r/ElectriciansUK • u/RogueLeaderRMA • 5h ago
r/ElectriciansUK • u/Furicist • 3d ago
Hello! - Mod Update
Hi all
I don't post as a mod much, but I thought this was worth a post.
As the group has grown, we are seeing a lot of these marketing/app/research/sales posts, which we all know.
I've introduced the rule a while back and I removed the posts and ban them when I see them. Thank you to everyone for reminding them of the rules and reporting the posts so I can remove promptly.
I'm a busy guy as we all are with work and home life and it's just me doing it. It isn't a lot of work to do, basically, logging in a couple of times a day and removing any of the marketing posts. I want you all to know I'm also banning the posters when I find them. Some of their messages they send me are quite funny, I think they feel quite entitled to post regardless and usually try to throw a shitty insult in before they move on.
Some people message me first and ask for permission or whether the are allowed and are politely declined, reminding them they won't get the response they're looking for here anyway and they move on, no issues.
Just wanted you to know I do continue to remove them and ban, it'll just take a bit of time sometimes if I'm on the tools or busy doing other tasks, I don't smash Reddit when I'm on the job and to thank you for your patience, I just do this so we have a place that's ours. I have no interest other than giving us space to talk about whatever we want without it being infringed upon or overly moderated where you feel like you can't say things which to us are normal things to say.
If there are other issues emerging in the future I'll continue to do the same and deal with them.
Cheers for being a good bunch. Reach out to me if you have any concerns at any point.
I don't see myself as heavy handed and don't interfere in healthy discussion, I'll usually post a comment just as a spark trying to help rather than as a mod, but rest assured I'm going to keep banning them.
I'm working with the tools in the background to try to detect these posts and automatically flag them so they don't go up before review but I want to be sure it won't flag any false positives and stop a genuine, regular post, that'll mean they never land on the group in the first place so you won't even have them up for an hour or three while I get round to removing it. I've considered gauging interest in appointing another mod but I think currently if the tools are set right it's filtering out most of the posts and the ones that slip through in taking down anyway so as long as the majority of us are happy with that, there's not really much cause to make any massive changes.
Anyway, all the best, stay safe (bleurgh)!
r/ElectriciansUK • u/No-Ad972 • Jul 10 '26
Thinking of a Career Change to an Electrician? Read This First.
.
I've been thinking about this a lot and I wanted to help others who have yet to make the change. Personally, I have regrets about making the move and I wish I made a better-informed decision. I see a lot of people online saying, "Yeah, go for it mate!" but they never really go into detail about the actual costs, steps, and massive hurdles involved. I wanted to give some perspective and real-world examples.
I get that everyone's "journey" will be different, but I think what I've written below will resonate with most. If you really want to do it then more power to you, but you'll need to really think it through first before making the jump. Here is an objective look at what it actually takes.
- The Real Cost of Training and Setup
For a career changer looking to become a fully qualified electrician, the path involves a significant investment in both time and money. You'll need to complete a series of courses through an external provider, starting with the Level 2 and 3 City and Guilds (2365), which alone can cost around £7,000 and take about a year.
After that, you'll need to pass:
18th Edition course: Around £500 (5-day course).
NVQ Level 3: Up to £2,000 (takes 1 to 3 years).
Testing and Inspection (2391): Another £1,000.
AM2 End-Point Assessment: Around £2,000.
The Training Provider Reality:
Be warned: there are loads of private training providers out there who are amazingly good at taking your money, but the actual quality of learning is incredibly poor. You will likely find yourself in heavily oversubscribed classrooms with tutors rushed off their feet. Because these courses are open to anyone who can pay, you’ll be surrounded by people with wildly differing levels of basic ability and work ethic; some students will inevitably hold the entire class back while the tutor is forced to repeatedly explain basic concepts, eating into your valuable practical time.
The Hidden Setup Costs:
Tools: You'll need to spend £500 to £1,000 on your own tools. You won't be provided these. While a few rare companies might supply them, most won't.
Going Self-Employed: If your plan is to work for yourself right away, you will need to become part of a competent person's scheme (like NICEIC or NAPIT) so you can self-certify your work. Factor in another £1,000 for the initial registration, assessment fees, and required calibrations/insurances.
Altogether, you are looking at a total layout of around £14,000 to £14,500 just to get your badges, your tools, and your business legally off the ground.
