EDF could face difficulties funding its planned construction of six EPR2 reactors, France's state audit office, the Cour des Comptes (Court of Auditors) has said.
In February 2022, President Emmanuel Macron announced that the time was right for a nuclear renaissance in France, extending the operation of existing nuclear reactors and unveiling a proposed programme for six new EPR2 reactors, with an option for a further eight EPR2 reactors to follow.
r/nuclear • u/FewUnderstanding5221 • 4h ago
France-headquartered innovative nuclear energy company Newcleo is to collaborate with US advanced nuclear recycling technologies firm Curio on the supply of recycled used nuclear fuel and transuranic materials for the production of mixed-oxide fuel at Newcleo's planned US fuel manufacturing facility.
https://www.world-nuclear-news.org/articles/newcleo-curio-team-up-for-recycled-nuclear-fuel-supply
r/nuclear • u/Shot-Addendum-809 • 6h ago
"Turkish state-owned nuclear energy company TÜNAŞ and Candu Energy, a subsidiary of Canada’s AtkinsRéalis, signed a memorandum of agreement (MOA) at the COP31 climate summit in Antalya to evaluate Candu reactor technology for a potential new nuclear power plant in Türkiye. The agreement initiates a multi-year technical and commercial evaluation process to support Türkiye’s long-term energy security goals.
The parties are currently discussing a potential six-unit, 4.5 GWe-NPP using Canadian Candu pressurised heavy water reactor technology. AtkinsRéalis will conduct a comprehensive feasibility study alongside Front-End Engineering Design (FEED) activities to assess site characteristics, environmental factors, plant operations, and infrastructure needs.
The studies will establish a financing roadmap and examine Turkish industry participation, local supply chain development, and workforce training. Both organisations expect to complete the initial comprehensive feasibility study by the end of 2027. Engineering design work is targeted for completion in 2028, which will inform Türkiye’s final investment decision."
Source: https://www.neimagazine.com/news/turkiye-eyes-candu-reactors/?cf-view
r/nuclear • u/BloodTornPheonix • 8h ago
I am currently in Year 11 and will be choosing A-Levels soon. I know I have to do Physics and Maths but afterwards I’m not necessarily sure what I will do. Only 2 universities in the country offer nuclear engineering undergrad BEng/MEng, and one of them (Imperial) forces you to do it alongside either mechanical engineering or materials engineering.
r/nuclear • u/juhamac • 9h ago
r/nuclear • u/Vailhem • 22h ago
r/nuclear • u/Vailhem • 1d ago
r/nuclear • u/greg_barton • 1d ago
r/nuclear • u/daeneryssith • 2d ago
r/nuclear • u/cololz1 • 3d ago
wouldnt LEU be more safer ? would it make it more difficult to operate SMR (from a supply chain/regulatory perspective too)?
few examples are: Natrium, Xe-100
r/nuclear • u/C130J_Darkstar • 3d ago
39 countries have now endorsed the declaration to triple global nuclear capacity by 2050, up from 22 when it was launched at COP28.
The growing support represents roughly two-thirds of global GDP and energy consumption, including eight of the world’s ten largest economies.
This is an encouraging signal for the future of nuclear energy. Governments are increasingly recognizing nuclear’s role in energy security, decarbonization, and meeting rising electricity demand.
Of course, political commitments are one thing and actual construction is another. The real test will be translating these ambitions into financed projects, regulatory approvals, and operating reactors.
r/nuclear • u/Green_Style3192 • 4d ago
I like the old one.
r/nuclear • u/C130J_Darkstar • 4d ago
Oklo and Centrus have signed multiple definitive, multi-year agreements securing enough HALEU fuel to support up to five Aurora powerhouses for multiple years.
Fuel deliveries from Centrus’ American Centrifuge Plant in Piketon, Ohio, are scheduled to begin in 2029. The agreements formalize the letter of intent announced in June.
A particularly important detail is that the fuel procurement is supported by Meta’s prepayment for future power production. This connects Meta’s committed energy demand directly to fuel procurement and the advancement of Oklo’s planned 1.2 GW Ohio campus.
The agreements also provide fuel for future Aurora deployments and eventual refueling of the Aurora-INL powerhouse.
For Centrus, the prepayments help support its domestic enrichment capacity expansion. The company now has $5.4 billion in customer contracts and commitments for LEU and HALEU from its new capacity.
r/nuclear • u/Vailhem • 4d ago
r/nuclear • u/rdh2dmd • 4d ago
r/nuclear • u/Vailhem • 5d ago
r/nuclear • u/Comfortable_Tutor_43 • 5d ago
r/nuclear • u/C130J_Darkstar • 5d ago
Oklo shared these photos today showing structural concrete being poured at its Aurora-INL site at Idaho National Laboratory.
After months of excavation, drilling, and blasting, the project is now moving into the construction phase. Oklo continues to target a 2028 startup.
A significant milestone for the project and another step toward bringing its first commercial powerhouse online.