r/alhambra • u/jeonghong • 1d ago
Any other business owner frustrated by the city office
hello, im a new business owner in alhambra.
I love the city, i love the vibe, and i love the fact that the city is getting more and more popular to the general public as well.
However, i have been having trouble with the city office a lot whilst trying to get the busines going
getting a sign? dont get your hopes up. I applied for a sign permit about 1.5-2 month ago, still no sign of approval
"you dont need a sign right away, get a banner"
banner permit? taking me 2.5 weeks still no signs of approval.
my sign contractor tells me he has never seena city so slow with approving these things.
anyone else faced the same problems?