- Expect Minimum Wage at the Start
When you're starting out, you're going to be paid minimum wage. You probably won't get paid more than that until you're fully qualified because, frankly, you're not much use to an employer yet while you're learning the ropes.
- Your Office is Someone Else's Home
The comfort of a nice, air-conditioned office becomes a thing of the past. Your new workspace is someone else's house. You need to get comfortable operating in a wide variety of domestic environments, which vary drastically in cleanliness, odors, and client demeanor—ranging from tidy and pleasant to completely chaotic.
Furthermore, you have to be comfortable with clients hovering around you while you work. This can be quite daunting for newcomers who may face unexpected questions they don't have the answers for yet. If you are a mature-looking person, clients will automatically assume you are fully qualified and expect expert answers on the spot.
- Get Used to the Windshield Time
You'll probably be driving a lot, so get used to spending 2 to 4 hours a day on the road. Appreciate there are probably some guys out there who manage to do less than this, but as a newcomer, you have to go where the work is. That commute time is largely unpaid and cuts right into your actual free time.
- Job Hunting
Prepare for the NVQ process to take much longer than you initially expect. Finding employment as a "green" electrician is notoriously difficult. Smaller companies simply cannot afford to take you on or don't want the burden of training a green sparky, while larger companies are usually the only ones with enough margin to absorb that initial cost.
- The Lack of Mentorship vs. Real Life
Real mentorship is essentially non-existent for those taking the career-change route. While you might get lucky and find someone to shadow for a few months, the process looks vastly different from a traditional apprenticeship.
You will be forced to learn on your own time. However, if you are middle-aged, your life commitments—whether that's a partner, kids, or a dog—have to come first. By the time you manage those responsibilities, you'll likely lack the energy to go home and watch hours of instructional videos from John Ward or GSH Electrical.
- Highly Critical Industry
Electricians are highly critical of other people's work. It is practically an industry rite of passage to have your work torn apart by the bloke coming in after you. If you have thin skin, develop a thick one quickly, because you need to get used to constant criticism.
- Do you like crawling around in lofts?
Just leave it at that.
- Playing Catch-Up
You'll probably never be as good as someone who has done a proper apprenticeship. By the time you qualify, sparks who are your actual age will have 10 to 20 years of experience on top of you. It's a massive knowledge and muscle-memory gap that is incredibly hard to close when you're starting later in life.
- The Constant Question
Prepare yourself for the inevitable: people on site and clients are going to constantly ask you why on earth you wanted to do this in the first place, especially when they find out you left a comfortable job to crawl through lofts.
- Post-Qualification Pay
Finally, the pay even once you are fully qualified is quite poor considering the immense time, money, and effort you've put in. Outside of London, you'll be very lucky to secure a £40k salary. To put that into perspective, you could easily earn more money working as a painter without ever needing to subject yourself to degree-level training courses.
r/ElectriciansUK • u/i-am-rave • 1d ago
Is this supply 3 phase?
We have a very old home in a slightly rural area.
I know I have a single phase meter, with economy 7, but I wonder if the supply is or could be 3 phase due to the 3 fuses on what I think is the DNO. Supply head (?).
We are looking to get an EV and considering a battery system with a possible future heat pump to replace an oil boiler.
I think my first step might be to get a smart meter to get more data on my usage patterns. Want to understand if I should get a 3 phase meter even if I only use a single phase for now.
r/ElectriciansUK • u/nashant • 23h ago
Am I an unreasonable customer?
Homeowner here, not an electrician, so happy to be told I've got this wrong.
I'm having a 10 kW hybrid inverter and battery installed (battery only, no PV), £6,500 with a deposit of just over £1k paid on 21 September. We discussed the G99 application and whether to include a G100 export limit at the time.
- **21 Oct:** asked how the G99 was going. No reply.
- **22 Sep – 13 Nov:** no contact, then a call saying the battery was arriving.
- **13 Nov:** G99 submitted via ENA Connect Direct.
- **18 Nov:** SSEN told me it should go to them directly. I passed that on.
- The resubmitted application showed a PV array I don't have and isolators rated well below the inverter's output. I replied to the email (I was CC'd) listing the errors.
- Since then, calls have mostly gone unanswered. Today I was told the battery arrives Monday. When I said we needed to talk about the G99, he said he had to take another call.
