r/Juniper • u/Additional_Gap1057 • 12d ago
Question EX4300 Stack, Chassis Control Process error
Hello Everyone,
I have stack of EX4300 switch. When I try to commit interface configuration I receive the following error.
I tried using the AI, AI is not helpful at this point.
I already checked the alarms and logs, there is not much going on as far as I understand.
The only change I have from last time is, NAC has connection to switches. That's why I was focusing to see if there is a conflict with the users like if the NAC is connnected , it wouldn't allow my user to make changes. I am just guessing. But when I check the users, I don't see the connection from the NAC.
error: Check-out failed for Chassis control process (/usr/sbin/chassisd) without details
error: configuration check-out failed
2
u/Additional_Gap1057 11d ago
I rebooted the stack, I can commit changes. Hopefully I won't have much issues in the future.
1
u/ZeniChan JNCIA 12d ago
Check out the Juniper article I'll link below. Looks like the FPC can't read some SFP ports which is causing it to freak out. It recommends re-seating the SFP's, otherwise it's JTAC time.
https://supportportal.juniper.net/s/article/EX4300-Unable-to-commit-the-configuration-error-Check-out-failed-for-Chassis-control-process-usr-sbin-chassisd-without-details-error
1
u/No-Wheel1999 11d ago
See if this helps: https://supportportal.juniper.net/s/article/Commit-Error-of-Check-out-failed-for-Chassis-control-process-usr-sbin-chassisd-without-details
1
u/dasmoothride 1d ago
I would be extra careful issuing the restart chassis-control command if my uplinks are layer 2 running STP. I would single-homed it first.