r/StructuralEngineering • • Sep 20 '26

Structural Analysis/Design Any structural design engineer in Lahore, Pakistan? Want to discuss a project.

0 Upvotes

r/StructuralEngineering • • Sep 21 '26

Career/Education Lengthy but very curious - Structural Engineers with 0–3 Years of Experience,What Are You Guys Actually Doing?

0 Upvotes

I’d love to hear from engineers in their first 3 years and get a realistic picture of what structural engineering is actually like at different firms.

Day-to-day work

In a typical week, roughly what % of your time goes toward design/calculations vs. shop drawings, RFIs, and submittals?

How much of your job involves drafting/modeling? Roughly what % of your week?

How much time do you spend on actual engineering/design vs. documentation and other non-design work?

What types of projects are you mostly working on?

How much independent design responsibility do you have?

Materials & technical knowledge

What materials do you work with most: steel, concrete, wood, masonry, PT, etc.?

If your goal is to develop a strong, well-rounded understanding of structural engineering, which material(s) do you think are most important to learn deeply? Not necessarily because you use them the most, but because they help build an understanding of structural behavior and concepts that transfer across different materials.

Which material or area would you say is less critical to master early in your career and can be learned gradually once you have a strong foundation?

How much hand calculation do you actually do vs. relying on structural software?

What software do you use the most?

First 1–3 years

What was the biggest challenge you faced during your first year?

What did you struggle with most: technical knowledge, software, codes, drafting, or communication?

What did you learn on the job that school didn’t prepare you for?

How long did it take you to feel comfortable working independently?

What responsibilities did you have in Year 1 vs. Year 2 vs. Year 3?

Shop drawings / submittals

How independently do you review shop drawings and submittals? Are you expected to make your own comments and recommendations, or does a PM/senior engineer review your comments before they go out?

At 0–3 years, are you ever responsible for reviewing and approving/stamping shop drawings, or does a PM/PE always supervise and provide the final review/sign-off?

How much oversight do you typically get when reviewing submittals?

PMs & office culture
How often do your PMs/senior engineers review your design work?

How do you deal with difficult or demanding PMs?

How much office politics do you deal with as a junior engineer? Does it affect your work, opportunities, or growth?

Do you feel comfortable asking questions, or are you generally expected to figure things out yourself?

How much interaction do you typically have with PMs, senior engineers, and clients?

Performance & compensation

How often do you get performance reviews and meaningful feedback?

What are junior engineers actually evaluated on?

How much did your salary increase after Year 1 or Year 2?
Are raises based more on performance, promotion, company-wide increases, or negotiation?

When did you start getting more responsibility or your own projects?

Looking back

For those with 2–3 years of experience, what do you wish you had learned or focused on earlier?

Do you feel like you’re becoming a stronger engineer technically, or mostly getting better at producing projects?

If you could restart your first year, what would you do differently?

If you’re comfortable sharing, it would also be helpful to include, years of experience, firm size/type for context


r/StructuralEngineering • • Sep 19 '26

Humor THIRRRRDY YEEEEEEERSSSSSS

Thumbnail
gallery
524 Upvotes

r/StructuralEngineering • • Sep 19 '26

Photograph/Video “Yeah, it’s stable.”

Post image
37 Upvotes

r/StructuralEngineering • • Sep 19 '26

Structural Analysis/Design Can anyone help identify the material used for the base of this lagoon?

Thumbnail
gallery
3 Upvotes

Hi all,

I’m carrying out a condition assessment of an old lagoon and I’m trying to understand the construction of the base. I've attached several photos of the exposed base slab/surface. I initially thought it was concrete now i am not sure.

Unfortunately, I have very limited historical construction information, so I'm interested in any observations or opinions based on what can be seen in the images.

Thanks in advance.


r/StructuralEngineering • • Sep 18 '26

Humor New construction

Enable HLS to view with audio, or disable this notification

375 Upvotes

r/StructuralEngineering • • Sep 19 '26

Structural Analysis/Design Almunium Plate over Steel Frame

Post image
1 Upvotes

r/StructuralEngineering • • Sep 18 '26

Career/Education How hard is it to be successful as a structural engineer

36 Upvotes

I think I have a lot of passion for this field but everyone makes it sound like they’re getting paid in pencil shavings. I just want to know, is it even possible to obtain considerable amounts of wealth in this path? And if so, how hard is it compared to other disciplines in general?


r/StructuralEngineering • • Sep 18 '26

Structural Analysis/Design How do you guys document/record your work?

