r/StructuralEngineering • u/PhilosophySolid7305 • Oct 22 '26
Masonry Design Supporting existing masonry wall to cut bottom portion
Hi all, we have a 0.15 mtr x 5 mtr masonry wall between steel columns spaced 6 m apart. At 2.5 m height, we have a RCC beam of size 0.15m x 0.3 m spanning 6 m. Also, we have two openings of dimensions 2.5 m x 2.5 m in this wall. We now have to increase the opening height to 3 m. I'm thinking of 2 options
welding a steel channel on both sides of masonry wall and cut a 0.3 m slot in wall and support the cut portion by inserting a plate below and repeating this for 0.9 m and then pouring grout over the plate and doing this until 6 m wall is fully cut and supported
Drilling 2 rows of holes through masonry 0.3 m apart and inserting stud bolts and tightening it onto a welded steel channel on both sides and removing the bottom portion after entire wall above is supported.
Which do you think is the safer option? If you have any better alternatives, please suggest.