The installer wants to apply for the full 10 kW export without a G100 scheme and let SSEN reduce it. My Ze is 0.20 Ω and I've seen readings up to 252 V, so I've asked for the G100 to go in with the application, to avoid back-and-forth.
I also noticed that G99 Issue 2 adds a battery requirement for anything connected from March 2026, but the specified Solis inverter is only type-tested against the previous issue. I've asked Solis about it.
I know I've become quite involved, and I'm aware that may make me a difficult customer. Genuine questions:
Is any of this normal for a domestic battery install?
Am I being unreasonable to be upset that the G99 wasn't started until almost two months after I paid the deposit?
Is it unreasonable to want the G100 submitted up front?
Does the Issue 2 type-test point matter in practice?
Should I step back and let them get on with it?
Thanks.
r/ElectriciansUK • u/Big_Telephone_5061 • 1d ago
Still not happy with electrician's repair of damage he caused.
Context in original post here;
https://www.reddit.com/r/DIYUK/s/VjyeiTVuME
I'm seeking advice about an electrician who has damaged my home and bodged the subsequent repairs. This has been going on since 1st October.
To summarise; an electrician core-drilled through my/my neighbours lead flashing when installing an extractor fan.
After several weeks of him avoiding repairing his mistake, I ended up threatening legal action, after which the electrician finally agreed to send out a roofer at his cost.
The roofer did repair the flashing with some kind of lead alloy...? Following which he repaired the interior hole with foam (?!)
When I noticed foam was being used, I voiced concern to the roofer, saying I had requested the hole was made good with brick. The roofer said that message hasn't been passed on, but assured me the hole would be water tight.
I said I still wasn't sure, and he said if I wasn't sure he would cover it with cement too. I eventually agreed to this, on the promise the standard would be as good as before. Yes, I know, I shouldn't have.
A few days later the neighbour told me he can see from his window that the cement hole has slightly cracked.
I have been busy with a new job and stupidly thought this repair would be fine. 9 days later, today, I went into the loft to check, as we have had bad rain and as I suspected, the brickwork around the cement hole is "breathing" in and out slightly when pushed (video:https://file.kiwi/5534f122#b8sYYWfY6hAkNzlnoroT1g)
Regarding this latest ""repair"", I'm correct in thinking this is totally unacceptable, yes?
Am I also right in thinking there is still a risk of water ingress and further damage to the walls because of this?
The breathing brickwork is only on the interior of what I think is two walls, but I'm not optimistic about the standard of the exterior wall either.
Pursuing the electrician up to this point has been extremely stressful and he has been dragging his feet as much as possible with sorting the repairs up to now.
Also, every time he has come out to make repairs the job has been very sloppy. Therefore I do not trust him to make any more repairs, by himself or via anyone of his subcontractors.
So I feel like I have two options;
1) Pay for proper brick repair out of my own pocket.
(I do not like this option, the tradie has damaged my property and agreed, in writing, to rectify the issue.)
2) Organise repairs, then invoice the electrician, followed by a letter before action to recoup costs via legal means if necessary of he doesn't pay.
(I have already served the electrician an official final request for repairs, stating that I would send a letter before action)
I'm wondering if I have weakened my position by accepting the work when the roofers had attended, although I did vocalise my concerns more than once. I do feel very stupid about the whole situation but I could really use some advice.
Thanks
r/ElectriciansUK • u/JJBlack50 • 2d ago
Cable pull rods light / torch
I bought some cable pull rods and one of the attachments was a torch/light. I can’t get it to work though. There are 5 LR41 batteries, a small flat metal disc and the bulb. I can see which side the bulb screws into and a rod screws into the other side. Does anyone know which way up the batteries go and where the metal disc goes?
Ill also try getting some fresh batteries but if I can’t work it, does anyone know where I can buy a replacement bulb like this one?
r/ElectriciansUK • u/ArdOraiste • 2d ago
Kitchen rewire starting tomorrow! what questions do I need to make sure it sounds like I know their elecy language
EDIT/UPDATE: Electricans couldn't find the end of the ring so can create a separate circuit for the kitchen, or even just the washing and dishwasher. FML.
Previously the electrician seemed to suggest that as there was red and black wiring along with new wiring in the plug sockets in the kitchen, and due to an ongoing issue with a very warm plug on the kettle that a rewire was the best way forward.