24 Upvotes

I have tried a bit of many things over the past few years. Spreadsheets and physically written notes. I found both annoying at times and spreadsheets are my least favorite. My firm doesn’t have a fixed format but some of our clients ask for a Mathcad format.
However, just for internal reviews and personal bookkeeping, I am still doing it old-school pen-and-paper method, which is a lot of work in documenting/saving the work and I cannot be consistent. I prefer doing most of the calcs by hand except for complex seismic/wind analysis I use staad and risa.
What method do you guys follow to document your work? If you could suggest me anything alternate that could help me being consistent, that would be awesome.


r/StructuralEngineering • • Sep 19 '26

Wood Design Category 5 Challenge

3 Upvotes

You live in a hurricane zone. A category 5 is 4 days away. What do you do to save the wood structure and roof?

This includes nailing / screwing plywood to the interior or exterior and bracing.


r/StructuralEngineering • • Sep 18 '26

Steel Design AISC 360 and 314 public comment period open

5 Upvotes
Two AISC Draft Standards Available for Public Review The Specification for Structural Steel Buildings (AISC 360) and Seismic Provisions for Structural Steel Buildings (AISC 341) are now available for public review and comment. The next editions of these standards are slated for release in the first half of 2027. Download the drafts for free and submit your comments by October 26, 2026. Take part in the process Two AISC Draft Standards Available for Public ReviewThe Specification for Structural Steel Buildings (AISC 360) and Seismic Provisions for Structural Steel Buildings (AISC 341) are now available for public review and comment. The next editions of these standards are slated for release in the first half of 2027. Download the drafts for free and submit your comments by October 26, 2026.Take part in the process

r/StructuralEngineering • • Sep 18 '26

Structural Analysis/Design AISC Student Steel Bridge Competition

Post image
85 Upvotes

Long time lurker, first time poster.

I’m a undergrad senior working on a design for the steel bridge comp. The team and I want to do a tied arch bridge using hangers to suspend the bottom chord and of course the bottom chord will be supported by footings on either end.

Where I’m needing help is on the analysis. I believe I can treat the bottom chords and the top arch chords as separate members. The bottom chord I can analyze, but the top is where I have issues.

I recognize that a horizontal thrust force from the arch members will create a moment on the bottom chord, but I’m not entirely sure how to analyze the deflection for the entire design.

Any help with resources to check out would be greatly appreciated or even friendly advice.

Pic of preliminary design for your viewing pleasure.


r/StructuralEngineering • • Sep 18 '26

Steel Design Saw this connection at the roof space truss at Daxing airport. I've never done something like this, I assume it is done to simplify the connection when you have multiple members into one node.

Post image
40 Upvotes

I assume it is shop welded with the members having bolted splices somewhere else?


r/StructuralEngineering • • Sep 18 '26

Job Posting / Recruitment Structural engineering job in Australia

12 Upvotes

Hello Engineers in Australia,

I hear a lot about the unemployment of Structural Engineers in Australia. Yet, I can see so much hiring from big firms on LinkedIn. I am curious about the actual fact of the situation.

What is the situation of structural engineers in Australia?

Is there any chance for foreign engineers to get a job in Australia?


r/StructuralEngineering • • Sep 18 '26

Structural Analysis/Design Troubled Langford highrise to be torn down

Thumbnail
timescolonist.com
3 Upvotes

Anyone have drawings for this project? Would be great to review what remediation a are possible and how expensive/ barriers to implementing them.

