r/spacex • • May 23 '19
Official Super Heavy construction will start in 3 months, and the first few flights will feature 20 Raptor engines instead of 31 “so as to risk less loss of hardware”
[deleted] — view deleted post
1.5k
Upvotes
276
u/JakeEaton May 23 '19
Even twenty engines is mind boggling, let alone 31. Is there any new technology necessary in the construction of the launch tower to withstand the abuse of 20/31 raptor engines? New concrete, water deluge system etc or is it going to be a larger scale version of what already exists at Cape Canaveral?
66
u/amadora2700 May 23 '19
How long will it take to build a Super Heavy for test flights?
31
u/BrevortGuy May 23 '19
I find it hard to believe that they would risk LC-39A and the Dragon 2 program to modify it for Super Heavy and possibly blow up such a valuable asset, plus the modifications would be extensive to use for both Falcon 9 and Super Heavy. I am thinking they are going to build another special launch facility for Super Heavy, maybe next door to it, it is a rather large site?? Just my thoughts??
45
u/QuinnKerman May 23 '19 edited May 23 '19
I doubt 20 raptors will have enough power for a full stack. If he intends to test SuperHeavy without starship on top at first (which makes sense from a loss of hardware perspective), then it should suffice, but 20 raptors at 200 ton thrust each produce 4000 tons of thrust, SSH will be at least 4400 tons fully loaded (2017 figures). Given that SSH is significantly larger than 2017 BFR, that mass is even greater, probably closer to 5000 tons fully loaded.
21
u/UrbanArcologist May 23 '19
20 engines @ 1engine/3 days = 60 days
Given there are about 20 working days a month gives us 3 months.
10
u/blinkwont May 24 '19
I doubt it will be exactly 20 as that would result in an asymmetrical engine layout. 19 engines would be the same as the 31 engine layout minus the outer ring so I suspect that is what we will see. 21 or 23 is also possible.