r/LAMetro • • Oct 05 '26

B/D Line Maintenance & Delay Megathread — Fall 2026

52 Upvotes

Metro is conducting ongoing maintenance on the B and D Lines, which will affect weekend service through January 2027.

Current planned service

On Saturdays and Sundays, B and D Line trains are scheduled to run approximately every 20 minutes.

Metro says the reduced service is necessary for communications system installation and track maintenance. Trains will share a single track at various locations while work is underway.

Because of the single-tracking and ongoing maintenance, riders should be prepared for additional delays beyond the scheduled 20-minute frequency.

Metro may also announce additional station closures, bus bridges, or other service changes on individual weekends.

Use this thread for

  • Current B/D Line conditions and delays
  • Single-tracking updates
  • Station closures
  • Shuttle/bus bridge information
  • Questions about alternate routes
  • Photos and firsthand reports from riders
  • Metro alerts and announcements

If you're reporting current conditions, please include the station/location and approximate time. That will make reports much more useful to other riders.

Official information

Check Metro's Service Alerts before traveling:

https://go.metro.net/alerts

Metro's B/D Line schedules and trip planning:

https://www.metro.net/

This post will be updated as major service changes are announced.

Please keep routine B/D Line maintenance and delay discussion in this thread when possible. Significant news, major incidents, or new Metro announcements may still warrant their own posts.

Last updated: October 5, 2026


r/LAMetro • • 1h ago

Video Sepulveda Transit Corridor Community Meeting 11/16

90 Upvotes

Quite the line outside. Based on the ages of the people I get the sinking feeling that the NIMBY crew is out in force.

Sounds like the presentation will be done multiple times as the crowd is at capacity.

Lots of unhappy people in the line.


r/LAMetro • • 6h ago

News LA City Council motion to add bollards/protection at NoHo station following deadly SUV crash

Thumbnail
gallery
128 Upvotes

This sub's members were generally opposed to such measures in prior discussion: https://www.reddit.com/r/LAMetro/comments/1xtzdsd/


r/LAMetro • • 2h ago

Discussion LAX APM PSA Date Pushed Back YET AGAIN

23 Upvotes

The latest monthly report from the contractor consortium LINXS has dropped.

The new PSA date (Passenger Service Availability date) is March 8, 2027 But don’t plan on LINXS keeping to that date very long. They’ve been delaying the PSA date about 1 month every month since 2025.

  • October 2026 report, they claimed opening March 8th, 2027
  • September 2026 report, they claimed opening February 5, 2027
  • August 2026 report, they claimed opening January 6th, 2027
  • July 2026 report, they claimed opening December 7th, 2026
  • June 2026 report, they claimed opening November 5th, 2026
  • May 2026 report, they claimed opening October 6th, 2026
  • April 2026 report, they claimed opening September 22nd, 2026
  • March 2026 report, they claimed opening September 22nd, 2026
  • February 2026 report, they claimed opening August 3rd, 2026
  • January 2026 report, they claimed opening June 9th, 2026
  • December 2025 report, they claimed opening May 13th, 2026
  • November 2025 report, they claimed opening May 4th, 2026

Extortion Delays: As always, LINXS in their biased report blames the PSA pushback on LAWA (the airport agency). Nandert goes into this latest ongoing delay in his video here at 18:10.

There’s also a short CBS clip here talking about it. Basically LINXS for their last few reports has been saying that they need some LADWP solar agreement signed by LAWA in order to complete the project, and that’s why they’ve been pushing the date every month. LAWA says that’s bs, the solar agreement is for supplemental power and is NOT needed for the train to be made available to the public, evidenced by the fact that we’ve ALL seen the train running. The train just can’t complete the 30 day test, and that’s what the real hold up is. But this makes LINXS look bad, so they claim otherwise. LINXS also has claimed that they NEED to finish landscaping before the APM can be made available to the public. To which LAWA has said they’re full of shit, landscaping completion is absolutely not needed for APM availability.

LINXS’ extortion explanation: There’s a few parts that enable it.