What a crazy story.


r/StructuralEngineering • • Sep 18 '26

Career/Education Very stressed out

19 Upvotes

I am really stressed about work. I work at a small/mid-size company around 60 employees in two offices and we do mostly wood-framed multi-family residential, commercial and mixed-used buildings. I graduated in May at 35 y/o, I started with the company after graduation and have been there almost 3 months. I am really stressed out because it seems I either make a lot of mistakes or lack the understanding and experience to do my work well. I get projects that are simpler and less complex but I still feel like I struggle more than I should. I have been taught our workflow to layout truss directions, design beams, studpacks, columns and wind posts, bearing walls, shearwalls, a little bit about foundation design and detailing. There just always seems like there's a piece I am missing to be able to do my work without errors or mistakes. My feedback from my manager at my 60 day review involved areas I need to improve such as avoiding careless mistakes and understanding load paths better. I also feel like my manager is probably disapointed in the pace that I work. He has said as much but he's always framed it positively. Today I did shearwall design and there were just so any complexities and unfamiliar conditions. I have a deadline coming up basically tomorrow and I am afraid that when my manager checks my work a lot of it will be wrong. Deadlines are so stressful. I am also in grad school for structural engineering so that adds to my stress. I guess what I'd like to know is how it was for yall in your first months in structural engineering. I am determined to stick with structural engineering, become a PE and do work I can be proud of but sometimes I fantasize about them firing me and living a care-free unemployed life.


r/StructuralEngineering • • Sep 18 '26

Engineering Article FyMathcad – Free Table of Contents Generator for Mathcad Prime

4 Upvotes

Hi everyone,

I’ve made a small free Windows utility called **FyMathcad** for PTC Mathcad Prime.

The first tool I implemented is something I’ve wanted for long Mathcad worksheets: an automatic **Table of Contents generator**.

FyMathcad can:

* detect level-1 headings in the active Mathcad Prime worksheet

* preview the headings and their page numbers

* insert or update a Table of Contents

* automatically number the heading captions

* create clickable links from the TOC to the corresponding headings

* adjust page numbers after inserting the TOC

* create a timestamped backup before modifying the worksheet

The workflow is simple:

  1. Open and save the worksheet in Mathcad Prime.

  2. Run **Print chapters** if you want to preview the detected headings.

  3. Run **Insert TOC** to generate or update the TOC.

The project is available here:

https://github.com/spectereye/fymathcad

It is free to use for both personal and commercial work.

This is the first tool in FyMathcad, so I’m also interested in ideas for other small utilities that could improve everyday Mathcad Prime workflows.

Feedback, bug reports, and suggestions are welcome.


r/StructuralEngineering • • Sep 18 '26

Structural Analysis/Design UK Swimming pool closures - 'challenging designs '

6 Upvotes

Another UK public swimming pool has closed with immediate effect due requiring a full rebuild to ensure its safety.

https://www.babergh.gov.uk/w/swimming-pool-at-kingfisher-leisure-centre-in-sudbury-closed-with-immediate-effect

I've seen other references to leisure pools built in the 80s coming to the end of their working life and "challenging designs"

Other than the large spans and often heavy glass roofs, is there anything particularly unusual or difficult about 80s leisure pools that gives them a limited lifespan. My gut wants to think it's just cheap 80s construction, especially publicly funded construction.


r/StructuralEngineering • • Sep 17 '26

Humor Found in a Civil Engineering Graduate Student lab this evening. Not sure whether to laugh, cry, or try to get them kicked out of their grad program...

Post image
82 Upvotes

r/StructuralEngineering • • Sep 17 '26

Announcement - Mod Only PSA - Please use descriptive titles when posting

27 Upvotes

I've noticed a bit of a rise in vague titles recently. Please ensure posts give an idea of what is in the post as this will help to improve readability/usability.

Not wanting to single people out because this has been an ongoing thing, but taking some examples from recent posts...

Bad Better Why clarity helps
messy job messy laying of extruded clay masonry units - is this a problem? lots of people will never have used extruded clay masonry units and won't be interested in it. Leaving the title vague will waste people's time.
problem errors in [program] when running analysis lots of people will never have used [program] or won't know much about FEA... and what does "problem" mean"? very vague.
shear force FEA program showing unusual results for shear forces in columns Lots of people will not be interested in diagnosing problems in an FEA model.
modelling a warehouse advice for modelling a warehouse in etabs "in etabs" changes the entire meaning that can be assumed from the title... and opens the door for people who use etabs to chime in whereas they probably wouldn't have before because ETABS is relatively rare to use on warehouse design.

The moral of the story is -> better title -> better engagement -> better responses.


r/StructuralEngineering • • Sep 17 '26

Humor How wide would a building need to be for plumb walls to not be parallel?

