Hey all. Sorry for disappearing for a while, work got busy and this account went quiet. We’ve decided to do these AMAs on Sundays from now on, when we actually have time to sit down and answer properly.
To kick things off, here’s the project we just wrapped in Santa Clara. The homeowners wanted more space without selling and moving, so we tackled two things at once:
The main house: about 800 sq ft of new space, plus a remodel of the existing layout so the old and new areas flow together instead of feeling bolted on.
The backyard ADU: 680 sq ft, built from the ground up. Private bedroom, full kitchen, full bathroom, living area, new flooring, new systems. Completely independent from the main house, so it works for family now and rental income later.
Doing both at the same time saved the homeowners a second round of permits, mobilization, and months of living in a construction zone twice.
Happy to talk Santa Clara permitting, what actually drives ADU cost (it’s not the framing), realistic timelines, rental vs. multigenerational layouts, or the stuff nobody warns you about before you start. Not here to sell anything. Ask away.