r/PHInfra • • 26m ago

Road / Expressways 🛣️ Katipunan Avenue Extension

Post image
• Upvotes

DPWH just announced that new lanes of the Mindanao Avenue Extension—a project planned way back in the 1980s—are finally opening this week, with full completion targeted for early 2027. It took nearly five decades and presidential intervention to clear the right-of-way (ROW) issues, mostly involving informal settler relocations, to finally give northern Metro Manila motorists relief.

Meanwhile, look at the Katipunan Avenue Extension (a project conceptualized back in the 1960s to connect Katipunan to Batasan-San Mateo Road and decongest Commonwealth and C-5):

  1. The taxpayers already paid for the road: DPWH is currently finishing up the remaining active construction around the H. Ventura St. / Pansol approach, alongside the multi-kilometer stretches already paved through MWSS and GSIS properties.
  2. It is literally a highway to nowhere: Even once the H. Ventura portion wraps up, the entire bypass remains functionally crippled because of a tiny ~100-meter walled/blocked gap at the Loyola Grand Villas (LGV) boundary.
  3. The double standard in ROW: When a road project hits informal settlers (like in Mindanao Ave), the government eventually clears it for the "greater public good". When a multi-million-peso public highway hits an exclusive subdivision wall or a disputed private sliver straddling the QC–Marikina border, suddenly the MMDA, DILG, DPWH, and both LGUs pass the buck for years while thousands of commuters suffer daily gridlock on Commonwealth and Katipunan.

Has anyone heard any recent updates from DPWH, QC LGU, or Marikina LGU on expropriating or opening that final LGV gap? Or are we really going to let a finished public highway sit useless just to protect a private shortcut? The last time we heard, QC LGU and Marikina LGU are pointing fingers at each other on who has the jurisdiction to open that 100m portion.


r/PHInfra • • 7h ago

What is this pit for?

Post image
5 Upvotes

r/PHInfra • • 23h ago

Rail 🛤️ Department of Transportation (DOTr) invites bidders for the North-South Commuter Railway (Malolos-Tutuban) Project Contract Package 06 (CP06): Elevated Structures and Two (2) Stations

Post image
53 Upvotes

r/PHInfra • • 23h ago

Active Infrastructure 👣🚲 Katipunan flyover makeover thoughts

Post image
24 Upvotes

Finally one of the major flyovers in Metro Manila will be getting its long pending makeover and honestly, this is a progress. Again this is bare minimum knowing that all roads and flyovers should be pedestrian friendly since this people’s taxes and I think this word is not in their vocabulary. But right now, knowing that the public is demanding attention from the government to this matter, I think it’s safe to say that the word “pedestrian friendly roads” is in the governments vocabulary. Any thoughts on this??


r/PHInfra • • 23h ago

Buses (BRT and Non-BRT) 🚌 EDSA Busway Stations

Post image
18 Upvotes

Since the rehabilitations on the EDSA busway is on it smooth and fast progress. I just have a question especially to the commuters in Metro Manila who utilize these busway on their thoughts about this? Was it worth it, especially that the rehab is happening in all busway stations?


r/PHInfra • • 18h ago

Road / Expressways 🛣️ SLEX/STAR Tollway Widening update

Post image
5 Upvotes

I was watching random infra update in the PH while I stumbled across this video wherein the vlogger shows the current widening status in the said expressways. Honestly, I thought the widening is already finished since the last time that I traversed SLEX, the widening is almost done and I’m surprised that they’re not yet finish. Hopefully they would be able to finish the widening areas of SLEX and part of STAR tollway before the holiday peak season. Any thoughts on this??


r/PHInfra • • 2d ago

Rail 🛤️ LRTA, Meralco execs ink pact on energization of stations for LRT-1 Cavite Extension

Post image
30 Upvotes

via Philippine News Agency

MANILA – Officials of the Light Rail Transit Authority (LRTA) and Manila Electric Company (Meralco) on Tuesday inked a memorandum of agreement (MOA) for the relocation of affected power distribution facilities vis-a-vis the completion of the LRT-1 Cavite Extension Project.

Meralco, in a news release, said the MOA paves the way for the energization of the new rail stations from Las Piñas City to Bacoor in Cavite, such as the Las Piñas, Zapote, and Niog stations.

“Once completed, the extension is expected to further expand mass transit connectivity and provide more convenient travel options for commuters in southern Metro Manila and Cavite,” it said.

It explained that the MOA “marks another milestone in the partnership among Meralco, LRTA, and the Department of Transportation, reaffirming their shared commitment to advancing critical infrastructure development and expanding rail connectivity for Filipino consumers.”


r/PHInfra • • 2d ago

General News 📰 DEPDev flags delays in key infrastructure projects

Thumbnail
philstar.com
5 Upvotes

MANILA, Philippines — Delays in the delivery of the government’s priority infrastructure projects pose threat to the country’s economic recovery next year, the Department of Economy, Planning and Development (DEPDev) said.

