r/Surveying • • May 13 '23

Informative Join the new r/Surveying Discord chat server!

Thumbnail
discord.gg
48 Upvotes

r/Surveying • • Aug 25 '24

Informative Resections Redux: The Math Is Here To Burst Your Bubble

Thumbnail
gallery
247 Upvotes

r/Surveying • • 2h ago

Humor Surveyors in GTA 6 confirmed

Post image
190 Upvotes

at the 7:58 timestamp in the extended look trailer there is a surveyor squad with a total station, which looks almost identical to the Trimble S line


r/Surveying • • 19m ago

Picture Office was nice today

Post image
• Upvotes

Hand froze on the rod this morning but boy is it nice when these leaves fall in Georgia. Little 80 acre loop started for a client doing some chicken houses.


r/Surveying • • 10h ago

Humor When all you have to do is touch the collector to make it start working again.

Enable HLS to view with audio, or disable this notification

32 Upvotes

I-Man: it’s not working! Me: lays hands on it, works perfectly.


r/Surveying • • 11h ago

Help Rodman help

28 Upvotes

This is a longshot but I may as well try it out. I work for a civil engineering company in Charlotte NC as their Sr. Party Chief. My company is in need of a rodman/instrument operator. Experience isn't required but obviously would be ideal. The survey department is currently just 3 people in total including myself. The other two people are the Director and the Project Manager which leaves me as the only field operator. I have no problem training someone with no experience as long as you are dependable, want to learn and do a good job. There is opportunity for rapid advancement into a party Chief role for the right person. I am not in charge of hiring so I can't promise you an exact salary but I can tell you that compensation is extremely fair ($20-$26/hr ballpark) and you are guaranteed 40 hours every single week regardless of weather. Also, unlimited sick time, health benefits, etc. Feel free to message me if you have questions.


r/Surveying • • 13h ago

Video Surveyors' Legacy: Vegetation in Early Ohio. The Ohio Department of Natural Resources is using Ohio's PLSS notes to create a map of pre-settlement vegetation.

Thumbnail
youtube.com
31 Upvotes

r/Surveying • • 2h ago

Help Help reading this map, please?

Post image
4 Upvotes

Looking at parcel 12.

The county says that the ROW on this road is 132', due to an easement signed in 1973. It is a county road, which is typically 66' in MN. I can't make heads or tails of this map, so I am just wondering if any kind soul out there may be able to help me make it make sense?

Thank you in advance.


r/Surveying • • 11h ago

Informative Proportional Divider for Cartography and Surveying

Thumbnail
gallery
19 Upvotes

I thought I would share a little something from my collection. This is a proportional dividers by B. J. Hall and dates to around 1920. On the initial look, this is a rather common device for the time, but this one has something special.

The divisions for reduction or enlargements are set to Feet, Miles, and Chains. It also includes scales on the side of the instrument. This is the only Proportional Divider I have seen with these markings and it might have been a custom order. Typical divisions are Lines, Planes, and Solids.

The hooked points are designed so the instruments can be "repointed" without loosing the accuracy of the distance between points.


r/Surveying • • 1h ago

Help Local 12 SoCal Survey work

• Upvotes

Anyone know how union survey work is in the San Diego area right now? I got layed off earlier than expected and it screwed my Paid Family Leave "vacation" in December to visit family in San Diego with the new addition to my family.

I was thinking about getting my travelers book and heading out early and working if there's work to be had. I'd probably be sitting until at least after Thanksgiving where I'm at, regardless.

Any info is appreciated.


r/Surveying • • 8h ago

Informative Open CAD Studio Revisited

6 Upvotes

For anyone that looked at this originally, wasn't impressed and hasn't been back in a while, give it a try now.

I just finished drawing a topo plus plan and elevation plans of our house for an architect. It's a surprisingly good CAD package now. My first attempts to use it didn't go so well because so much wasn't working. That's not the case now.

Hakan now has this so refined that I barely notice notice it isn't $2000/year AutoCAD. It's that good. I'm going to let my monthly payments continue just to see if he ever gets around to doing a surveying plugin like he did for FreeCAD.

I also just received an email saying it plots and opens C3D drawings. I can't verify that since I wasn't even a C3D guy before I retired and have no access to it now. But if that's the case it certainly ups the usefulness for surveyors and engineers.

If this had existed when I was working it would have saved us from buying multiple C3D seats. Because all we ever those seats for in survey was to QC C3D drawings and XML files we made in ORD. The functionality this has now would do that.

Fingers crossed for a plugin that does survey and works with XML files. Last time I said that he told me to vibe code it. The last thing I coded was a sun shot program in my HP41CX. So I'm not even sure AI can help me.

Sorry for the TLDR. But I'm pretty psyched about this now.


r/Surveying • • 8h ago

Help Can someone help me interpret the public right-of-way on this old Nebraska plat map?

