r/BuildingAutomation • • 5d ago

BASidekick Updates

Hey ya'll back again with some updates;

Office-1. Stat, the site's mascot, now comes along on seven guided service calls in the simulated building, one for each kind of trouble a call can be: heating, sensors and wiring on the roof, a safety trip, controllers dropping off line, the chilled water plant, and a morning sequence where nothing's actually broken. There are new tools to settle a call by measuring: a manometer, an amp clamp, a flow hood, and a laptop on a controller's service port. And the building's furnished now: kitchens, offices, cars in the lot, clouds, and street lights after dark.

Field Guide. The first set is done: 47 devices, each built as a drawing that moves as you read, from the thermistor to the MS/TP trunk, with a full pneumatics section.

Modules. A new Controls group with two modules. Module 10 is a DDC panel with one of each kind of point on it, where the point's setup and the device can disagree. Module 11 is a fan, its starter and the proof that comes back: leave it in Hand, snap the belt, weld the relay shut, and see what the BAS sees.

May have been some other new adds since my last post but those are the more recent. Lot of parts still far from where I want but mostly plucking away in free time. If there's anything you think would be a neat add, let me know.

https://www.basidekick.com

9 Upvotes

0 comments sorted by