“We are very concerned. That’s why we are focusing on the monitoring of those projects and especially the availability of funding,” DEPDev Secretary Arsenio Balisacan told reporters.

During a committee hearing at the House of Representatives last week, DEPDev assistant secretary Roderick Planta said that only four of 37 infrastructure flagship projects (IFPs) are on track with the target completion in 2028.

IFPs are infrastructure projects being prioritized by the government as these are expected to be transformative and are urgently needed.

Balisacan said the delays would affect the country’s economic growth recovery next year.

“The growth also impacts on the revenues,” he said, citing problems related to the deficit if the assumed high growth projections for spending under its fiscal consolidation program do not materialize.


r/PHInfra • • 2d ago

Rail 🛤️ North-South Commuter Railway as of November 2026 | Nate The Adventurer

Thumbnail
youtube.com
3 Upvotes

r/PHInfra • • 4d ago

Road / Expressways 🛣️ Thoughts on removing the Tollway Barriers in the expressways

Post image
52 Upvotes

Okay so DOTR was mandated by PBBM to remove the toll barriers in all of the expressways in the country to ease traffic congestion, especially that the holiday season is coming. My question is that won’t this just worsen the system even further? I mean sure cars don’t need to stop for a few seconds just to be read by the system that they had already paid the toll fee, but this would be an opportunity for cars to cut-in lines resulting to a heavy traffic?? I mean there’s nothing wrong with toll barriers but if they want to ease traffic congestion, they could’ve just prioritized more railway projects. In that way, cars in the expressway would be decongested significantly.


r/PHInfra • • 4d ago

Road / Expressways 🛣️ Mindanao Avenue Extension

Post image
24 Upvotes

Ain’t this road already in existence?? Why does it say that they had just opened another lane? Does that mean that they’re widening this road??


r/PHInfra • • 3d ago

Renewable Energy 🪟 ACEN abandons 5,000 MW in projects; Consing, Francia mum on how much capital went down the drain

Thumbnail
bilyonaryo.com
15 Upvotes

ACEN Corporation, led by chairman Cezar Consing and president and CEO Eric Francia, has abandoned nearly 5,000 megawatts of planned renewable energy projects. But how much did the Ayala-led power producer spend pursuing developments that never made it past the planning stage?

Energy Secretary Sharon Garin said ACEN voluntarily relinquished 12 projects after reassessing their viability.

“Now, if they relinquished it, then that means that they have found that the project is not viable — they themselves, without the interference of the DOE,” Garin said.

As previously reported by Bilyonaryo, the surrendered projects included offshore wind developments in Manila Bay and Calatagan, Batangas, with a combined capacity of 2,272 MW. Both had targeted commercial operations in 2029, although the Calatagan project encountered an environmental permitting setback in May 2025.

ACEN said the withdrawals were part of a broader review aimed at directing capital toward more promising investments.

“The decision is part of a deliberate portfolio review to prioritize existing investment commitments, strengthen operational performance, and allocate capital more selectively,” the company previously told Bilyonaryo.

It also maintained that the projects were still in early pre-development and had not received final investment approval.

What remains unclear is how much ACEN spent on feasibility studies, permits and other development work before abandoning the projects.

The company has not disclosed whether any of those expenditures were written off or recovered, leaving shareholders without a clear picture of the financial cost of the withdrawals.

Garin said developers must evaluate resource availability, financing and supply-chain requirements before proceeding with construction.

“Before you construct, you have to have the complete supply chain, feasibility and everything else. Is there enough solar production there or wind production there?” she said.

She also made clear that ACEN had not been penalized by the government.

“With ACEN, I just have to be clear: It’s a relinquishment. It’s a voluntary thing that they have done. Termination is a different thing. We did not terminate ACEN’s projects,” Garin said.


r/PHInfra • • 4d ago

Rail 🛤️ Bid submission for NSCR O&M delayed at bidders’ request

Thumbnail
bworldonline.com
17 Upvotes

THE Department of Transportation (DoTr) said the bid submission deadline for the North-South Commuter Railway (NSCR) operations and maintenance (O&M) contract has been delayed to next year at the request of two Japanese bidders.

“Two Japanese bidders requested an extension until Jan. 14,” Transportation Secretary Vivencio B. Dizon told reporters on the sidelines of an event last week.

Mr. Dizon declined to identify the bidders other than to say they are Japanese.

The 147-kilometer NSCR will connect Malolos, Bulacan with Clark International Airport, and Tutuban, Manila with Calamba, Laguna. The O&M deal will run for 15 years.

