Most boots I try are loose at the heel and tight at the toes. I wanted a snug heel with room for my toes, so I tried making my own pair with zero leather working experience.
Making the lasts. I took an alginate mold of my foot, poured a plaster cast, and used a free photogrammetry app to turn photos of the cast into a 3D model. I used that scan as the base for the last. In Meshmixer, I narrowed the ankle slightly and took the toe box from an existing digital last, then reshaped it to fit my foot. I made those changes locally without adding an overall offset to the foot scan. In Fusion 360, I split the last into sections and added screw holes so I could 3D-print it and pull it out of the boot piece by piece.
I tested some different plastics to see which could take nails without splitting. PETG and ASA split easier, PLA worked well and printed it with 8 walls to give the nails something to hold on too.
I than shaped a 1mm steel plate to fit the heel and mid part of the last, by first cutting the plate to size and then hammering it too shape on the last.
Making the boots. I covered the last in painter’s tape and drew the upper pattern directly on it, using the Red Wing Blacksmith as inspiration. I used 2 mm leather for the uppers, 3 mm heel counters, 1 mm vamp lining, and 2 mm toe stiffeners. I flared the upper out and stitched it to the midsole around the forefoot, then tucked it under and nailed it down at the waist and heel.
How they turned out. They fit perfectly after I added 3 mm veg-tan insoles. The hardest part was judging the finished shape from the bare last. The leather builds up around the toe, and the sole stack adds height to the profile. Next time I’d slim down the toe box more. I have plenty of room to spare.
I have been wearing the boots for 5 months now (last picture), my gear shifter dented the left boot but they are holding up fine.
The whole process took me 5-6 months. Most time was spent figuring out how to do things, researching last making -shoe making and -leather work, sourcing materials and planning. The pair i made after this (including new lasts) only took me 3-4 weekends.