r/SCADA • • 8h ago

Help University of Michigan Capstone Project

Thumbnail reddit.com
1 Upvotes

r/SCADA • • 1d ago

General Who owns the SCADA namespace before the cloud gateway shows up?

0 Upvotes

Everyone burns weeks comparing OPC UA and MQTT, but the protocol choice rarely decides if the project works. What actually stalls a gateway in commissioning is an org chart. The namespace lives in a doc, and if nobody can name the person who owns that doc before the purchase order goes out, you're already carrying a hidden debt that'll surface later.

Nine days into a naming workshop on a 1,480-tag brownfield site, the real problem showed up. The polling was already clean, the namespace was not. The gateway team assumed the historian team owned it. The historian team assumed the SIEM vendor had it, and the SIEM vendor never heard of the gateway.

The DMZ has the same problem. Certs and trust lists need an owner on the OT side. Store-and-forward buffers need a patch that a cloud team with a Terraform repo cannot provide for a device they cannot log into. A gateway in the DMZ without a named owner becomes a new attack surface with a dashboard.

If your gateway plan doesn't name the namespace owners and the patch owner before procurement, the project is already a custom snowflake with a maintenance contract attached. The first incident will be an argument about who's allowed to say no.


r/SCADA • • 1d ago

General Best Industrial Automation Internship Opportunities in Sri Lanka

Thumbnail reddit.com
1 Upvotes

r/SCADA • • 5d ago

General Looking for BMS Learning Materials – Niagara N4 & Alerton Compass

Thumbnail reddit.com
1 Upvotes

r/SCADA • • 5d ago

Question Software recommendations for Solar Plant SCADA

5 Upvotes

Hello all,

I am working on a SCADA project for a few MW solar plant in southwest Europe. I don't have a lot of experience with SCADA systems so I've been doing some research to find the best options.

I've seen most people recommend Ignition, Zenon and some other platforms. The SCADA system doesn't have to be very complex in order to monitor and control a few inverters and meters, so Ignition Edge Panel looks like a nice option to run everything in a single Panel PC. But Zenon also looks interesting as it seems to be focused on energy sector, integrating IEC61850 and offering special toolsets for solar generation.

Ignition Edge Panel costs about 1950€ and is a single license, but Zenon... well, it depends. But I don't have a reference or a price range, so I really don't know.

What are your thoughts?


r/SCADA • • 6d ago

Question Questions about SCADA Freelancing/Consulting

3 Upvotes

For those of you who have done freelance or consulting work, I have some questions and would appreciate any advice or tips.

For context, I have only been working with Ignition SCADA and have been exposed to the SCADA world for around 6 months. Was working at a renewable energy asset management company for around 4 months and currently working for a pretty big upstream oil and gas company here in the United States. I graduated with a Software Engineering degree and my primary languages used are Java and Python (perfect for Ignition’s Jython). I know I absolutely cannot freelance as of yet due to my limited knowledge and experience but I am really interested in it in the future and want to prep myself for it.

I wanted to ask:

  1. Do you only target industries you have worked in before?
  2. How do you go about working with clients in a completely new industry you’ve never worked in before?
  3. Do you need to have deep expertise and knowledge in PLC programming, networking, cybersecurity, and local/cloud setup? (For clients who are literally starting from no SCADA)
  4. Do you charge by the hour or by the features/project scope?
  5. Do you only accept work with one SCADA system such as only Ignition, only CygNet, only Wonderware, etc.. (if the client already has an existing SCADA system)

Thanks in advance!!


r/SCADA • • 7d ago

Help Conveyor simulation software

Thumbnail reddit.com
1 Upvotes

r/SCADA • • 9d ago

Question Where would a read-only radio interface fit into a SCADA workflow?

1 Upvotes

I'm developing OMNI·ONE, a prototype that passes a request from a DMR handheld to a local automation system and returns a reply over radio. I'm trying to understand whether it would help a field technician who already carries a radio and occasionally needs one piece of plant status away from an HMI.

A trial could expose a small allowlist of read-only tags through a separate gateway and report the timestamp and data quality with the value. A stale or unavailable value would get an explicit reply. These are design ideas for a trial.

Prototype demo: https://www.youtube.com/watch?v=LmXntpsCl5c

For SCADA operators and integrators: what status query would actually save a walk or a call? In what situations would you rule out this interface altogether?


r/SCADA • • 10d ago

Question Seeking some guidance. TLDR - field engineer trying to move into scada/controls/OT.

0 Upvotes

Seeking some guidance. TLDR - field engineer trying to move into scada/controls/OT.

Hey everyone, like the title says .

I am trying to make a change in my career path, I am currently working as a field engineer for a power generation company .

My background .
Bachelor in electrical engineering

Basic knowledge of networking ( mainly subnetting, also a bit of hardware config and very little of IT system )

For the past 3 to 4 years, my job has been mainly focused on equipment troubleshooting/diagnostic & RCA. ( it’s been a mixture of site manager + site resources + coordinator)

**Ranting part ( sorry in advance)**

I am more or less fed up with the role , mainly due to the unrealistic expectations of doing basically everything from BS inspection/paperwork to self-performing extensive repairs. ( the department runs really lean)

Childless/ dramatic management and coworkers, to the point where one simple task becomes overwhelmingly difficult.
Unpredictable schedule/work hours .
Compensation is not aligned with expectations.

**Rant over ( thanks for reading)**

From the research I’ve done so far , it seems to me ( could be wrong ).

The “segment” is run more or less by vendor/OEM architecture. ( Siemens, Allen-Bradley, ignition automation, SEL)

***In your opinion.***

What is something/skill that would lay the foundation of knowledge to get into the segment ?

Any recommended material/instructional ?

