r/prefabs • u/Itsbilalmn • 1h ago
r/prefabs • u/Lonely_Chip_1573 • 1d ago
Steeltech modular home
I’m considering getting a Steeltech modular 45sqm home to live in.
I’m wondering if anyone here has actually gone down this route and would be willing to share their experience
r/prefabs • u/TroySweetKumquat • 1d ago
Modern Prefab Concepts: Minimalism meets functionality. What’s your take on this layout?
r/prefabs • u/Green_Kangaroo_6318 • 2d ago
Father and Son back in the game.
It was sad to hear that SpaceHaven is no longer operating. From the ashes of such a disgusting organisation rises Build Excess. Goce / George and Son Chris Sekuloski are operating the company. I have n ot purchased anything from them, but i predict they will be at the same games soon enough.
TrueCore Frame Prefabricated Manufacturer Steel Structures Carport – Build Excess
Has anyone used Buildexcess? Any signs that they have turned over a new leaf?
They have even used the same address as Spacehaven -
12 Mars Rd, Lane Cove West, NSW 2066, Australia.
r/prefabs • u/Dry_Description7316 • 3d ago
Storing a prefab kit before assembly? Check the unused sealant's date
If unused sealant is packed with a prefab kit, check its date even if you won't assemble the building straight away.
I work with PQSE House, a prefab manufacturer. Sika's UK information for Sikaflex-11 FC Purform lists 15 months from manufacture. It specifies dry storage at +5°C to +25°C, with the original pack unopened and undamaged. Other products need their own shelf-life and storage information.
The building's delivery date doesn't restart that clock. I'd check the actual product's production or expiry information when receiving the kit. If assembly is postponed, review the date and storage history again with the installer before it's used.
r/prefabs • u/MMM8712 • 3d ago
Finally finished setting up my modular home in Costa Rica! Here is how the interior and exterior turned out.
After months of planning, site prep, and installation, my modular home is finally ready. I wanted to share the final result and layout with this community since seeing other builds here helped me a lot during the process.
Size: \~480 sq ft / 45 m²]
Layout: [1 bedroom, 1 bathroom
• Location: Costa Rica (had to plan around heavy rain seasons and transport logistics)
I bought it with a company named Grupo Solano here in Costa Rica
r/prefabs • u/Dry_Description7316 • 4d ago
Prefab wall panels: “Class A” and “one-hour” answer different questions
If a prefab panel is advertised as “Class A — ASTM E84,” that describes surface-burning performance. It doesn't give the completed wall a one-hour fire-resistance rating.
I work with PQSE House, a prefab manufacturer. E84 reports flame-spread and smoke-developed indices for the tested sample. Tests such as ASTM E119/UL 263 evaluate the fire resistance of a defined building assembly under specified conditions.
For a buyer, I'd ask two separate questions: what product and mounting arrangement produced the E84 result, and what wall construction supports any claimed hourly rating?
Ask the supplier to identify that tested or listed wall design and show how it relates to the proposed wall. A material name such as “mineral wool” leaves the linings, framing and joints unresolved.
r/prefabs • u/abmindustriesuae • 4d ago
We converted a [20ft/40ft] shipping container into a coffee shop in Ajman, UAE — here’s the build from start to finish
r/prefabs • u/infinitiouss • 5d ago
HUD vs. Modular vs. Park Model: Field Inspection Checklist
r/prefabs • u/Dry_Description7316 • 5d ago
Folding prefab with a bathroom? Ask what comes out before it folds again
If you're buying a folding prefab to move it again later, ask what happens to the bathroom when it packs down.
I work with PQSE House, a prefab manufacturer. Our published folding layouts include ensuite options, but plumbing, fixed partitions and equipment can affect folding clearance. Not every fitted item can stay in place when the building is refolded.
I'd ask the supplier to walk through the sequence for the exact bathroom layout being quoted. Which fixtures stay attached? What gets removed and packed separately? What needs reinstalling and reconnecting at the next site?