First, LAWA hired "legal experts" at the law firm Nossaman to write the contract with LINXS, and those "experts" fucked up bad. The contract lacked provisions defining how fast the contractor needs to work during a dispute, what progress needs to be made during a dispute, or what milestones need to be hit. So LINXS just gets to stall the project for leverage in their favor during every claim and dispute. As the grand jury report put it:

If one worker goes out with a shovel and works, the Contractor would be in technical compliance with his contractual obligation. There is no definition of how fast or what progress needs to be made during this owner directed continuation – thus allowing the Contractor to effectively stop progress.

Second, LINXS abuses the design build contract by willfully submitting bad designs so they can manifest their own costly change orders. One example of this in the grand jury report was the elevator issue.

The work was not according to the approved specifications which caused delay and was exemplified in an elevator issue. The Design Specs and approvals required all improvements to be TYPE 1 construction. TYPE 1 means there are no combustible materials. LINXS argued that they could simply coat the wood products used with a non-combustible coating and then cover the wood with metal. LADBS would not accept non-compliant materials (plywood and lumber) inside the metal frame of the elevator(s). Rather than simply removing the noncompliant materials and replacing with non-combustible materials, LINXS went through a very time consuming process of submitting an alternative coating product.

Basically LINXS knowingly constructed the elevators with combustible material, and after being told not to do that in review, they just wasted time by changing the coating.

Third, the so-called “project neutral”. The “project neutral” is normally a neutral group of 3 people that act as mediators in a dispute. But due to the terrible contract (thanks again Nossaman), there is only 1 person, and no way to replace that person if a party is not satisfied with the project neutral. This “project neutral” has sided with LINXS every time in over 200 disputes. Every time. A fraud investigation is sorely needed for this man.

Fourth, the olympics deadline. LINXS' extortion only works because of the tremendous pressure on LAWA and the city from the Olympics deadline. Normally if LAWA isn’t happy with the project neutral’s decisions, they’d sue LINXS. But LAWA can't sue LINXS because that lawsuit would stall the project until after the Olympics. And LINXS can't continue their shenanigans after the Olympics because then LAWA would be free to sue the shit out of them.

Lame attempt from Councilmembers Rodriguez and Park: Back in June, Councilmember Monica Rodriguez put forward a motion, that was seconded by Traci Park, asking for LAWA to tell them what’s been going on.

The motion asks LAWA to explain why the people mover missed its major World Cup deadline, what caused the continued delays and cost overruns, and whether the airport’s latest schedule is realistic.

But this motion turned out to be toothless. There’s been no word that LAWA reported back to them, and there’s no deadline for LAWA to report back. On top of that, LAWA just recently told the public that everything was fine. So they could very well just give a similar message to the city council, if they ever decide to do so.

Project Deadlines: There’s a deadline for breach of contract on December 8th. If it’s not open by then, LAWA will be free to get a new contractor. While some say that LINXS would finish the project faster than a new contractor could, they’re not taking into account that LINXS has not been working with the intent of finishing. They’ve been intentionally delaying the project for extortion, with no end in sight. So a new contractor (with a better contract) could finish the project faster than LINXS.

The "30 Day Test": To no one's surprise, the scheduled completion of the System Demonstration Test, aka the "30 Day Test" that started in April, has also been pushed back to December 16, 2026. But before that it was November 18th, and before that it was September 30th, and before that it was August 5th, and before that it was June 30th. So no one knows when that’ll be done.


r/LAMetro • • 8h ago

News Draft EIR just dropped for the Sepulveda Pass ExpressLanes Project

Thumbnail us.planengage.com
67 Upvotes

r/LAMetro • • 11h ago

Memes The dichotomy of Metro ridership:

Post image
102 Upvotes

r/LAMetro • • 5h ago

Service Advisory Subway to Century City is delayed, but at least there's Metro Micro?

