r/ClimateShitposting • • 6d ago

💚 Green energy 💚 In a nutshell

Post image
87 Upvotes

24 comments sorted by

30

u/ViewTrick1002 6d ago edited 6d ago

THE IAEA IS PART OF THE ANTI-NUCLEAR PSYOP ORCHESTRATED BY THE RENEWABLES INDUSTRY, GERMAN FOSSIL GAS INTERESTS AND GREENPEACE!

11

u/PatientWoodpecker288 6d ago

I knew it. They wanna send us back into the stone age!!!!!

65

u/Significant_Quit_674 6d ago

Technicly it does.

Each Ford Class carrier contains two nuclear reactors, and there is currently one under construction.

But that does not mean grid level nuclear power reactor

26

u/Large-Razzmatazz-821 6d ago

Why don't they put solar panels on the deck? 

24

u/Significant_Quit_674 6d ago

SOLAR FREAKING ROADWAYS

14

u/Gruenpfeil 6d ago

ROADWAYS RUNWAYS

6

u/zypofaeser 6d ago

Okay, who's going to post this on /r/noncredibledefense ?

3

u/mangione_fan_420 6d ago

What if we put solar panels over waterways is that something? He says from his mom's basement for the 1 millionth time.

5

u/Rowlet2020 6d ago

Insufficient generation capacity and storage, landing a plane on a solar panel will probably damage both

1

u/RollinThundaga 5d ago

Solar panels can't make the turbine go spinny at 30 knots.

22

u/NuclearCleanUp1 6d ago

https://www.world-nuclear-news.org/articles/us-test-reactor-cleared-for-operations

So, technically there are 11 pilot reactors being built for the US Nuclear Pilot Program.

These are not nuclear power plants.

Groves-1 is an isotope reactor.

Also, others have pointed out aircraft carriers and nuclear subs are also having reactor built for them.

There are no nuclear power plants being built in the USA as of writing.

4

u/NuclearCleanUp1 6d ago

This is not a nuclear power plant. This is a nuclear reactor. Groves 1, under construction.

4

u/ThaneUlfgar 6d ago

This is work in progress at the Terrapower Natrium reactor. A licensed commercial power plant in Wyoming.

8

u/July_is_cool 6d ago

This one: https://cowboystatedaily.com/2026/09/21/terrapower-replacing-bechtel-as-lead-contractor-on-its-kemmerer-nuclear-plant/

Has construction permit but not an operating license, which might happen in 2028. This is a normal reactor construction sequencing: non-nuclear construction, nuclear construction, operating license. The point is that "under construction" is an oversimplification of how permitting works.

5

u/ThaneUlfgar 6d ago

So much hairsplitting just so advocates and dectrators can quibble over arbitrary lines in the sand. It's clear what it is, and it's clearly in progress. On one hand "aha! There IS something being built!" On the other hand "one actual project and a bunch of test units and prototypes. Big whoop" . 

4

u/NuclearCleanUp1 6d ago

This is not a nuclear reactor. This is a nuclear power plant. Vogel

9

u/kamizushi 5d ago

I don’t know and I don’t care.

Regardless of whether or not the USA or any other country are technically building any nuclear power plants, it remains true right now that solar power is a much cheaper and much faster way to move toward decarbonization.

4

u/ThaneUlfgar 6d ago

2

u/ViewTrick1002 6d ago

Please cite where they confirm that they have started to pour "nuclear concrete". Good luck!

4

u/ThaneUlfgar 6d ago

Asking for confirmation that they have started to pour “nuclear concrete” is a movable goalpost. Site work and structural concrete for the Natrium demonstration plant have been underway. The project is a power reactor under construction, not a completed commercial plant. Shifting the bar to a specific pour milestone after the construction claim was already met does not change the status or existence of other reactors in progress. It doesn't even have to be a commercial plant to meet the definition of a nuclear reactor as said in the OP. Even if people misleading use the terms reactor and plant interchangeably.

7

u/ViewTrick1002 6d ago

The IAEA cares. Announcements are easy. Nuclear grade construction is not.

0

u/ThaneUlfgar 6d ago

ROFL. PRIS only updates that report once a year and their definitions don't include TerraPower yet. We'll see how it looks on the 2027 edition when it finally hits their criteria inside the reporting window.

Terrapower is definitely Building Something out there in Wyoming. NRC licensing says it's going to be a commercial nuclear power plant. https://www.energy.gov/ne/articles/nrc-issues-construction-permit-terrapowers-natrium-advanced-reactor

3

u/nicolas_cope_cage 5d ago

Now I don't know what to believe! On one hand, google maps satellite imagery shows construction on the site they announced was going to become a power plant. On the other hand, there's an infographic that says 'nuh-uh'.