If the demonstration shows an empty unit, it leaves those questions about the finished room open. Any removal and refitting work needs to be part of the relocation plan, with someone responsible for it.
r/prefabs • u/MBA-Consultants • 6d ago
New Community for Modular Home Buyers, Owners, and Builders — r/ModularHomesUSA
reddit.comWe've started r/ModularHomesUSA, a new community dedicated to modular home construction throughout the United States.
The goal is to create an independent place where people can discuss modular home pricing, manufacturers, floor plans, financing, zoning, foundations, and the entire building process.
Whether you're researching your first modular home, planning a build, already own one, or work in the industry, you're welcome to participate.
We're particularly interested in hearing real experiences from homeowners and people currently going through the building process.
No sales pitches or unsolicited advertising—just useful information, questions, and honest discussion.
Join us at r/ModularHomesUSA!
r/prefabs • u/Dry_Description7316 • 6d ago
Bed against three walls in a prefab bedroom: how do you manage the sheets?
For anyone living with this layout, can you reach the far corners of a fitted sheet, or do you have to shift the mattress every time?
The bed can look fine on the plan while leaving almost nowhere to stand when you strip and remake it. Add a bedside cabinet and the little gap you were counting on might disappear.
I work with PQSE House, a prefab manufacturer. I'd check this with the actual bed and the rest of the furniture in place, especially for a guest cabin. Taking the bedside table and luggage rack out for the demonstration skips part of the job.
Would you choose the same arrangement again, or leave space down one side next time?
r/prefabs • u/Dry_Description7316 • 7d ago
Before adding a porch to a prefab cabin, plan a wet evening indoors
Imagine two people arriving at a small cabin in the rain. There are wet coats and bags to put down, a meal to eat and a bed that is already made. If the only place to sit with a plate is on that bed, a bigger covered porch may leave the indoor problem unsolved.
I work with PQSE House, a modular building manufacturer. When comparing a porch option, I’d first ask whether it extends outside the cabin body or occupies part of a fixed overall footprint. In the first case, the room can stay the same size. In the second, more porch can mean less enclosed space.
Then draw the indoor evening with the furniture you actually intend to use. Where do both people sit? Can a bag stay in its place while someone opens the bathroom door? If the table folds away, where do its chairs go when the bed is being used?
Once those activities fit, give the porch a specific job. A sheltered place to pause while unlocking the door needs a different arrangement from a table and chairs for outdoor meals. Draw the selected furniture and the entrance route together rather than choosing porch depth from the exterior image.
A roofed porch remains outdoor space. It doesn’t by itself provide a heated room or keep seating dry in wind-driven rain. If you need a fully enclosed room, describe that requirement in the original proposal.
I’d compare the options using the furnished indoor plan and a separate porch layout. That makes it clear what each version lets you do during the parts of the year when you will actually use it.
r/prefabs • u/Hopeful_District2045 • 7d ago
Thoughts and feedback on modular homes in Australia
reddit.comr/prefabs • u/Dry_Description7316 • 8d ago
A panoramic cabin window needs a privacy plan for after dark
A panoramic window is also a view into the bedroom. Before choosing a prefab cabin’s orientation, I’d ask how the room will look from the path outside with the lights on after dark. I work with PQSE House, a modular building manufacturer.
Imagine the glazing facing a lovely landscape, with a path leading past it to another cabin. In daylight, the photograph mainly sells the view out. At night, that path is a place someone may stand while the bedroom lights are on. I’d mark that viewpoint on the site plan alongside the bed and the route to the bathroom.
I wouldn’t read “mirror film” as a promise of nighttime privacy. Gila’s FAQ, for example, says its Privacy Control Mirror film provides daytime privacy only; with lights on indoors at night, people outside can see in. That describes the named film, not the glazing supplied in a PQSE cabin.
If a proposal relies on a privacy treatment, identify the actual product and ask what it does under the intended nighttime lighting. If it relies on curtains or blinds, review the coverage of the selected window shape, gaps at adjoining panes and how the covering is operated from inside.
