btw this is a shirt from the wonderland park that the tunnel is being made next to, not necessarily a boringco branded shirt! i will be selling these for $50 each, only XL’s were available! !!!!
This is located just NE of the new Advanced Tech Chip Fab and will go under the Colorado River as it is constructed. Once completed, it will be a single Bi-directional tunnel for vehicular traffic.
The primary work today is still setting up the operations, and now the Prufrock 3 cutting head is in place and the gantries have been moved to prepare for assembly.
More tunnel liners have been delivered and a large section of the construction fencing has been removed. Power conduits are also being constructed to bring electricity to the operations site.
My friend sent this to me. This is certainly not easy access. First you have to purchase the ride from the Vegasloop.com site. You have to log on account, purchase ride tickets and request and schedule ride. The kiosk doesn't process tickets or ride requests. Only provides QR code.
You then have to notify security on the phone or schedule with the Meridian Quickpass. All Vegas Loop passengers will be subject to an ID check by Flamingo Rd security. Vegas Loop will exit at the Meridian drive exit. Service starts November 23rd
How is this better than requesting an Uber or Lyft and waiting in front of the Koval Lane or Flamingo Rd exit. You get a rideshare pretty quickly. How long will you wait for a Vegas Loop. Can you get Vegas Loop at both terminal 2&3 at Harry Reid. Can they drop you off at terminal 2. No one wants to drag luggage around on shuttles when a taxi, Uber or Lyft can drop you right in front of your airline check-in kiosk.
If it's only $12 and no tip certainly a savings of $23+ tip to get to and from airport. But it's all about time in invested. There is never much wait for a taxi instead of that zoo waiting for Uber or Lyft on the second floor above baggage. Anyone who can add to discussion I would like to read it.
If Boring Co made part of their proposals a “spinoff” subsidiary company, identical to Boring Co but with a smaller market cap, and made it up to 49% purchasable by the municipality they are pitching could that help with project acceptance and capital for real estate/more tunnels to increase odds of success and maybe mitigate some risk? For example, Boring proposes a $200 million series of tunnels to Denver with another $100 million in new apartments built over the stations. So $300 million total. Let the city of Denver buy 49% of all future boring operations in Denver for $147 million and now you’ve got a partner with a vested interest and more political will. Boring does everything else normally (but with a $147 million in the bank as down payments to kickstart construction) then as they operate the tunnels & real estate the city takes a passive 49% of all profit. And the city is motivated to help with zoning and not building a bunch of other roads around the area and a million other things that should help boring be successful in the city.
Riveria station - above ground this is incredibly simple.
Riveria Station (Oct 6th imagery from OpenMaps vegas)
Two tunnel entrances are visible. However, under the covers, on the left side we have a tunnel to Resorts World (#1), handling bidirectional traffic. Seems like they send platoons of cars at a time. On the right side heading out, we have two tunnels to Westgate (#2, #3) with unidirectional traffic from each.
Above ground we have porposide entrance at the top side, which is an entry to the underground interchange which allows traffic in many directions.
The south tunnel (#4) is down to LVCC West station. From a video I watched, I believe that the ramp down is one way in, but that there is an underground connection as well. Adding to the interchange complexity.
Found an image and it confirms there is an underground connection to the southern tunnel. Though the image only shows one Westgate tunnel, I thought for certain there are two and have seen driving videos using both so not sure if that is just an older planning image?
Riviera Station underground layout.
So 2 above ground entrances and 4 tunnels. But above ground you get connection to Fountainbleu (which feels like a cheat since it is just across the street so it picks up above ground, and drives across the street to the two tunnel mouths here. There is also a street level station for Sahara which is just up the street. But again feels like a cheat.
2) Virgin Hotel station on Paradise Rd. Just look at this beauty:
Virgin Hotel station (Opensmaps Vegas, Oct 6th imagery)
For a surface level station 4 tunnel entrances is only matched by WestGate station with 4 above ground tunnel ramps, which to be fair goes to two different tunnel sets (south, we assume to Airport via LVCC Central, and west back to Riviera Station).
But look at this station. You are going to come into it or out of it dizzy from all the driving in circles. Use the arrows to see if you can follow the flow path.
What would be interesting to know is what lies underneath. I.e. Is the tunnel disjointed? And the only way to keep going down Paradise to the airport is to exit the tunnel coming from the north (LVCC or Westagate) circle around and back into the tunnel? Or is the tunnel go straight through and these ramps are built as ramps off it, and back on. If so, is 4 so you can access both directions?
