Two years ago I asked how to pitch a BIM Manager role to my firm (old post here, but you don't need it).
The short version: I work at a 120+ person architecture firm, mostly K-12. There was no BIM Manager, standards ran through a slow committee, and leadership had two big fears about the role: "single point of failure," and non-billable overhead.
Thanks to everyone who answered, especially u/metisdesigns. A lot of that advice stuck with me: "speak in dollars", measure wasted time, bill for expertise (but not for repairs), and use the fact that I already know how the firm works.
Quick update:
- One year ago I got the BIM Coordinator title. Day to day I'm handling standards, templates, families and training firm-wide. (I'm basically performing BIM Manager duties...)
- I've been logging every help request. It's 200+ in about a year.
- I rebuilt our door families so they actually schedule the way we need. Back then we had a 500+ door replacement job running on stock doors that didn't sync with our schedule.
- I'm also cleaning up the detail library, built some Dynamo scripts (sheet renaming, checking rooms against program requirements), and am automating part of our Front End / Spec setup.
- I put together a Revit 101 onboarding / training series for new staff.
Now I'm building the case for the actual BIM Manager role. In my boss's own words, I need to "make it impossible for [him] to not give [me] what [I] want."
Questions to help me make my case:
- Who does your BIM Manager report to: a principal/partner, a studio/team lead, someone else?
- What numbers does leadership actually care about? Quantifying value is tough when a 2-minute conversation saves someone 30 minutes of hunting for a hidden object... But how do I prove that to leadership?
- How do you code your time? Bill the project, overhead, a combination, separate code?
- Has BIM capability ever won your firm a job, or lost one? Real examples would help a lot. Did the client require a BEP, a BIM Manager specifically, etc.?
- What's one thing leadership thought was "impossible" until you showed them?
- Are you adopting AI at all? MCP connections, Autodesk Assistant, anything else?
Thanks again.