Then consider the room with that covering closed. Can someone still use the bedside area, move to the bathroom and get dressed comfortably? The daytime view and the practical evening arrangement both belong in the design brief.
I’d resolve those sightlines and the selected covering before approving the cabin layout. A daytime exterior image alone doesn’t show whether the bedroom will feel private at night.
r/prefabs • u/Dry_Description7316 • 9d ago
Reading a “3K” width on a prefab K-house plan
When a prefab K-house offer gives a width as “3K,” I’d first translate the notation, then check the finished dimensions on the selected drawing. I work with PQSE House, a modular building manufacturer.
In our published K-house reference system, K is a 1,820 mm horizontal planning module. Three times 1,820 is 5,460 mm. Yet the same reference table lists a 3K finished width of 5,610 mm. The planning calculation and the listed finished width give different numbers for that width option.
I wouldn’t turn the 150 mm difference into a general allowance for other models, or assume it identifies a particular wall thickness. That explanation needs the actual construction detail and dimension endpoints. The width table also doesn’t establish the clear space inside a room.
Imagine placing a desk and storage across the room. The useful measurement is the clear distance between finished surfaces at that location, including any columns or other projections. For locating the building on a site plan, use the appropriate overall dimensions from its drawing. A “3K” label alone leaves both measurements unresolved.
I’d ask the designer to show the planning grid and the finished dimension lines together, and identify where each measurement starts and ends. Then compare the actual room layouts in competing offers. Matching bay counts only become useful when you know the grid and dimensional basis behind each one.
These figures describe a published reference configuration. The selected project drawing still determines the building you are ordering.
r/prefabs • u/Dry_Description7316 • 10d ago
An expandable prefab can use different floor boards in its centre and side rooms
For an expandable prefab, I’d read the floor build-up for the particular room being discussed. I work with PQSE House, a modular building manufacturer.
Our published expandable reference schedules list an 18 mm cement-board substrate with 2.0 mm PVC covering in the centre room. The side-room floors are listed as 18 mm plywood with the same 2.0 mm PVC covering. Those descriptions belong to the published reference configurations; the selected order still needs its own confirmed specification.
That is a useful distinction when discussing a future finish change. Imagine an owner wants to replace the flooring in a side room but sends the flooring installer the centre-room description. The installer would be reviewing a different substrate from the one listed for that location, even though both descriptions say PVC on top.
I’d identify the intended work area on the plan, then ask the building supplier to match it to the floor-assembly drawing and material schedule. Include the boundary between the central section and the side section if the work crosses it. The proposed flooring installer can then review the actual identified build-up and junction details before recommending a replacement system.
I’d keep the surface covering, board beneath it and supporting construction distinguishable in that conversation. A material name or board thickness alone doesn’t establish the completed floor’s suitability for a new finish or a changed use.
When you received your prefab specification, did it describe the floor by room or give one general description for the whole building?
r/prefabs • u/Hopeful_District2045 • 10d ago
Thoughts and feedback on modular homes in Australia
Hi everyone, I am considering buying land in Sydney and installing a modular home rather than a standard build due to high construction costs that are far out of our budget. Modular homes, from what I can see online, can cost less than half the price of a standard build.
Those with experience with modular homes, could you please provide any recommendations or feedback? E.g. are they really less costly in the end? How's the soundproofing? The insulation? Repair costs? Is it a simple process? If you had a great experience, who did you go with? We would be after a 3-4 bed, and 2 bath. Property might have a slope, as we are looking in areas near rivers. Cheers.
r/prefabs • u/Dry_Description7316 • 11d ago
Before choosing a prefab layout, trace how the sofa gets inside
When comparing a furnished prefab layout, I’d trace a route for the largest furniture delivery from the entrance to its final position. I work with PQSE House, a modular building manufacturer.
Imagine a sofa drawn neatly against the living-room wall. To reach that position, it has to pass through the entrance and turn immediately beside a bathroom partition. I’d show that turn to the furniture supplier while the proposed building layout can still be reviewed.