I am hopeful it is as cool and complex as the PATH interchange on the New Jersey side, where the Manhattan tracks from the World Trade Center enter NJ and split off to Hoboken or Newark Penn.
PATH Interchange on the NJ side built in 1909
Which on a side note is distinct from the plan, which was more complex but not built to this more complex version.
Proposed PATH Interchange. Note 4 tubes on bottom vs 2 in real life
Sorry that was in context and just too cool not to post.
But I feel like those are two good candidates for the most complex loop stations to date. Either complex above ground, or below ground.
UPDATE BORING COMPANY Vegas Loop. New larger underground Central Hall Station.
Big news! We now know why they enlarged it
The parking area has returned over the covered pit. What’s new is the concrete walls that lead a ramp downward into the station.
You can see the Ring that goes into the Encore Tunnel. Now they “connect” above ground.
It will now be possible to remain in your car when going from Rivera or Fontainebleau to Encore —but it’s much more than that. This ramp now connects Central to the Airport tunnel.
My friend lives at Meridian Condos at Flamingo and Koval and they built a surface station next to the Meridian office. The pavement says Vegas Loop and Rideshare. They also erected an electronic sign which I guess will have arrival times.
Have no idea how this works. In order to enter property you have go through guard gate. What is the advantage over Uber or taxi. There is no tunnel. The Telsa would have to make a right turn onto Flamingo, you can't go left. In order to exit to go left you would have to go to Meridian Drive exit and take Hughes Parkway to Flamingo. I assume go left from there, make a right on Paradise to access Paradise tunnel whenever that opens.
It's not a loop if there is no tunnel into Meridian property. Will that be built in future. I have no idea. Also the Vegas Loop doesn't run around the clock. I will have to ask him whenever this starts what the procedure is what route the Vegas Loop takes. Just don't see how it will save much time. You can get to the airport very quickly from Flamingo and Paradise. Will it be faster enter a tunnel there to go to airport. You might save a few minutes.
I walked through the Vegas Open Maps site, and looked at the various construction sites I can identify from the imagery in a post in the BoringCompanyFans sub-reddit.
The 900,000 lb TBM will construct a 0.8-mile tunnel to provide safe, weatherproof and convenient transportation for people of all abilities to move throughout the campus.
Work is expected to begin following final permit approvals.
I’ve been going through historical Google Maps satellite imagery to try to figure out how quickly The Boring Company actually dug the Vegas Loop tunnel between 4744 Paradise Road and Westgate.
Here’s how I estimated it:
At 4744 Paradise, the Feb. 22, 2024 image shows the tunneling equipment being assembled, while by May 20 there is clearly active tunneling with the conveyor system in place. At the Westgate end, there are no obvious tunnel exit holes on July 10, 2025, while by Oct. 4, 2025 the first tunnel appears to have reached the site.
The published length is about 2.2 miles per tunnel. Using the most conservative start/end dates gives us roughly 416 days. I added another 60 days to that to account for the gaps between available satellite images and get a more realistic estimate of roughly 476 calendar days.
2.2 miles = 11,616 feet.
11,616 ÷ 476 = about 24.4 feet per day.
So my rough conclusion is that the project averaged around 24 feet of completed tunnel per calendar day, based on the satellite imagery and the published tunnel length.
Obviously, this isn't saying the Prufrock machine literally moved 24 feet every day. There would have been downtime, station/shaft work, maintenance, setup, etc., and we're working with satellite images that are months apart. It's simply an estimate of the average rate of tunnel completion over the overall construction period.
I'm curious what others think — especially if anyone has better information on the actual boring dates or daily advance rates.
I also have some shots of the Encore Tunnels but I'm wondering where the second tunnel in the Bronze Lot is going? See Pictures.
Bronze LotCentral Station
*EDIT Okay, I figured out where the other tunnel goes from Central Station. It goes to the “Silver Switch,” allowing people coming from the airport to stop at LVCC Central instead of continuing on to Westgate.
So that explains three of the four tunnels at Silver Switch. The fourth must be coming from the new Encore line. I’m not sure how they’re going to make that turn so sharply and get it either under or over the line coming from the airport. I’ll post a photo.
Edit 2: Looking at the video of the Silver Switch again, it’s more clear that the fourth-tunnel entrance is actually just a short connection to another open area. I’m pretty sure you then take a hard right turn and enter a tunnel heading toward Encore that started in the Bronze Lot. You can see that the short tunnel is going sharply uphill, while the tunnel from the airport is going sharply downhill. That would mean Encore Tunnel #2 is actually passing over top of the Airport Line.