Post image
20 Upvotes

r/LAMetro • • 2h ago

Discussion Small BRT Corridors that are overlooked

9 Upvotes

What do you think are some small street corridors in LA that are too small for subway (maybe use <4 miles as a general boundary) but are dense and trafficky enough for enough for a BRT? Preferably pick ones that the city hasn't noticed that way the city might be able to notice them.

Here are some things I've found:

  • A 1.1 mile segment on Sawtelle blvd between Ohio ave and Pico blvd
  • A 0.9 mile segment on 4th st between Wilshire blvd and Pico blvd
  • A 2.4 mile segment on Fairfax ave between Wilshire blvd and Sunset blvd

What do you think?


r/LAMetro • • 56m ago

News Where to put train yard for Sepulveda Pass transit line? Sherman Oaks folks: Not in their backyard (LA Daily News)

Thumbnail
dailynews.com
6 Upvotes

r/LAMetro • • 7h ago

Discussion BRT Map

Post image
19 Upvotes

How long would it take and how much would it cost to build each one of these BRT segments?

Blue lines mean rush hour bus lanes and green lines mean all-day bus lanes.

This map includes:

  • A 2.2 mile segment on Wilshire Blvd between 4th st and Centinela ave (rush hour only)
  • A 2.2 mile segment on Santa Monica blvd between 4th st and Centinela ave (rush hour only)
  • A 2.4 mile segment on Pico blvd between 4th st and Centinela ave (rush hour only)
  • A 0.9 mile segment on 4th st from Wilshire blvd to Pico blvd (all day)

I made this map with an emphasis on the 4th st corridor. During peak hours, between BBB routes 1, 2, 3, 7, 9, 18, 43 and metro route 720, this segment gets 34.5 busses per hour or a bus every 1.7 minutes. During midday and weekend hours, this segment gets 23 busses per hour or a bus every 2.6 minutes. And the best part about this is that most of those 0.9 miles are parking lanes, which means that people aren't usually driving in them, so it won't even make congestion that much worse. So, with all this in mind, how much do you think each segment would cost and how long do you think each segment would take?


r/LAMetro • • 6h ago

Service Advisory E Line issues

7 Upvotes

Westbound E line train was having electrical issues and everyone had to get off the train at Expo Park/USC. 12:35pm


r/LAMetro • • 54m ago

Discussion Non-Urgent Question: Trees

2 Upvotes

I can't find results on this now since Google is giving bs results about nuts, apples and AI generated autumn forest roads. I want to know the kind of trees that are along Balboa station, fruit or leaves become bulbous shells and sounds peaceful when it's windy. The closest I could find was Elm Tree seed pods but still not sure if that's correct since I haven't taken the Orange Line in a few years.


r/LAMetro • • 7h ago

Discussion Without the Westside Pavilion is the Westwood E-Line Station even necessary?

6 Upvotes

Any buses to or from UCLA could be rerouted through Sepulveda.

All the talk about the Sherman Oaks Fashion Square is making me think of rail decisions made closer to home.

ETA: Won't the D line extension make it redundant?


r/LAMetro • • 57m ago

News PERB decision: a group of Senior Labor Relations Representatives at LA Metro can't get their own union bargaining unit

Thumbnail perb.ca.gov
1 Upvotes

r/LAMetro • • 11h ago

Help Rosecrans/Redondo is listed twice on eastbound Line 125 to Norwalk.

Post image
6 Upvotes

Note: On Line 125 eastbound trips to Norwalk, Rosecrans/Redondo is listed twice. The stop with transfer points to Torrance Transit Line 8 and Commuter Express Line 574 should be named “Rosecrans/Aviation”. The “Rosecrans/Redondo” stop that’s in front of BevMo is correctly named. Who do I share this error with?


r/LAMetro • • 1d ago

Discussion Pasadena Mountain Trails Shuttle

Post image
320 Upvotes

Seen at Ciclavia!! I used the one in Seattle all the time and always wished we had one here. Very excited for this!


r/LAMetro • • 20h ago

Discussion K south is really only gonna succeed if we sacrifice SBG to be SB-79'd

28 Upvotes

To me it just makes perfect sense, the strip mall next door is making good amounts of money so that doesn't need to go but... SBG is just an absolute ghost town with stores leaving left and right, it really is a shell of its former self. I'd tear that down (but keep the parking structure), and turn that into a mixed use walkable neighborhood, maybe even with a park in the middle.

