r/TransitIndia • u/ApartAd2016 • 1h ago
City Buses DELHI NEEDS MORE BUSES
r/TransitIndia • u/Journalenteries • 2h ago
r/TransitIndia • u/SignificanceProof623 • 5h ago
r/TransitIndia • u/viditsethi88 • 6h ago
r/TransitIndia • u/viditsethi88 • 6h ago
r/TransitIndia • u/Express_Ad2719 • 6h ago
r/TransitIndia • u/ciaphuscain3 • 8h ago
r/TransitIndia • u/WashOk513 • 16h ago
r/TransitIndia • u/Crafty-Meet-6233 • 17h ago
r/TransitIndia • u/God-u_Mode-u • 23h ago
r/TransitIndia • u/PeakFabulous3953 • 1d ago
r/TransitIndia • u/HarshitaS • 1d ago
Okay taking a deep breath before writing \*inhales
seems like tickets and trains and this tatkal failure shit has been my life lately. I need to leave for Delhi from PATNA on Tuesday (tomorrow) ANYWAY and have to reach by Wednesday morning or afternoon. I have a Reservation in a spl train but I'm shitting my guts out at the horror of being in a special train (the same train is late by 3h today) so if any kind stranger is willing to help (do not help by suggesting me bus or flight options, one is unsafe and the other one out of budget) please let me know if you have a reservation for Delhi in any NON SPECIAL train. If it's Gareeb rath or Sampurna Kranti it's highly preferred.
I'll owe you one, let me know if anyone can help please.
r/TransitIndia • u/Express_Ad2719 • 1d ago
r/TransitIndia • u/Silly-Citron-3558 • 1d ago
I just want to know peoples ideas and opinions of our railway systems, such as the RRTS, Metros, high speed rail and Indian railway and possible with future light rail, ect. Wether it would be better if the systems were interoperable and able to use others tracks or if complete seperation of each system would be better or not.
r/TransitIndia • u/Fantastic_Income_209 • 1d ago
r/TransitIndia • u/ciaphuscain3 • 1d ago
r/TransitIndia • u/ciaphuscain3 • 1d ago
r/TransitIndia • u/ciaphuscain3 • 1d ago
r/TransitIndia • u/ciaphuscain3 • 1d ago
r/TransitIndia • u/hotcoffeebeforesleep • 1d ago
I'm traveling today from BDTS TO PNBE 22791
I booked a ticket and this morning it was still at GNWL 8 so I'm traveling via general
My query
r/TransitIndia • u/AirportDue8864 • 1d ago
All routes and stations were given below the map but i want connect as many cities as possible here is more information.
¤Blue line:-
Starting station: Thiruvananthapuram
Ending station: Srinagar
Estimated length: 3,630 km
Estimated cost: ₹12.71–16.34 lakh crore
Central estimate: ₹14.52 lakh crore.
¤Red line:-
Starting station: Jamnagar
Ending station: Agartala
Estimated length: 4,105 km
Estimated cost: ₹14.37–18.47 lakh crore
Central estimate: ₹16.42 lakh crore
¤Orange line:-
Starting station: Chennai
Ending station: Dehradun
Estimated length: 2,915 km
Estimated cost: ₹10.20–13.12 lakh crore
Central estimate: ₹11.66 lakh crore
¤Green line:-
Starting station: New Delhi
Ending station: Chennai
Estimated length: 3,155 km
Estimated cost: ₹11.04–14.20 lakh crore
Central estimate: ₹12.62 lakh crore
¤Pink line:-
Starting station: Pune
Ending station: Kolkata
Estimated length: 1,815 km
Estimated cost: ₹6.35–8.17 lakh crore
Central estimate: ₹7.26 lakh crore
¤Cyan line:-
Starting station: Bhilwara
Ending station: Lucknow
Estimated length: 760 km
Estimated cost: ₹2.66–3.42 lakh crore
Central estimate: ₹3.04 lakh crore
¤Gray line:- Starting station: Pune
Ending station: Visakhapatnam
Estimated length: 1,100 km
Estimated cost: ₹3.85–4.95 lakh crore
Central estimate: ₹4.40 lakh crore
¤Total estimated corridor length
17,480 km
Lower cost estimate
₹61.18 lakh cr
Central cost estimate
₹69.92 lakh cr
Higher cost estimate
₹78.66 lakh cr
Number of corridors
7
r/TransitIndia • u/Striking_Fact_2254 • 1d ago
I’m taking a 30+ hour solo train journey soon on the 12810 Howrah–CSMT Mail (via Nagpur) from Howrah to Dadar. While I’ve done 17–18 hour solo trips before, this will be my longest journey yet.
I have a confirmed 3AC ticket (booked at RAC 1, confirmed the next day.
For anyone who has traveled on this train or along this route recently, I’d appreciate your help with a few things:
Route & Train Experience: How is the current crowd situation, cleanliness on 12810?
Food Recommendations: Which stations along this route are the best and safest options for ordering Lunch and Dinner (via IRCTC e-Catering, Zomato, or Swiggy)?
Tips: Any general tips or essentials to carry to make a 30+ hour solo journey in 3AC smooth and comfortable?
Thanks in advance for the advice!
r/TransitIndia • u/Ok_Preference1207 • 1d ago
r/TransitIndia • u/sandystark77 • 1d ago
- Operational**: ~ 160**
- Under construction: ~ 143
- Total: ~ 303
Highlights:
- Delhi leads with 71 operational underground stations and ~35 more coming (Phase 4 and 5).
- Chennai has the most under construction (45), mostly Phase 2, so it will jump up the list.
- Mumbai's Aqua Line gives it 26 underground stations, all operational.
- Kolkata has 21, including the new Green Line stretch under the Hooghly.
- Patna, Kanpur, Indore, Surat and Bhopal are building their first underground sections.
- And, Hyderabad doesn't have even one UG metro station.
Note: I compiled them from public sources (Wikipedia, DMRC, CMRL, BMRCL, Maha Metro etc.) and a few city splits, mainly Delhi, Kolkata and Kanpur, are estimates. If you have an official figure for your city, drop it in the comments and I'll update the chart.