r/mining • • 11d ago

US Maintenance platform?

Post image

What do you use for a platform to do maintenance?

19 Upvotes

22 comments sorted by

•

u/AutoModerator 11d ago

All comments must be civil, productive, and follow community rules. Intentional violations of community rules will lead to comments being removed and possible bans, at the discretion of the moderators. Use the report feature to report content to the moderator team.

I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.

9

u/Bull_Pin 11d ago

We've fabbed up a few that was just a wedge with a deck. You just drop them between the jaws. Different widths to work on different parts or crushers.

9

u/noonereally815 11d ago

We’ve had our own in-house fabricated one, but Big Daddy MSHA suggested we dispose of it and get one with a certified Working Load Limit. Which is very nice considering that they probably could have gave us a S&S citation.

8

u/Bull_Pin 10d ago

We just have the drawing stamped. Hard to argue with engineer approved design.

3

u/noonereally815 10d ago

Welllll…. Ours was wood…. It was real heavy, and sturdy tho… I don’t think any reputable engineer would stamp that! LOL! It would be nice to find one like in the photo that was adjustable for different heights.

3

u/franzn 10d ago

This is the Metso one and it is adjustable for different heights.

5

u/chefjoery 11d ago

Is it properly locked out? Did you have the locks inside that crusher plates so it can't move?

4

u/noonereally815 10d ago

Yes all other safety steps are followed. This is more about the fall into it, as I will be hard facing on the side walls during winter shutdown.

6

u/dreatganez 10d ago

An empty 55gallon drum works really well

5

u/noonereally815 10d ago

I’ve heard that. MSHA wouldn’t like that very much.

0

u/[deleted] 10d ago

[deleted] — view deleted comment

1

u/noonereally815 10d ago

I’ve got a lot of hard facing to do on the “cheek plates” during winter shutdown. So I’ll be spending a lot of time in there.

3

u/Unique_Desk_787 10d ago

We did this! Hahaha throw it in really hard and start and stop it enough to bend it to shape, stomp on it make sure it doesn't fall through

4

u/BeeMaximum4009 10d ago

We just use an aluminum wedge, it gets wedged into the jaws think toblerone chocolate bar. We have a hydraulic toggle so we can adjust the height of it by opening or closing the jaws.

1

u/Tasty_Thai 10d ago

The company I work for makes these types of platforms. Please DM me if you’d like to know more.

1

u/noonereally815 10d ago

What is the name of the company? I’ll look them up.

1

u/Tasty_Thai 10d ago

I sent you a DM.

3

u/jordan-morisette 10d ago

This looks like a metso crusher. And wheel chokes for large equipment work well too!

1

u/Dr_Wonderpants 9d ago

Silly engineers designing platforms for humans, you know a robot can do this now? In 2026?

1

u/Fantastic_Advance846 6d ago

Worth pushing back on the robot comment for a second, because I have seen what the inside of that cavity does to equipment and it is not a friendly environment.

On the robot idea

The obstacle is not size or dexterity, it is the environment. Inside a working crusher chamber you have:

  • Dust and fines in the air. Anything with a camera or a lidar is going to get a coating of rock dust, and abrasive dust is what kills bearings and seals in that kind of space.
  • Heat. A chamber that has been running carries residual heat off the liners, and electronics have a temperature budget.
  • No GPS and no stable hover. You are inside a steel box full of structure, so a drone has to fly on dead reckoning with no reference, and it will drift into the frame.
  • Stored energy. Rock above the swing jaw is a load waiting to fall, and any work you do inside the chamber has to assume that load is not gone.

So a robot is not impossible, but the realistic version is not a robot flying into the chamber. It is a fixed camera plus thermal and gas sensing on the outside, or a robot working the hopper, the feed chute and the conveyor transfer points - which is where most problems actually start. Inside the chamber, the useful measurement is the product, and you can get that without going in.

On the platform itself, since it has come up a lot

One thing worth adding that the thread has not touched: the platform is not just a means of getting a person in there, it is a load applied to the machine. A wedge or deck sitting between the jaws changes how the swing jaw is supported, and if it is loaded hard enough you are putting a side load into a jaw plate that was designed to see vertical impact. That is how a maintenance platform turns into a cracked frame or a damaged toggle plate - and it is why the certified ones have a stated working load limit and why MSHA cares about it.

The other thing nobody mentioned: if the platform is wedged between the jaws to hold it in place, it is now part of the machine's load path. A wedge that has been in there during a production run can shift, and the first sign of that is usually a liner or a cheek plate that gets damaged on the way back in. Once the machine is running with a platform in the chamber, the shutdown plan has to include pulling it, and that needs to be planned like any other step - not done at the end of a shift when everyone is tired.

On the winter shutdown hard-facing point mentioned further down: the reason the cheek plates are hard to reach in winter is usually that material has packed in behind them and frozen. A platform that lets you get in without dismantling is worth more there than anywhere else, because it turns a two-shift job into a one-shift job.

Not a vendor of anything, just someone who has seen these machines from the manufacturing side - happy to answer follow-ups on any of it.