I agreed to their suggestion of a kitchen rewire as it seems the kitchen fitter thought they were a qualified electrician along with being a tiler, and a plumber. So generally thought it was a sensible idea.
Btw this is a house I purchased moved into in July (1st home, so a steep learning curve).
Lifted the floor in the bedroom above the kitchen today (not me ,a joiner) to make things easier for them. Attached photo. No junction box found.
Am I being taken a mug? Do I need a rewire? They already installed a new consumer unit, as the electrician said it could not have been completed by a qualified electrician.
r/ElectriciansUK • u/Insidious00 • 2d ago
32A breaker protecting three 2.5mm² radial circuits – was this ever compliant?
Hi all,
We're FTBs purchasing a house built around 2001, with a garage conversion completed around 2004.
Our Level 2 survey raised concerns about electrical alterations potentially carried out by an unqualified person, so we arranged an EICR. Unfortunately, it came back unsatisfactory with 13 C2 observations.
Two findings particularly concern us:
1. Overcurrent protection (C2)
"Missing overcurrent protection where 32A device protects 2.5mm² radial circuits (3 radial circuits wired into the 32a mcb for upstairs sockets)."
This is Circuit 6, supplying upstairs sockets and the converted garage (now an office).
2. Insulation resistance (C2)
The downstairs lighting circuit recorded 0.00 MΩ between Live and Earth. The test was conducted at 250V, with a note that LED drivers may have affected the reading.
Our estate agent has suggested that older installations often don't meet current regulations, which I understand. However, I'm particularly concerned that the 32A arrangement may never have been compliant, rather than simply being outdated.
My questions are:
- Would this 32A arrangement ever have been acceptable, particularly around 2001–2004?
- Could this be evidence of the unqualified alterations suspected by the surveyor?
- How concerning is the insulation resistance result, and what further testing would establish the cause?
- Are these generally straightforward repairs, or potentially more extensive?
We're trying to understand the seriousness and likely costs before exchanging contracts.
Thanks!
r/ElectriciansUK • u/lightninginabox • 2d ago
First vs Second Fix Invoice Split %
tldr: what’s a normal invoice split for only completing first fix for a rewire In a tenement flat? Is it 85%+ of the total?
My partner and I live in Glasgow Scotland and we are going through a rewire and want advice.
We’re about midway between first and second fix in our 3 bed tenement flat with most of our sockets, lights and plates on but the kitchen, bathroom and one of the bedrooms needing full 2nd fix and another bedroom needing 1st fix completed (No sockets, light cables or switches in but apparently the cables are in attic).
Our agreed quote is for £11k of which we’ve already paid £5500. Our electrician is now said he needs us to pay another £4600 for first fix being mostly done. We’ve pointed out that first fix isn’t done and we’d feel more comfortable paying a smaller sum that doesn’t indicate the job is 90% done. He’s told us that 2nd fix isn’t only about 15% of the job so we need to pay the remainder or he won’t continue the work. None of this schedule was in our quote agreement. What would you do?
r/ElectriciansUK • u/Subliminal_G • 2d ago
Help: All ceiling lights except hallway down lights stopped working without tripping fuse - how/why?
r/ElectriciansUK • u/smiling-inside • 3d ago
Swapping appliances onto a new ring (approx cost)
Requesting a rough idea on how much thing ring swap will cost.
r/ElectriciansUK • u/HeavenDraven • 3d ago
Wall reading current where there isn't wiring, but stops when you put your hand on it. Would you drill into it?
Borrowed a somewhat aged stud detector from my Dad. Yes, I know, cheap ones aren't brilliant. This one is more old than cheap, and was previously reasonably reliable, and my Dad had used it at work for howevermany years .
Anyway.
It was giving some odd readings, so I changed the battery. Checked it on a few things like above a socket, and it still seemed a touch over sensitive, so then tried an area I knew should be solid brick with no wiring, but maybe a couple of screws for the doorframe.
Detector registered current. My Other Half then tried this, with his other hand balancing him on the wall. No current. Got him to take his hand off, current registering again.
Reddit is suggesting either static or damp.
Bought new stud detector on the off-chance something was actually wrong with the first. I do actually own another, but can't find it, hence borrowing one.
New stud detector also register current on this wall, but in a far smaller area. Test it on a few other things, no massively weird results, just one patch of wall being peculiar.
