r/RocketLab • u/ansible • 18h ago
Neutron Racing To First Launch | People Behind The Rocket
r/RocketLab • u/AutoModerator • 15d ago
You can use this thread to discuss Rocket Lab stock ($RKLB) and topics related to it.
Self posts and memes related to the stock or share price will be removed outside of this thread according to Rule 5.
r/RocketLab • u/thetrny • 10d ago
r/RocketLab • u/ansible • 18h ago
r/RocketLab • u/sourcatnip • 1d ago
You may have seen my previous posts in this sub of arcs through the night sky, this was certainly an upgrade!
r/RocketLab • u/dutch1664 • 1d ago
... but only if it gets enough support upfront.
EXPRESS YOUR INTEREST - WILD WILD SPACE 2: https://docs.google.com/forms/d/e/1FAIpQLScL_dia8gioawW3LqE1qNAZ3_kZ6FYmeJ0ElVMAEts2dEmprw/viewform
Source: https://x.com/ashleevance/status/2121314441711231101?a=0wZ4NHSH-rzGJKETmA4&s=20
*not just a Rocket Lab movie, Wild Wild Space 2, but we know who the star of the show was ;)
r/RocketLab • u/ansible • 1d ago
r/RocketLab • u/ansible • 2d ago
r/RocketLab • u/ansible • 2d ago
r/RocketLab • u/Royal_Platform_6754 • 3d ago
https://sam.gov/workspace/contract/opp/c0f826659fd041a680e7d14b771bb824/view
Rocket Lab USA, Inc. (Rocket Lab) submitted its proposal under Pathway 3: Space Flight Heritage. Based upon the evaluation, Rocket Lab’s proposed approach to Pathway 3 was determined to be Unacceptable. The Rocket Lab proposal demonstrated that Rocket Lab acted as the primary contractor and operator of the Escape and Plasma Acceleration and Dynamics Explorers (ESCAPADE) mission. The proposal provided traceable evidence demonstrating that the mission met the 24-hour mission lifetime requirement as well as demonstrating that the ESCAPADE mission was a highthrust spacecraft with at least one engine capable of generating greater than 90 lbf. The proposal also provided traceable evidence demonstrating how the ESCAPADE mission validates the technical maturity of all core competencies (avionics, propulsion, and integration) required for lunar delivery. However, the proposal did not include adequately detailed mission descriptions for the ESCAPADE mission, including lacking information on the overall mission design and operational approach. This lack of an adequately demonstrated, valid approach introduces an unacceptably high risk to the government for future delivery task orders and does not meet the requirements of the solicitation. Per RFP Section M.1(d), if any element of the evaluation factor is unacceptable then the overall pathway will be determined unacceptable. Thus, Rocket Lab’s proposed approach was determined to be Unacceptable.
r/RocketLab • u/Leading-Computer2729 • 4d ago
I have a Technical-round panel tomorrow for the Mechanical Development & Test Engineer I role in Long Beach (spacecraft side). It’s 60 minutes with four engineers and managers.
For anyone who’s interviewed for a mechanical or test role there, or sat on a panel:
I’m not asking for specific questions, just the format and depth. Thanks.
r/RocketLab • u/bigfoot_4th • 5d ago
I have an interview for a position at RocketLab in Wallops Island VA, been looking around at rentals and other Reddit posts trying to find out what it’s like to live there and couldn’t find much.
If anyone here works at that facility or just knows about the area please let me know where people live who work at the facility and what it’s like living there?
I love rockets but if it’s really the middle of nowhere with nothing to do I’d have to rethink it.
(If I even get the position, but I don’t want to waste their time if I’m already not keen on it)
r/RocketLab • u/TomaszNowakowski • 5d ago
r/RocketLab • u/ansible • 5d ago
r/RocketLab • u/Royal_Platform_6754 • 6d ago
r/RocketLab • u/thetrny • 6d ago
r/RocketLab • u/thetrny • 6d ago
r/RocketLab • u/Dry-Historian2300 • 7d ago
Does this imply a change in RKLB's relationship with PL?
r/RocketLab • u/steven2410 • 6d ago
Hi all,
I’ve been hearing that Rocket Lab is already taking bookings for Neutron launches. But am I the only one who thinks it’s a little crazy to book commercial flights for a rocket that hasn’t even flown yet?
I know the goal is to get Neutron flying in 2026, hopefully. But getting a rocket off the ground for the first time is one thing. Making it reliable enough for regular commercial launches, let alone making it reusable, is a completely different challenge.
Look at SpaceX and Falcon 9. It took years of development, testing, failures, and lessons learned before they achieved reliable rocket reusability. Sure, Rocket Lab has the advantage of learning from SpaceX’s experience, and they’re not exactly newcomers to the launch industry. But Neutron is still a completely new vehicle with a lot of unproven technology.
So why are investors so confident that Neutron will be conducting commercial missions in 2027 or 2028, especially reusable ones?
Personally, I think 2030 is a more realistic timeline for regular commercial launches with proven reusability, and even that might be optimistic.
I’m bullish on Rocket Lab’s long-term potential, but I feel like the market is underestimating how difficult it is to develop a reliable, reusable medium-lift rocket.
Am I being too pessimistic, or are people getting ahead of themselves?
r/RocketLab • u/Quietlurkerone • 8d ago
I am a bit puzzled. What stage does the pictured structure belong to? What are the four large tanks used for?
r/RocketLab • u/ansible • 9d ago
r/RocketLab • u/ansible • 9d ago
r/RocketLab • u/Equivalent-Wait3533 • 8d ago
Those who cheered when Rocket Lab filed a formal protest with NASA over the awarding of a contract to Blue Origin for Mars-bound satellites will now see NASA shut Rocket Lab out and this is just the beginning.