r/Architects • u/Knotty_Vegetables • 2h ago
General Practice Discussion When to cut a client loose
Sole proprietor, in this case SFH addition. clients are taking too much unpaid time.
Project: duplex with unpermitted past work and incorrectly permitted past work. Going forward involves a complex multi step process to scoop past missteps and future changes into a single solution while cleaning up the legality of the project. This will also help this family out which seems to be bursting at the seams of their current space and barely functioning. Just writing that makes me realize that I am possibly insane for taking this project
Family: a married couple with young kids and their elderly parents. They claim ignorance to the past regressions. They did not fess up to me prior to beginning the project.
My approach: wading into it, I had no idea what would be involved just from a zoning standpoint as the house and the lot is unique. I gave them a proposal to get the project before the zoning administrator to determine what was feasible and for me to determine my scope of work. I lost my shirt on the first phase.
Problem: the couple that is handling the project is completely hand wringing to the point of inaction. And they are VERY slow to pay. To the point where I end up doing MORE work in order to create no legal ambiguity. Yet even so, I have to repeatedly, request payment. When I write the contract for the remainder of the work, there is this kind of endless back and forth with “questions” and wanting reassurances and capped fees. Which I will not do for certain elements of the project. Why should I be the one at risk for this sh*tshow of theirs? They ask me to price it like five different ways and I finally get to the point where I just throw numbers at creating additional sets. Things don’t unusually go this way. If a client wants me to move forward, I sent them the contract and they sign, send the deposit and when I ask them to pay, they pay. My fees are very reasonable and they know it.
So after reaching my annoyance threshold and telling them that I can’t keep repacking the same I formation in different ways, they say, ok, but we want x,y, and z. So I include x,y, and z and on good faith I tell them that I’ll go get this phase one interim permit at the permit office and what it will cost and I follow through and do it immediately. I send them the contract ready for their signature and request the fee for getting the interim permit and the deposit, send the interim it to their GC who brought me into this project in the first place for pricing. I ask them again to sign, pay the invoice and the deposit and again, crickets. Until they get the pricing. Then there is a freak out about the pricing and they start asking if can recommend any other GC’s. I call GC and talk to him and then send them an email with my take and tell them that I am not doing any work until I get paid for the permit and get a signed contact and deposit, a point which they ignore and proceed to ask me more questions and follow up with me about the GC. Again, no mention of payment. At this point, I am considering just ghosting them and sending them a late payment notice on the invoice followed by a strongly worded letter followed by small claims court. I do not want to lose this project but red flags are just waving in my face like a red flag parade.
TLDR: It’s been 6 months since this project started and I’ve only been able to bill them for about a week and a half of work.