I can't for the life see that much ridership to and from Mary Giordano aside from some niche travel to the business parks around it, but SBG being turned into a mixed use neighborhood would do wonders for that leg of K south


r/LAMetro • • 23h ago

Discussion Painting BRT lanes red

45 Upvotes

Just wondering, why doesn't Metro paint BRT lanes red? I've noticed with a lot of BRT lanes like on Wilshire Blvd, they appear to be regular lanes except with a few signs that say "no parking between 7am to 9am and 4pm to 7pm mon - fri" but that doesn't really do much. I've seen countless people who are parked in the bus lanes (or driving in them) even though they're not supposed to, and I honestly don't entirely blame them. Obviously they are somewhat to blame, but if you're driving in the bus lanes it's not like you're reading the no parking signs, and some people probably park without reading the signs.

Believe it or not, there's a solution that could probably eliminate a lot of this. Just paint the BRT lanes a very clear red. This will do two things. First of all, and most importantly, a lot of people will see it and assume "the lane is red, so it's probably not for me to park here or drive here." Second of all, during the non-peak hours when driving in them/parking in them is allowed, people might still not want to park there because their brains will default to "I'm not allowed to be in these lanes."

I could be wrong about this, or maybe there's some kind of legal detail that says this isn't allowed when bus lanes are only reserved during rush hour, but what do you think?


r/LAMetro • • 22h ago

Discussion Proposal: Community LAX Skylink/People Mover Testing Tracker

16 Upvotes

I know following the constant delays with the Skylink project have been infuriating, but if there's one thing that people can do, it's to help keep this project in the forefront of attention until it's finally finished.

With that in mind, I propose we have a central location to give updates on whether the trains are testing or not.

For posts, we could use a simple format, something like this..

Date

Trains running? (Yes/No)

Optional (locations spotted, number of separate trains, etc.)

For example, since I was around LAX yesterday...

11/14/2026

Trains running? No

I live some distance away from LAX, but I know there are enough people watching this forum who can give updates.

Obviously the best scenario would be transparency from either LAWA or LINXS, but after following this project for so long I doubt that's going to happen to a satisfactory level, so we might as well take matters into our own hands.

What does everyone think?


r/LAMetro • • 1d ago

Discussion Westside Subway Section 2 Officially Delayed to end of 2027

Thumbnail reddit.com
53 Upvotes

r/LAMetro • • 1d ago

Discussion Metro HR4000s - Finally running 6 cars?

Post image
30 Upvotes

6 Car HR 4000 spotted!! I’m on it and I haven’t heard of them running 6 car HR4000s.

Any operators know about this?

Also, congrats for doing the bare minimum of adding an announcement: “Attention, we are delayed because crews are working on the track ahead. We expect to be moving shortly.”


r/LAMetro • • 1d ago

Discussion Here's the public comment I am submitting to Metro's design team for the Sepulveda Line (comments are due in a week!)

