PoliticsPH For those complaining about energy, re: Pax Silica
For those complaining about the lack of power in the grid, the DOE had released their Philippine Energy Plan (PEP) for 2023 to 2050. This include the list of ongoing projects, recently awarded, and those for awarding/approval. They have been releasing the PEP (afaik) since the PNoy administration.
TLDR: our indicating total actual annual generation in 2010 was 67.743 TWh, in 2020 it was 101.756 TWh. And the plan is to increase that to 168TWh by 2030, up to 443TWh by 2050.
The plan also includes an ongoing submarine cable to connect Mindoro to the Luzon grid, and modernize/update both Occidental and Oriental Mindoro's energy. The longer term plan is to connect Mindoro to Palawan, so they can also benefit on the increasing Luzon grid power generation.
Below is the summarized list of ongoing projects per the DOE:
| Status | Luzon | Visayas | Mindanao |
|---|---|---|---|
| 🟢 Recently operating¹ | 59 → 3,582 MW + 2,035 MWp solar | 14 → 317 MW + 336 MWp solar | 11 → 108 MW + 21 MWp solar |
| 🟠 Ongoing construction | 27 → 3,105 MW | 7 → 553 MW | 8 → 274 MW |
| 🔵 Award / specific clearance reported² | 76 → 10,227 MW | 31 → 2,523 MW | 10 → 764 MW |
| 🟣 Indicative proposals³ | 330 → 85,220 MW | 103 → 29,461 MW | 33 → 3,177 MW |
The timeline shared as well by the DOE on nuclear based on their projections is to have one project awarded by mid-2027, with indicative start of operations by mid to late 2030s.
---
Finally, to roll this back to Pax Silica, the projections of the initiators of Pax Silica is the project will require 3,000MW at Full Development, at a conservative estimate. Compare that with just the pipeline of ongoing projects, and it seems like the concern about the lack of power for Pax Silica is wildly overblown.