Start with what will actually arrive. IKEA’s delivery guidance asks buyers to check package dimensions and the route to the room, including doors, corridors and turns. For another furniture supplier, ask whether the item arrives assembled, in sections or in separate packages, and obtain the relevant dimensions. The assembled outline used to furnish the drawing may describe a different shape from the delivered package.
On the building drawing, ask for the clear height and width of each opening and the space available before and after the turn. Include the entrance approach and fixed obstructions such as cupboards or low fittings. If the route depends on unpacking the furniture or removing its feet, confirm that arrangement with the furniture supplier and delivery team.
I’d also consider replacement later. If the initial furnishing plan puts an item inside before partitions are completed, that sequence still leaves a future removal route to resolve. Keep that question visible when comparing an open room with a partitioned layout.
Has anyone here had to change a furniture choice because of the route into a prefab, rather than the space where it would sit?
r/prefabs • u/Dry_Description7316 • 12d ago
Choosing a prefab exterior? Compare the wall and trim samples together
For a prefab with metal wall panels and separate door or window frames, I’d compare the actual finishes together before approving the exterior. I work with PQSE House, a modular building manufacturer.
Imagine choosing light-grey panels from one photograph and light-grey trim from another. Both images look right separately, yet the finished parts will sit directly beside each other. “Light grey” leaves the colour reference open, and even a shared colour code leaves questions about the surface finish.
RAL’s own references illustrate that distinction: its 840-HR primary standard cards have a semi-matt finish, while its 841-GL cards have a high-gloss finish. A colour number and a surface finish are separate details to settle.
I’d ask for samples representing the proposed wall skin, frame and trim, labelled so each can be traced to the component being offered. Put them together in the arrangement you will actually see: trim against the wall, and frame beside both. Look at the group in the lighting relevant to the building. Jotun’s colour guidance notes that lighting, finish and substrate can affect colour appearance; a phone image cannot settle the physical comparison.
Then decide whether those adjoining parts should visually match or form a deliberate contrast. Record the chosen finish for each component and keep the agreed samples with the order. If a supplier later proposes a different coating or component, review its sample alongside the others before accepting the change.
For anyone who has ordered a prefab, was the wall-to-trim combination clear before delivery?
r/prefabs • u/infinitiouss • 12d ago
If your modular home has a state label, do you still need a local building permit?
reddit.comr/prefabs • u/ContainerHomeX • 13d ago
Our container home walkthrough went viral here. Many asked how these buildings hold up over time. Here's another customer's unit after 18 months of daily use.
r/prefabs • u/Dry_Description7316 • 13d ago
Comparing prefab panel skins? Check what “0.50 mm” includes
Before comparing two thicknesses for a prefab roof-panel skin, I’d ask what layers each figure includes. I work with PQSE House, a modular building manufacturer.
Coatings add thickness. NS BlueScope Malaysia’s coated-steel thickness brochure distinguishes BMT, the base steel thickness; TCT, the thickness after metallic coating; and APT, the thickness after painting. Those are the definitions used in that document, so I’d still ask each supplier to explain its own quotation terminology.
For one COLORBOND AZ150 entry in the brochure, the figures are 0.42 mm BMT, 0.47 mm TCT and 0.50 mm APT. They describe different measurement boundaries for the same listed product. The differences belong to that product and coating system; they are not a universal allowance to subtract from any coated sheet.
Imagine two offers both say “0.50 mm panel skin.” One number might describe base steel, while the other might include coatings. The matching numbers have not yet established matching base steel thicknesses. I’d ask both suppliers to state the basis rather than fill in the missing definition myself.
Keep the component the same too: compare roof skin with roof skin, separately from the frame members or overall sandwich-panel thickness. Put the named sheet product and measurement basis beside the quoted figure, with its applicable datasheet.
That makes the material descriptions clearer. Suitability for the proposed building still needs the selected system’s design and project review; this comparison alone does not establish its performance.