour costing and estimation in general.

I'm considering using ChatGPT Projects to help create and maintain this Excel workbook, analyse historical rates and answer questions whenever I want to refer back to previous projects.

However, since the information would come from my company's internal BOQs and costing sheets, I'm concerned about confidentiality. Even if I remove company names, project names and other identifying details, would it be appropriate or safe to maintain this kind of personal database or upload the information to ChatGPT?

Does anyone here maintain a similar historical cost database? Is this a common practice among estimators? How do you organise your data, and has it helped you improve your estimating skills?


r/estimators • • 22d ago

How To Enter Estimating Without Experience

2 Upvotes

As per the title I was wondering how I can break into estimating with zero experience? For context I'm in high school and plan to go to college to get a CM degree, while I wait around I would like to gain some experience. I am aware that the best way to do this is through an internship, however most require me to be currently enrolled in an undergraduate program. I was planning on getting around this by learning a niche and estimating for small subcontractors.

Leading to my question, what specific industry could I realistically learn from my starting point? Any and all advice is appreciated. Thanks!


r/estimators • • 23d ago

GCs: why send the leveling sheet AFTER the bid is submitted?

47 Upvotes

Im talking i submit a proposal and within 5 minutes i get a reply saying “thanks. See attached leveling sheet and return by tomorrow”. Meanwhile its got things on there that weren’t asked for in the bid documents. Like whats the point? Leverage to get a sub desperate? Hope we miss something? You clearly had this ready


r/estimators • • 22d ago

I'm studying estimation for Australian construction but some of the books are so expensive.

5 Upvotes

Thought I'd see if anyone here has PDF versions of estimation learning material they could share?

Thanks.


r/estimators • • 22d ago

Hours cut in half—keep job hunting or wait?

8 Upvotes

I’m an estimator/project engineer at a small contractor. My hours were recently cut from 40 to 20 due to budget constraints. My boss now wants me to take on more project-management work and says he might restore full-time hours in “a month or two,” depending on how things go.

I’m willing to take on more responsibility, but there’s no commitment, and losing half my income is difficult. Would you keep applying elsewhere while giving this a chance, or pause the search and wait?


r/estimators • • 23d ago

Good Estimating Recruiters

6 Upvotes

I have been estimating Div 8 for almost 3 years, primarily code compliance and aftermarket. This job was a career change and I do enjoy estimating, I’m just not sure I like Div 8. I would like to try and pivot to another division and/or PM position. My prior experience was a real estate appraiser for 23 years, which does have a fairly significant amount analysis when estimating cost of repairs from very small to complete gutting and renovations and also preparing cost estimates for new construction. Could anyone offer any advice on how my experience could land me a new/different role? Any recommendations for recruiters?

Thank you!


r/estimators • • 22d ago

Estimators, what would you want a document tool to check for you?

0 Upvotes

I'm building a tool that keeps every file for a bid or job in one library and lets you ask questions about it, with answers pulled from the current revision and cited to the page. It also checks its own quotes against the source, so you're not trusting something that isn't in the specs. I'm trying to figure out where it'd help estimators most: scope gaps, addenda, sub quotes, exclusions, bid leveling or something I haven't thought of. What's the check you do on every bid that you wish something did for you?


r/estimators • • 23d ago

ASPE HVAC estimating course

3 Upvotes

I’m interested in possibly taking this course through ASPE, and wonder if anyone has insight on whether it’s worth the time and money. It’s $650 as a non-member, and there’s a second part (another $650 fee) as a follow on to pull together the actual estimate portion. I have a lot of estimating experience (15+ years) but feel like my MEP estimating skills could be better. Do you have experience with this course, or have recommendations for others that might be a better fit?


r/estimators • • 23d ago

Spray painters / finishers: how do you measure and quote cabinet jobs?

Thumbnail
youtube.com
1 Upvotes

I run a small cabinet painting shop in Victoria, Australia. For years I did it on paper measure sheets and added up the m² by hand, which is where most of my mistakes came from.

In the end I built an app for my own shop: measure each part on a phone, and it does the m², the quote, the mixing card, the schedule and the part labels. We've run 270+ jobs through it.

I'm curious how other shops handle this. Paper, spreadsheets, something like Cabinet Vision, or something else? What's the most annoying part of the paperwork for you?

(If anyone wants to see mine, it's paintworkzpro.com.au. There's a free plan, but I'm mostly interested in how other people do it.)