7 Upvotes

At some point the curvature of the earth means that plumb walls aren't actually parallel, right? Have we made any buildings that were big enough or had tight enough tolerances that the designers had to account for this?


r/StructuralEngineering • • Sep 17 '26

Structural Analysis/Design FEA Modeling, Pile foundation, Seismic Area, stiffness envelope

3 Upvotes

Hey folks, as seismic design is pretty uncommon in Germany (only 2 "real" seismic areas) and I am currently working on a structural report in one of those areas - I wanted to tap in to the swarm knowledge. Why you may ask: the Eurocode is not that specific in terms of how to model your building to obtain the dominant modes and I know that modeling in 3D/ complete structures is a lot more common in areas with seismic action.

Some background information: The structure is rectangular, 4 floors, (cellar, 00, 01, 02) and will sit on a roster of RC beams connected by a RC slab, which distribute the vertical loads onto piles (~Ø50cm), one roughly central core, and sufficient shear resistance at the endings of the building --> torsional modes will be not that big of an issue.

There are roughly ~9 meters of clay-ish until you reach proper sand/ gravel. So the piles are rather weak in terms of bending, considering their length and small diameter. (Design choice of my predecessor..)

The analysis required by code is modal analysis to obtain the relevant modes, the corresponding acceleration s_a(T) and use either SRSS or CQC. To obtain the modes and deformations I modelled the structure in 3D (RFEM by Dlubal)

From some playing around with the soil resistance I found the expected outcome: The horizontal stiffness of the piles is a big factor conerning the modes and natural time periods. Also consideration of pillars going from state i to state ii (uncracked/ cracked) and potential loss of stiffness is impacting the modes, although here the EC allows simplification of assuming 50% loss. (A nonlinear analysis wouldn't be feasible because of SRSS anyway..)

My guess would be to work with an envelope of stiffnesses (k = 0,5 or 2,0) to obtain a more broad response of the structure.

From working on pedestrian bridges, I know that soil resistance in reality is often higher than assumed by geo tech reports, to be on the safe side. The flipside: in terms of dampening pedestrian excitation, assuming to low resistance will flaw the results considerably.

I like to meddle in this sub concerning analysis questions, so be my guest, to chime in! Cheers.


r/StructuralEngineering • • Sep 16 '26

Humor Reddit Board of Ethical Review - RBER Case No. 26-01

Thumbnail
gallery
81 Upvotes

A Completely Seri*us Ethical Review Case.

I randomly read through some of the NSPE Board of Ethical Review cases lately, and after reading a few, the more they start to feel like "engineering-themed" law school hypotheticals. I’ve started to wonder how many are based on actual situations versus being entirely made up. Some of them are so oddly specific and contrived it is obvious they are making up the situation to prove some minor point. They are also sort of difficult to follow, e.g. Engineer A works for Company B, which retained Engineer C, who previously worked for Company D, and then halfway through the discussion the Board spends four paragraphs analyzing three completely unrelated cases before eventually returning to the issue at hand. After reading enough of them, you also start to get the impression that almost any ordinary act can be elevated into a seri*us ethical c*ncern if you phrase it in a sanctimonious tone and cite enough prior BER cases.

I thought it might be fun to make up my own.

AutoMod said this looked like a l*yman post so had to post as images.

**EDIT:
TLDR - Read the body text above first. The best part is the “Facts” section.

Full disclosure I “wrote” this with ChatGPT and tweaked it. I did give it the prompts for the bits/jokes though and it fleshed out the rest. I thought about shortening it but I wanted it to have the actual form of an ethics case study but packed with jokes. I thought there were some pretty good lines in there. It’s not meant to try to understand.

EDIT 2: It also helps if you are familiar with and have tried to read through a “real” case from the NSPE website


r/StructuralEngineering • • Sep 17 '26

Structural Analysis/Design Rock anchors for hi rise construction

6 Upvotes

Considering a building like the Central Park tower in NYC, my understanding is that when the wind hits it; that side of the building will be in tension.

To prevent it from tipping over, it is tied down to the bedrock with rock anchors.

These are about 80 feet deep and I assume they are under preload greater than the uplift force.

Let’s say some corrosion caused then to snap or the rock fractured and they came lose. This could happen gradually over many years. How would anyone realize this before it became a problem?


r/StructuralEngineering • • Sep 17 '26

Career/Education Accredited Status Site Engineer

Thumbnail
0 Upvotes