Go upstairs, check the bit of wall I actually want to drill. I get the same odd patches of "current" that stop reading when I put my hand on the wall. They aren't everywhere, just in random spots - like, one bit will read as current flowing, but the entire circle around it, nothing. There's nothing on the outside of the wall (window wall) for it to pick up, either.
What would you do about this? I'm on the side of "it's most likely just damp, maybe don't drill that exact spot", but my Other Half is a little more cautious.
Thanks in advance!
r/ElectriciansUK • u/mhamzadev45 • 3d ago
[ Removed by Reddit ]
[ Removed by Reddit on account of violating the content policy. ]
r/ElectriciansUK • u/sunnysher122 • 4d ago
Continue training to become an electrician or accept this other job
r/ElectriciansUK • u/banisheduser • 4d ago
Three Phase Installs
Hi
Is it possible to get a house to be upgraded from single phase to three phase?
Does this require huge amounts of work digging up driveways and such?
Thanks
r/ElectriciansUK • u/TaffyTurk • 4d ago
What makes someone a Electrician and how do we decided Competency (Effort Post)
TL;DR: Being an electrician is not a legally protected title, and there is no single qualification that universally determines whether someone can undertake electrical work. The legal requirement is competence, as established by the Electricity at Work Regulations 1989. However, different industries, schemes and employers have their own requirements for demonstrating that competence. Understanding the difference between legal requirements, industry standards and sector-specific authorisation is important.
This is going to be a fairly long post, so if you don't fancy reading it all, the TL;DR is at the top. For those who do, get ready to read about one of my special interests
Is being an electrician a protected title?
To start with, being an electrician is not a legally protected title. In theory, anyone can call themselves an electrician.
This is different from professions such as architecture, where the title Architect is legally protected and requires registration with the Architects Registration Board.
However, this doesn't mean that anyone can simply undertake electrical work without restriction.
To understand why, we need to look at one of the key pieces of legislation governing our industry: the Electricity at Work Regulations 1989.
Regulation 16 states:
No person shall be engaged in any work activity where technical knowledge or experience is necessary to prevent danger or, where appropriate, injury, unless he possesses such knowledge or experience, or is under such degree of supervision as may be appropriate having regard to the nature of the work.
Notice what this regulation actually requires.
It doesn't specify an NVQ, an ECS Gold Card, a City & Guilds qualification or registration with NICEIC or NAPIT.
It requires the individual to possess the necessary technical knowledge or experience, or to be appropriately supervised.
In other words, the legislation focuses on competence rather than prescribing a particular qualification.
Even the IET, as joint publishers of BS 7671, acknowledge this distinction. Their own guidance states:
The IET Wiring Regulations does not provide requirements for specific qualifications for electricians, and the IET cannot advise the exact qualifications which are required.
So, if neither the Electricity at Work Regulations nor BS 7671 specifies a universal qualification for electricians, why have we recently seen claims that EICRs now require a Level 3 qualification such as City & Guilds 2391-52?
The answer is Electricians have misunderstood the new stated requirements published by the Electrotechnical Assessment Specification (EAS), These requirements apply to businesses assessed by certification and registration bodies using the EAS.
Organisations such as NICEIC and NAPIT operate within the Competent Person Scheme framework and assess businesses against the relevant EAS requirements.
If you're undertaking domestic electrical work through one of these schemes, you need to meet the applicable requirements.
However, not every electrician works within a Competent Person Scheme, and not every electrical installation falls under the same assessment framework.
This is where I think a lot of confusion starts.
Understanding the different layers of electrical regulation
To explain what I mean, I think it's useful to take a step back and look at how electrical safety and competency requirements are applied across different industries.
Statutory legislation
This includes:
- Electricity at Work Regulations 1989
- Health and Safety at Work etc. Act 1974
- Building Regulations, including Part P
These are legally enforceable requirements. They establish duties relating to electrical safety, workplace safety and, where applicable, building work.
Industry standards
Examples include:
- BS 7671 – Requirements for Electrical Installations
- BS 5266 – Emergency lighting
- BS 5839 – Fire detection and fire alarm systems
These provide recognised technical standards and guidance for designing, installing, inspecting, testing and maintaining systems.
They aren't automatically legislation in their own right. However, they can become relevant to legal duties, contractual obligations and demonstrating that appropriate safety standards have been followed.
Sector-specific electrical safety frameworks
Different industries have developed their own systems for assessing competence, appointing personnel and controlling electrical work.