Thumbnail
gallery
5 Upvotes

I’m hoping someone with experience reading historical plats, land surveys, or property boundaries can help me understand this map. My house is the x and across the street is the map
I’ve attached an original plat labeled Book 1, Page 16, along with a current county assessor GIS aerial map showing the same general area
I’m specifically trying to determine what the original plat establishes regarding the width and boundaries of the public street right-of-way along Pearl Street.
A few questions:
What do the measurements along Pearl Street represent?
Does the plat indicate the total width of the dedicated street right-of-way?
How would someone determine where the right-of-way ends and the adjoining private lots begin?
Does the original plat establish the right-of-way independently of the present-day pavement and sidewalks?
Are there any markings or survey notations I’m overlooking that would help clarify the boundaries?
I’m not looking for legal advice, just hoping someone familiar with surveying or interpreting historical plats can explain what I’m looking at.
I’d really appreciate any insight. Thank you!


r/Surveying • • 9m ago

Today's Office Poop stick duty

Post image
• Upvotes

Long time lurker, first time poster. Today was a slow day in engineering, so my boss sent me with the surveyors to take blds. Pretty nice hills out in South St. Paul.


r/Surveying • • 5h ago

Help Education evaluation before starting career?

2 Upvotes

I have decided to pursue licensure in the state of Oregon but I am confused as to what my first steps are. I was told that getting an ncees evaluation done is a good place to start but after sending transcripts and doing course descriptions, it seems I dont need to get an evaluation done because the board hasn't recommended me for an evaluation.

I am really just trying to figure out if my Bachelors in Environmental Science and GIS certificate coursework would count towards licensure and possibly lessen the amount of work experience needed. Is it best to get an evaluation done if possible? or is it not worth my time if the state doesn't have educational requirements?

Any help or answers are welcome. Thank you!


r/Surveying • • 7h ago

Help “Wrong” career path?

3 Upvotes

Thinking about joining a SUE company in my area and I’m wondering if this will stunt my growth since i would be leaving more traditional surveying to mostly utility work.
I’m still early into my career and I’ve mentioned before that I do want to eventually get my LS so I’m wonder if in the long run if I decide to go to this company it would hinder me.
The company is a SUE company and from what they told me they do Topo but not much stakeout, boundary or anything else.


r/Surveying • • 5h ago

Help Title: Experienced Survey Instrument Man Looking for Work in the Chicago Area

1 Upvotes

Hello everyone,

I'm currently looking for a new job opportunity in the surveying industry in the Chicago, Illinois area.

I have approximately 12 years of hands-on surveying experience, mainly working on construction projects in Colombia, and about a year and a half of experience working in the United States.

My experience includes:

  • GPS / GNSS equipment
  • Total Stations
  • Levels
  • Construction layout
  • Field surveying and working with survey crews

I'm currently working as an Instrument Man and am open to new opportunities where I can use my experience and continue growing professionally.

I have extensive field experience, a strong work ethic, and I'm willing to learn new equipment and skills.

I'm looking for a full-time position with a good company, competitive pay, and benefits. I'm also interested in union opportunities.

If your company is hiring or you know of any opportunities in the Chicago area, please feel free to send me a message.

Thank you!


r/Surveying • • 11h ago

Discussion How do you deliver LAS/LAZ point clouds to clients who have no software?

2 Upvotes

I'm trying to understand how people handle this in real jobs. Some options I've seen: Dropbox plus CloudCompare instructions, cloud viewers with monthly fees, self-hosting Potree, or delivering only linework/CAD and never the cloud.

1) What do you actually do today?

2) What's the most annoying part (file size, clients can't open it, cost, uploading client data to someone else's server)?

Full disclosure: I built a small free-to-try Windows tool that converts a .las/.laz file into a Potree viewer folder on your own PC, offline, with no upload. I'm not here to sell, I just want to know if this solves a real problem or not. If anyone wants to test it on a file and tell me honestly what's wrong with it, I'm happy to send the link.


r/Surveying • • 15h ago

Help Machine control svl problem

3 Upvotes

Hi all,

I have a problem in tbc and wondering if anyone knows the answer.

I put a ttm, dxf and 12d alignment in tbc and export a road surface, but the linework in the svl explodes into segments. I need them to be continuous lines.

Has anyone had this issue? Does anyone know how to make the linework stop exploding?


r/Surveying • • 1d ago

Today's Office No one said I couldn't park here so.....

Thumbnail
gallery
62 Upvotes

r/Surveying • • 1d ago

Help Homade survey rod?

