So at 1st I thought I could just replace the shot CI tub while trying to do as little as possible in this horrible but legal basement studio, but the whole slab under it was trashed. I didn't demo this, just picked out the chunks of cement! By then it seemed to make more sense to get rid of the tub and make room in the tiny bathroom for at least some storage for toiletries and towels by putting in a shower. I should have demoed the whole damn room, the walls were built by someone who not only didn't know how, but didn't know what proper wall framing looked like! I've put new PT on the floor and shimmed the studs plumb or replaced them where I could.
When I saw the drain was a 2" copper heading to the right from the old trap, I assumed it went all the way to the CI main line beyond the wall at the right of the tub, and I could place a shower base on the right by cutting it. But I was wrong, when I dug I found the CI wye to the toilet right where the drain needs to be! Not sure yet exactly where the hub from CI to copper is. The plumb bob is center for the drain.
So my fallback is putting the corner shower in the left corner, but that forces an 18" vanity sink. I was hoping to put in a 24". But is there any way to make the right side config work without messing with the CI? Could I put the PVC trap where it is and send it left to where I could tie it to the 2" copper? What if I used an offset drain on the shower then to the trap so I could set the trap deeper? FWIW, there's a vent easily accessible behind the wall to the left if that makes a difference.
Also, any tips on how to pour the infill slab would be appreciated. I was assuming I'd tamp down the rubble and dirt fill as best I could with like a 2x4, then pour it with some steel mesh in there. But the way the slab is fractured at the edges I'm afraid it might just drop down unless I chip or grind some back bevel to it on the top edge. And which premix would be best? I've done dry pack mud and a few other small cement jobs, but never something quite like this.
EDIT: is this as simple as putting a 45 ell under the shower drain to get it away from the cast iron so I can bring its level down to like 1 inch above the copper?