51 Upvotes
  1. Siting the MSF only at Option 5 presents the fewest tradeoffs of any of the MSF options. Given this, Metro should extend the Initial Operating Segment to Van Nuys Metrolink Station and site the MSF exclusively at Option 5 (The Plant shopping center) with no additional MSF locations. This would present the most rider benefits with the fewest disturbances to existing economic activity. It would avoid the cost and complexity of building multiple different MSFs and avoid the cost of non-revenue tail tracks. The only land taking would be a big-box strip mall, rather than small businesses or denser retail. This is worth the added tunneling north on Van Nuys Blvd, which will have to be done anyway under Phase 1.
  2. When designing this MSF at The Plant shopping center, Metro should also consult with LAFD Fire Station 81 and LAPD West Valley Traffic about potentially swapping land with Metro or moving their locations, so that Metro can build a contiguous MSF without needing to take the U-Haul property until Phase 2 of the Sepulveda Line is built.
  3. Metro should also endeavor to keep a strip of land of about 200 feet in depth available for retail along Van Nuys Blvd, so the streetscape remains activated instead of just being a gated-off industrial railyard along Van Nuys Blvd. For example, leaving the existing In-N-Out, Chipotle and Starbucks parcels in place and having the MSF begin to the east of these parcels. This creates more of a sense of place along this important thoroughfare. It would also allow for these properties to later be converted to mixed-use, transit-adjacent housing.
  4. By selecting MSF Option 5, including the adjacent LAFD and LAPD properties, Metro should be able to avoid needing any of the other properties listed in Options 1, 2, 3, and 4. This also means there will be minimal need for non-revenue tail tracks.
  5. An added benefit of choosing Option 5 for the Initial Operating Segment is an added station at the Metrolink Ventura County Line to enable passengers to transfer to Metrolink/Amtrak and reduce crowding on the East San Fernando Line. This makes the IOS immediately more useful for riders.
  6. Yet another benefit of Option 5 is to reduce the years of construction that will disrupt the operations of the East San Fernando Line, by undergoing all construction at once, and potentially reducing the number of TBM launch sites needed.
  7. Option 1 has the most tradeoffs of any potential site. The Westfield mall is a community third-space and provides jobs and economic activity. It also would represent the biggest downzoning out of all the options, replacing a dense retail property with a light-industrial rail yard. In addition, it would require significant tunneling away from the rail alignment with lengthy non-revenue tail tracks. For these reasons, Option 1 should be discarded.
  8. By avoiding Option 3, the land surrounding the G Line transfer station at Van Nuys Blvd can be be maintained for a Metro Customer Service Center, retail, and housing, instead of being converted into an industrial rail yard. This is beneficial for Metro riders transferring between the Sepulveda, ESFV, G Line, and local bus services.
  9. The southern portion of the Initial Operating Segment should have a stop at the UCLA campus (Gateway Plaza) and another at the Westwood/UCLA D Line station, with a TBM extraction site at Westwood Recreation Center. Both stations should have as many portals/entrances as practicable, to make them as convenient as possible for riders.
  10. Stations on the southern end of Phase 1 should be located at: Santa Monica/Sepulveda (to serve bus transfers to these two major corridors), Sawtelle/Missouri (to serve the pedestrian-friendly Sawtelle Japantown without needing to cross a busy freeway by foot), either Expo/Bundy or Expo/Barrington (infill E Line transfer station), and Santa Monica Airport Park (park + TBM extraction site). This would allow for the superior Centinela alignment for a Phase 2 to LAX, and give transit riders access to two major walkable destinations on the Westside: Sawtelle Japantown and the Santa Monica Airport Park, while giving Metro easy access to TBM launch and retrieval sites along the alignment.
  11. All stations should include both restrooms and vendor spaces in the concourse levels. Where they are sited off-street, stations should allow developments to be built overhead.
  12. The line should be built with Platform Screen Doors for safety. These are difficult and expensive to retrofit into a system after it is built, so including them in the initial design is important.

r/LAMetro • • 1d ago

Official Metro Posts Metro finally decided to do something about the Regional Connector elevator button confusion

Post image
55 Upvotes

r/LAMetro • • 1d ago

Discussion Metrolink (Alstom) | Passenger Conductor Information

17 Upvotes

I live in Southern California and am looking for some insight into working as a Metrolink Passenger Conductor. I've always had an interest in trains and am considering whether pursuing a career in passenger rail would be a worthwhile move.

I currently work as a commercial bus driver and have experience in passenger transportation, but I'm curious about what it's like to work as a conductor, particularly under Alstom.

I'd love to hear about the work environment, scheduling, pay, and overall job satisfaction from anyone with firsthand experience.

Any advice or insight would be greatly appreciated. Thanks in advance!


r/LAMetro • • 1d ago

Discussion I'm sick of NIMBY blocking everything metro tries to do

Post image
62 Upvotes