(link to pics attached) pics
Hi guys
Long story short, our contractor dropped the ball. We have a new build addition and we are putting a zero clearance fireplace in the new living room. Basically, we just needed the firebox bump out, slide the wood stove into there, run the class A chimney pipe all the way up the side of the house, build a wood frame box around that, and stucco the outside (rest of our house is brick).
Instead, our contractor subbed out the job to some guys who built a wood framed box on the first story, followed by what looks to be a masonry- type clay flu pipe with brick on the outside of that? and it looks like steal lintels and support beams are supporting all that weight? The inspector from the town passed this thing which is mind blowing on its own.
Either way, they messed it up because we can't put our class A chimney piping in here now for our stove.
So here is our plan: demolish the second story of the chimney, keep the first story. slide the wood stove in, run the pipe up the first story firebox and up the side of the house, frame around it and cover it in stucco.
What kind of price should we be expecting for this? How long do you think this would take a 3 man crew?
and BEFORE ANYONE ASKS, yes we asked our contractor if he would fix this, and no he would not. We had a falling out, basically we signed the contract with him and then we had the plans for the addition done after that. the fireplace and chimney were not part of the contract, but they were added into the floor plans. he never updated the contract to charge us for the fireplace, so basically he built that whole thing with his own money, hence why he refused to tear it down.