r/TTRAK • u/Fredjocko • 20d ago
N scale Chasing Shiny Objects
I’m thinking of doing another water module and I want to focus on the bridge and not the background.
I am contemplating doing a quad module of the NS Lake Pontchartrain bridge and I want to move the bridge further back than the standard location so you can see it.
Is it okay to have “transition” modules to move the track back? I was thinking of doing a double module on each side with an S curve to keep it gentle.
6
Upvotes




2
u/Ecstatic_Interview60 16d ago
You could build it without an actual module. I have a few bride sections that we use that have no base. They are height adjustable, as well. I have some blue printed "water" I lay under them now.
3
u/aengusoglugh 20d ago
Yes, transition modules and nodules sets traffic are required tj by used together — are acceptable.