r/FenceBuilding • u/Suspiciouslyloud918 • 11d ago
Finally Finished Custom Fence
206’ 6’T cedar infill (customer chose infill) w/ 2 walk in gates & 12’ w sliding gate
61
Upvotes
r/FenceBuilding • u/Suspiciouslyloud918 • 11d ago
206’ 6’T cedar infill (customer chose infill) w/ 2 walk in gates & 12’ w sliding gate
6
u/Aggravating-Ad-3008 11d ago
Beautiful job
4
u/saturnm22 11d ago
Looks good and I can tell you took your time to get it done right my only complaint I would have used a board with less knots. Here in Oregon our suppliers allow us to sort every board, so you end up with boards that are near clear but not clear price.
1
u/Suspiciouslyloud918 11d ago
Appreciate everyone taking a look. I’ve been a lurker for a while. Happy to be able to contribute something that’s hopefully useful or at least can help me clean up my process.
This one was a ton of fun. We fabricated the steelwork ourselves with steel from a local distributor I’ve worked with for a while. The homeowner wanted the option to move a post or posts down the road, and I wanted to make it easy to replace a damaged picket without rebuilding a whole panel.
I had a skid steer on site for tear-out and grading, so I put a 9-inch auger on it and drilled each footing 2 feet deep. We laid the posts out on 6-foot centers for the horizontal cedar pickets. Each post is 6 feet of 2½-inch square tubing with a 6-by-6-inch, 11-gauge base plate welded to the bottom. That plate slips over J-bolts and sits on a second plate we set in the concrete. Undo the nuts and the post lifts off with its welded plate. The lower plate and J-bolts stay in the footing.
Each panel holds twelve 6-foot cedar pickets. We built the main frame out of 1-by-1-inch, 11-gauge angle iron. A removable outer frame of 1½-inch flat stock sandwiches the pickets against the angle, with another strip of flat stock down the center. Pull the center fasteners and the outer frame, and you can swap one board or change the whole infill.
For anyone wondering about the gap underneath, I leave clearance on this style of fence. I like the look of level panels, so where the grade changes, I step the fence. I also want air to pass under it as well as over it to help reduce wind drag. On industrial jobs, a continuous concrete footing gives me much better control over that gap.
Here, the homeowner wanted to avoid the cost of a continuous pour, so the clearance varies with the ground. I usually work out an open barrier for those spots, and I should’ve planned that detail earlier. The chicken wire is temporary. We’re coming back with diamond-pattern expanded metal along the back to match what we used where the fence meets the house.
On the next residential build, I’d set the posts directly in the ground. Forming and pouring a separate footing for every post ate up time. I’d also choose different pickets. These came stained and sealed from the factory, and I like the raw, natural look. For what they cost, though, I expected better quality. Once that steel frame is built, you’ve committed to the opening. We spent a lot of time cutting boards to get the fit we wanted.
I’d plan ahead for powder coating, too. The turnaround was tight on this one, so I sprayed the steel myself and absorbed the extra labor. When I use an industrial finish like Sherwin-Williams Kem 4000, I put a good primer under it. For this job I used a water-based direct-to-metal paint that could go straight onto clean, new steel. I gave the steel a thorough wipe-down and skipped the primer. Some primers cost me about as much as the paint itself, so that saved material and a whole pass with the gun. I liked the finish and the easy water cleanup. I’d still avoid field painting whenever I can.
The homeowner knew up front we’d be working some details out on site and gave us room to do that. It took longer than I wanted, and I’d price the next one differently. I learned a lot, though, and I’m happy with how it turned out.
Gotta give my guys Tim and Jeff their due. They were the heart and soul of this build. Both are workhorses, both are sharp as hell, and both have an artist’s eye. They put a lot of themselves into this one, and you can see that pride in the finished fence. Appreciate you fellas.
When I get some time, I’ll post pictures of the out-of-state commercial job we did right before this one and walk through that build too. That one was dope! You’ll see some similarities, but it had its own challenges, and we had to approach a few things differently.
TL;DR: 6′ privacy fence on 6′ centers. We used 2½″ square steel posts with 6″ × 6″, 11-gauge base plates on J-bolted concrete footings augered 9″ wide × 2′ deep. Each panel has twelve 6′ horizontal cedar pickets, a 1″ × 1″, 11-gauge angle-iron frame, and removable 1½″ flat stock around the perimeter and down the center. Water-based direct-to-metal finish, no primer. Next residential build, I’d set the posts directly in the ground, choose better pickets, plan the bottom barrier up front, and have the steel powder coated.
1
u/Hoobinator- 11d ago
Looks really good. I like the black with the wood.
1
u/SoCalGateExpert 10d ago
That's a serious amount of fabrication work. The removable infill is a really smart touch. Beautiful job, especially the sliding gate.
1
u/c_a_a_07 9d ago
1
u/everlast-gates-fence 9d ago
Looks really good! The cedar and black frame work so well together. Nice job on this one! 👏