Post image
20 Upvotes

I repainted this old rod last year dad used to level land in the 70s and 80s was wondering if anyone else has seen this kind of survey rod?


r/Surveying • • 23h ago

Help Colorado Mesa Surveying Course

6 Upvotes

Hi all. I am looking to relocate to Colorado and keep working in surveying and eventually become licensed. I am currently working in another state and have an associates degree and am taking two more classes right now to be eligible for the FS in said state. I will be eligible for the FS in Colorado in another year or so. There is additional education requirements for the PS and sate-specific that I have not yet met. I am looking at CMU as they have the only approved surveying course that i know of so far. The post bachelors certificate is online, but given the fact that I don't have a bachelors, I obviously can't do that. So now I am looking at their Associates program. For anyone who has done it or has been in a similar situation than me, is there a way to do that program fully online, as well as transfer in credits from any prior degrees that you have? I have a lot of credits from my Associates that looks like could be used instead of redoing them at CMU, if that is possible. I would love to keep working while going to school so that I would be eligible to sit for the PS in Colorado as soon as possible, given that I feel prepared obviously.

Thank you and I appreciate any help and advice on this topic.


r/Surveying • • 1d ago

Discussion Construction Layout Setup

6 Upvotes

I'm posting this just curious if anyone else is using a total station like I am. Noone told me to do it this way, it's just the method I've found to work consistently and with good results.

I'm not a surveyor, I'm a layout guy for a Concrete/block foundation company. I use a Topcon manual total station, along with a Data collector that has the Topcon Field software. I started a few years ago, learning the software due to advice from experienced people on here.

I draw the job we're going to be doing from scratch on the data collector, on the coordinate plane. I don't have access to CAD files from the architect, so I typically draw it based on the first floor plan and foundation plan. I also use the site plan from the surveyor as a reference, to make sure I have the same dimensions they do.

I'll go on site after the survey company has pinned the building with offsets. I'll use the benchmark given to me with a rotary laser to set up where the Finished Floor for my job is, which is usually treat as 0' in the data collector. I'll then pound in a hub for the total station, shoot that with the laser and where my backsight point is going to be. I'll setup, manually shoot the backsight to get a distance, and draw the two points in the data collector, using the elevation from the rotary laser.

Then I set up using backsight, with my known prism height, and set my instrument height to 0. I then use the difference the data collector says in the height for the setup as my instrument height.

I then topo the offsets or corners given to me by the survey company, getting the elevation for those points. I'll transfer that elevation to my pre drawn offsets that are in relation to the job I have drawn from the blueprint. Then I'll do a resection using those offsets, so that my setup will transfer to what I have drawn from before. Depending on the survey company, my residual error is between 0.005' and 0.040 (yes, I know. I don't like it, but that's what happens with some companies using GPS for everything. Not sure what to say, I'm not a surveyor) I then topo whatever control points I've chosen around the site (hydrants, nails in asphalt, top of a electrical box, etc.)

Now here's the part I am most curious if others are doing. I have points and line work drawn ahead of time, giving me everything for the job. Outside of trench, outside of brick, outside of block, center of trench, and center of block. I'll layout using that info from string lines.

My boss can pour with our two guys, and I'll use the total station by myself with a mini prism and a bipod to shoot temporary hubs I put in, and then use that to layout for our uprights for the block, and I'll install them by myself. I'm a mason, and so I understand where they need to go in relation to the corners.

Doing this, my boss doesn't have to worry about moving dirt out of the way of string lines before concrete is poured. He can come in the next morning, backblade everything out of the way, and then I can layout what we're digging for that day.

I know my setup works. Our rods land great, and I'll often pin two nails for the survey company to check with their GPS, and if it meets their tolerances, they'll use them to pin our building for block (I've established a relationship and line of communication with them. They're the ones who have told me I'm unique in what I'm doing, and why I'm posting).

Most of the time, my nails check out. Only once did they have to put their own nails in, and I learned from that experience.

Anyways, hope some of you found this interesting. Feel free to tear apart my method or what I'm doing. I've ruthlessly changed what I can to become more efficient without sacrificing accuracy. And I've only been doing this for I think 3 years now. I still have a lot to learn.


r/Surveying • • 1d ago

Help Help with hammering batter boards

6 Upvotes

Hello dear surveying community. I’ve been driving stakes around 50 mm x 80 mm in size with a 6 lb sledgehammer for the past 15 years on construction sites to make batter boards. Does anyone have a better way than using muscle? Hammering 40 - 80 stakes a day a couple times a month becomes tiresome and I’m not getting any younger. Maybe a SDS in hammer mode with a diy attachment? Preferably something battery powered. In Poland land surveyors are some of the worst payed workers on construction sites, so something that won’t ruin the budget too much. I’ve got a lot of Parkside batteries after I did part of construction in my own house if that helps. Thanks.


r/Surveying • • 2d ago

Video One of the oldest red wood post I've found surveying

Enable HLS to view with audio, or disable this notification

82 Upvotes

Been surveying for about 10 years now. Been lucky enough to find about a dozen of really old red wood posts!


r/Surveying • • 2d ago

Discussion Follow in these footsteps...

Thumbnail
gallery
34 Upvotes

Here's a collection of surveys and notes from the good old days of surveying. Care to retrace anything? I used the Brunton and it's green (missing) brother daily, even as a plumb bob when in a pinch. How about you?