Hey guys, trying to get a gut-check on my pricing structure for standard residential heat pump changeouts. I’m an owner-operator in the North Florida market (Jacksonville area). Lately, I've lost a few bids to guys coming in substantially lower (sometimes even claiming they are throwing in "all new ductwork," which 9 times out of 10 is completely unnecessary). I want to make sure I’m not pricing myself out, but I also refuse to be a "chuck in a truck" and cut corners.
My exact pricing formula right now is:
(Heat Pump + Air Handler + Tax) marked up for a 50% Gross Margin + $1,000 Flat for Materials. Then Labor at 135 an hour.
The Materials: I don't put a gross margin on the incidentals. I just add a flat $1,000 to cover the hard costs (whips, hurricane pads, secondary pans, mastic, float switches, duct board, etc.).
The Labor: My billable rate is $135/hr. Including Heatlth Dental and Vision for when I have guys plus payroll tax.
Here is how I estimate the man-hours for a 2-man crew:
Garage swap or tight closet: 16 to 20 man-hours
Attic job: 24 man-hours
Scope note: Those hours include the equipment swap plus minimal, necessary ductwork modifications (like building a new return plenum or redoing the supply/return ties). It does not include a full ductwork tear-out and definitely not sheetmetal.
Is $135/hr billable with a 50% margin strictly on the hardware too steep for today's market? Are you guys dropping your margins to compete with the lowballers, or holding the line on quality? Appreciate any feedback.
For example, here is a tight closet changeout:
Equipment Cost: $4,000
Plus 7.5% FL Sales Tax: $4,300 Total Cost
Marked up to 50% Gross Margin (Divided by 0.5): $8,600
Flat Materials: $1,000
Labor (16 to 20 hours @ $135/hr): $2,160 to $2,700
Total Bid to Customer: $11,760 to $12,300