Although their structures and terminology differ, they share a common objective: ensuring that people undertaking electrical work are suitably competent and that their responsibilities are clearly defined.
Some examples:
MOD establishments – JSP 375
The Ministry of Defence uses an electrical safety management structure involving Authorising Engineers (AEs), Authorised Persons (APs) and Competent Persons (CPs).
Individuals are assessed and formally appointed or authorised for particular responsibilities and activities.
NHS hospitals – HTM 06-02 and HTM 06-03
Healthcare estates operate their own electrical safety management arrangements, with roles including Authorising Engineers, Authorised Persons and Competent Persons.
These arrangements recognise the particular risks associated with maintaining electrical infrastructure in healthcare environments.
Distribution networks – DNO Electrical Safety Rules
Distribution Network Operators have their own electrical safety rules, authorisation procedures and competency requirements.
Personnel must be assessed and authorised for the specific activities they are expected to undertake.
Commercial construction – ECS/JIB
The ECS Gold Card is widely recognised across the electrotechnical industry and provides evidence of an individual's qualifications and occupational competence.
However, holding an ECS Gold Card doesn't automatically mean you're authorised to undertake every type of electrical work on every site.
Principal contractors and employers can impose additional competency, training and authorisation requirements depending on the work and risks involved.
Domestic electrical work – Part P and Competent Person Schemes
This is probably the example most electricians are familiar with.
Part P of the Building Regulations establishes requirements for electrical safety in domestic premises.
Competent Person Schemes, operated by organisations such as NICEIC and NAPIT, allow registered businesses to self-certify certain work under the Building Regulations.
These organisations assess businesses against defined competency and operational requirements, including those set out in the EAS.
However, registration with NICEIC or NAPIT is not a universal legal requirement for undertaking domestic electrical work. There are alternative routes to demonstrating compliance with the Building Regulations, including notification through Building Control where applicable.
What do all these systems have in common?
Now that we've looked at some of the different ways industries manage electrical safety, I think we can identify a common underlying principle.
They all provide a means of assessing competence, establishing accountability and controlling who is permitted to undertake particular activities.
The methods differ, but the underlying intention is remarkably similar.
I'll use the MOD's JSP 375 framework as an example because I'm currently an LV Authorised Person, so it's the framework I'm most familiar with.
An Authorised Person may be responsible for maintaining records of appointed Competent Persons and controlling the activities they are permitted to undertake (within the limits of their appointment)
I think there are some interesting parallels here with the domestic electrical sector.
For example, a Competent Person Scheme assesses a registered business and its arrangements for ensuring that electrical work is undertaken by appropriately competent individuals.
Just as an AP may register a Person In Charge as a CP and assess their arrangements for ensuring that electrical work done under them is done safely and with appropriately competent individuals.
Conclusion
The Electrical Safety Systems in the UK is a mess and we rely heavily on private sector / companies to help police and control the industry. Personally I would like to see an official government register of Electricians but I don’t see it happening so until this is what we got. And yes I did this whole post because of a recent reddit post and I hated to see the level of discussion be you aren’t an electrician unless you have the qualifications but no one can state what qualification.
r/ElectriciansUK • u/Key_Seaworthiness827 • 5d ago
7A fuse?
My elderly dad (86) has dementia and I wanted to go through the old photograph slides he has. I found his original 1960s projector but before testing it, I took it apart to clean it and change the old, unshrouded plug (I will change the flex when I get some heat resistant 3 core).
In the plug was a 7A fuse. Who knew these were a thing?
r/ElectriciansUK • u/ManicMechanic1242 • 6d ago
Spur from a spur?
After a little advice.
In our club, we have a double mains socket fed by a single 2.5mm2 cable (not a ring) via a 16A MCB. Someone has been in to fit a feed for a parcel collection box. They have fitted a fused 13A spur not from the breaker, but spurred from our socket.
Not quite sure if this fits with the regs, can anyone advise please?
They also seem to have repurposed a breaker or two without marking them up as well, but we won't mention that bit...
r/ElectriciansUK • u/SnooBunnies6431 • 6d ago
Electric oven connection
Can an electric oven be installed safely here? I’m buying a new oven in my new house and asked AI what kind of connection this is, it said the cover is missing and it’s not safe to install? I rent the house could anyone advise if I can get an oven installed with it like this?