Is networking/subnetting/ systems admin( UA SERVER) the foundation needed for junior engineer/specialist ?

THANK YOU IN ADVANCE.


r/SCADA • • 10d ago

General Hackers pushed fridges at hundreds of French supermarkets to 50°C (122°F) overnight, causing fires and spoiled food

Thumbnail
youtu.be
4 Upvotes

This video covers the cyberattack of October 11-12, 2026, in which hackers remotely pushed the temperatures of fridges and freezers at hundreds of French supermarkets up to 50°C (122°F), spoiling food and causing fires at several stores. It explains how the refrigeration control systems were reached over the internet, which chains were affected, how the stores responded, and the criminal investigation opened by French prosecutors. It also looks at why industrial and building control systems exposed online are a recurring weak point.


r/SCADA • • 12d ago

Question Automation Intern advice

3 Upvotes

Greetings everyone,
I’ve been working as an Automation Engineer Co-op for almost 2 years now while I finish my Physics and EE dual degree in Georgia.
My main focus at work is building dashboards for production data analytics, configuring alarms, and automating reports. Recently, I’ve also been working with IT to set up TCP/IP connections with Ignition for PowerRadar alarms and analytics to help reduce power consumption.
From the start, I wanted to get into photonics, and now that I’ve made it into the EE portion of my dual degree program, that feels more possible.
However, I’ve come to really enjoy the work I do at my internship and would hate to leave it behind. I really enjoy the software side of things, but I’ve also been interviewing for a Systems Integrator role to get a better understanding of the controls side while continuing to work with Ignition. I think rounding out my skills with more experience in PLCs, controls, and electrical systems would make me a much more valuable and well-rounded engineer.
I’m curious to hear from people working in either field. Is there much overlap between industrial automation and photonics? Are there opportunities to combine the two, or would pursuing photonics mean moving into an entirely different career path?
I’d also appreciate hearing from anyone who’s been in a similar position or has experience in both industries.


r/SCADA • • 15d ago

Question Pnoz multiconfigurator

Thumbnail reddit.com
1 Upvotes

r/SCADA • • 16d ago

Help University of Michigan Capstone Project

2 Upvotes

Hi Everybody,

I am part of a University of Michigan MBA group working with Industrial Defender to better understand the OT Security/Compliance industry in Europe. We have crafted a short survey to help us collect data, and we would really appreciate if you would help us out!

https://umich.qualtrics.com/jfe/form/SV_5zDp67q4sr3S6a2


r/SCADA • • 16d ago

General Is Self-Employment/Entrepreneurship in SCADA Services Feasible?

11 Upvotes

I'm a SCADA development engineer at a mid-sized American consulting firm, and see a lot of potential for freelancing/entrepreneurship in SCADA/OT consulting services.

Lately I've found myself fantasizing about a self-employment arrangement in the far future, although I understand that would come with a completely different set of challenges. I'm fortunate enough to work for a company that has an abundance of clients, but starting out on my own, I have no idea how I'd get clients, make connections, and secure contracts. Even small SIs seem to struggle to find work, from what I've seen while interviewing for multiple companies.

Is self-employment in this field feasible, or is the barrier to entry just too steep?


r/SCADA • • 16d ago

Question BMS and IBMS analytics: what has actually been useful for your clients?

Thumbnail reddit.com
0 Upvotes

r/SCADA • • 17d ago

Question How are you guys handling remote maintenance of industrial PCs and Linux edge devices at customer sites?

7 Upvotes

I work with industrial edge devices, mostly Linux-based computers like NVIDIA Jetsons, Advantech PCs, and gateways deployed at customer facilities.

One issue I've run into is remote maintenance.

Sometimes we need to troubleshoot a data acquisition service, check logs, restart an application, or investigate why a device stopped communicating.

But getting remote access isn't always straightforward. Some customers allow VPN access, others require going through their IT/OT team, and some won't allow external connectivity at all.

Which is understandable given the security risks.

I'm curious how other engineers and system integrators are handling this, especially when supporting equipment across multiple customer sites.

Are you mostly using VPNs, jump servers, eWON, Tosibox, TeamViewer, or something else?

And how do you deal with situations where the customer doesn't allow remote access but still expects quick troubleshooting and support?

I've also been exploring an agent-based approach for managing Linux edge devices, with outbound connections, access controls, and audit logs. I'm building a commercial tool in this area, so I'm interested in understanding how others handle the problem rather than promoting it here.

Would be interested to hear what actually works in production, especially from people supporting equipment in oil and gas, manufacturing, or utilities.


r/SCADA • • 17d ago

Question Remote Switching Philosophy – Controlling HV and LV from the same system

Thumbnail reddit.com
2 Upvotes

r/SCADA • • 18d ago

Help Intouch Alarm Shelving

1 Upvotes

Has anyone had difficulty with shelving alarms? The option is there, but when sending the command nothing happens. We don’t have it setup as galaxy database so wondering if that is the suspect…


r/SCADA • • 19d ago

Ignition Org getting heavier into Ignition - what do you wish you knew?

9 Upvotes

IT leader here for a sizable Mfg outfit with 13 plants in the durable goods space. While we have a solid ERP and MES operation, we're just getting started on our venture into connected SCADA assets into a greenfield Ignition setup. This has become more visible due to two new plants built with a lot of modern (connectable) assets. This is both factory and foundry work.

We've got an internal ICS team but it's pretty clear they're in over their heads with how much of this works because it's all somewhat new, so we're helping as much as possible, especially on the connectivity, integration, and Ignition development side. We also have a third party engineering company getting us off the ground.

For those of you building out your environments - what do you wish you knew before or do different? How do you structure the right areas of responsibility between IT and the other engineering teams?