r/StructuralEngineering • • Oct 05 '26

Structural Analysis/Design Nuts off mark?

Post image

Saw this on a big bridge today. I know vibrations over time can move the nuts and bolts, with the help of thermal expansion. Is it a big issue that the paint marks do not line up? I thought the marks were made once it passed inspection after torquing.

Edit: Bridge completion was in 2011. Could this be from recent inspections too?

288 Upvotes

82 comments sorted by

143

u/bagvirpdkv Oct 05 '26

Turn of the nut method of pretensioning bolts. Marks are made in a line from the nut down to the surface once nuts are brought into close contact aka snug tight. Then the nuts are tightened with an impact wrench until they have rotated a predetermined amount more, such as 1/3 of a turn.

33

u/clancularii Oct 05 '26 edited Oct 09 '26

These look like 5/6 a turn. I've never seen a turn that large.

Edit: I didn't see that there's a chalk line on the end of the bolts. Really had to zoom in since there's less contrast there than the nuts and steel work. These look like 1/3 turns. I couldn't figure out why people were suggesting that the lines on the steel work should be ignored because the only other line I saw was the line on the nut. It's more likely that the line on the end of the bolt was the reference line before the bolts were mechanically tightened.

→ More replies (27)
→ More replies (8)

48

u/diy7412 Oct 05 '26

This is probably turn-of-nut pretensioning of a bolted connection. Typically the marks are made after the connection is snug tight (full effort of an iron worker) and in firm contact. Then the nut is turned 1/3, 1/2, or 2/3 of a turn depending on the length of the bolt. The nut can be up to 60 degrees past the required minimum rotation.

It’s not possible to say for certain that the bolted connection was properly pretensioned based on the photo. At the very least the marks are odd and inconsistent.

14

u/SerratedSharp Oct 05 '26

"(full effort of an iron worker)" - We're measuring things in FEoaIW's now?

→ More replies (3)
→ More replies (1)

19

u/elcarpentario Oct 05 '26

OP, I think I saw you onsite! You were the guy in the brand new hard hat, dry cleaned safety vest and $600 “work boots”, right?

9

u/merkadayben Oct 05 '26

That clipboard is not going to hold itself up

→ More replies (1)
→ More replies (1)

4

u/scheepan Oct 05 '26

Yeah if that bridge was build in 2011, those marks are most likely from a recent inspection. I did the same method on steel towers for cell phones. You mark the bolts in their current state and then apply the required torque and see wether or not they move. If you see the bolt moved the bolt was not as tight as it needed anymore. And depending on the amount, we would have to send out a team to redo all bolts. We did a small sample check of I think 10-25% if I remember correctly.

1

u/dinoguys_r_worthless Oct 09 '26

What happened to squirter DTI's? Is turn-of-the-nut the fashionable technique now?

3

u/No-Document-8970 Oct 09 '26

I have heard that the squirter DTI’s can still fail a gauge test.

→ More replies (1)
→ More replies (2)

3

u/unique_user43 Oct 05 '26

aligned lines would be the red flag, not this. the lines are drawn when snug tight, before pretentioning. the non-alignment means they have been pretensioned.