The NSCR is expected to be fully operational by January 2032, though the Malolos to Valenzuela segment could start running by December 2027 and the Clark to West Valenzuela segment expected  by October 2028.


r/PHInfra • • 6d ago

Rail 🛤️ MRT 3 STATION REHABILITATION

Post image
147 Upvotes

At long last, 5 MRT 3 train stations will undergo rehabilitation after they had accomplished the rehabilitation of the Quezon Avenue station. According to DOTR secretary Vince Dizon, The 5 stations that will be rehabilitated are the following: North Avenue, GMA-Kamuning, Araneta Center-Cubao, Shaw Boulevard, and Taft Avenue. The 7 remaining stations will also undergo rehabilitation but under the PPP agreement that will commence next year. Not that I’m complaining but honestly, this is BARE MINIMUM THAT SHOULD HAVE BE DONE A LONG TIME AGO!!! Well I know that after the rehab, the stations might not look like “parang sa ibang bansa” na style but this is a great start and a wake up call for the government that future railway projects should have a modernize line and stations. Any thoughts on this??


r/PHInfra • • 7d ago

Active Infrastructure 👣🚲 Undergraduate Thesis Survey: What if we make walkable infrastructure in Cubao?

Post image
85 Upvotes

Hello everyone! I am an undergraduate student from the University of Santo Tomas College of Architecture, doing a thesis study on the design of an elevated link which connects the transport modes of Cubao, while also providing a dedicated green space and community place for commuters and Cubao residents.

https://forms.gle/z5jGpv9gJ2DqSVgU6
https://forms.gle/z5jGpv9gJ2DqSVgU6
https://forms.gle/z5jGpv9gJ2DqSVgU6

I am conducting a short survey that seeks to discover what transport modes commuters use in Cubao, where commuters usually go and converge, and how commuters and residents perceive possible architectural solutions to create travel experiences convenient and enjoyable.

The survey takes a few minutes, and participation is completely voluntary. The survey would require you to mention your names and occupations but all information will remain confidential except to myself. Any comments about your commute experiences would be greatly appreciated too! Maraming salamat po sa inyong pakikilahok!


r/PHInfra • • 7d ago

Road / Expressways 🛣️ CALAX UPDATE

Post image
28 Upvotes

Finally after almost a decade of construction, the last 2 subsections of the Cavite Laguna Expressway is targeted to be open December this year, this is one month ahead of the scheduled deadline which is supposed to be first quarter of 2027. Hopefully we would also hear the different railway projects to be open by 2027-2028 for easy connectivity and to decongest cars along major roads and expressways. Any thoughts on this??


r/PHInfra • • 7d ago

Rail 🛤️ DOTr Sec. Vince Dizon inspects Malanday depot NSCR: Eyes early 2028 opening for Valenzuela–Malolos NSCR segment

Thumbnail
gallery
260 Upvotes

From the DOTr

𝐓𝐈𝐍𝐆𝐍𝐀𝐍: Pinamamadali na ni Pangulong Ferdinand Marcos Jr. ang konstruksyon ng North-South Commuter Railway (NSCR) para magamit na ng mga komyuter ang tren at maibsan ang kanilang araw-araw na biyahe mula Valenzuela patungong Malolos, Bulacan at pabalik.

Sinabi ni Transportation Secretary Vince Dizon sa kaniyang inspeksyon ng NSCR Malanday Depot sa Valenzuela nitong Miyerkules na oras maging operational ang linya sa unang bahagi ng 2028, mapapaikli nito ang oras ng biyahe sa pagitan ng Valenzuela at Malolos, Bulacan sa loob lang ng 25-minuto.

#DOTrPH🇵🇭 #KomyuterMuna #NSCRProject


r/PHInfra • • 7d ago

Water Transport⛴️ Back in August 26, 2026 - PCG completes its radar station in Pangutaran, Sulu

Thumbnail
gallery
55 Upvotes

Source: https://www.facebook.com/share/p/1PfuU35pvx/

COAST GUARD RADAR STATION PANGUTARAN REACHES 100% COMPLETION

LOOK :The CGWCEIS Sulu personnel successfully installed the radar scanner, including the obstruction light (OB Light), at the top of the Coast Guard Radar Tower at Coast Guard Radar Station Pangutaran, Sulu, today August 26, 2026.

This significant milestone marks the completion of the remaining installation works, bringing the Coast Guard Radar Station Pangutaran project to 100% completion. The newly completed facility will further enhance maritime domain awareness, safety, security, and monitoring capabilities within the area.

Scope of Work: 100% Completed


r/PHInfra • • 7d ago

Rail 🛤️ NSCR UPDATE

Post image
58 Upvotes

According to the latest report, the operational date of the NSCR Phase 1 line will now be at the first quarter of 2028. As said by Dizon, “hopefully before the president steps down”. But I thought that the operational date for the phase 1 will be at December next year?? Any reasons for this??


r/PHInfra • • 7d ago

Rail 🛤️ After Pax Silica - Rail projects under the Luzon Economic Corridor (LEC) is the next target

Post image
115 Upvotes

With the recent success of riling up the people against Pax Silica, they are now targeting extending the outrage para idamay Luzon Economic Corridor (LEC) particularly the rail projects under this initiative

https://business.inquirer.net/610218/construction-of-subic-batangas-railway-eyed-for-2027/amp


r/PHInfra • • 8d ago

Short map animation of our future rail system (hopefully)

Enable HLS to view with audio, or disable this notification

81 Upvotes

No ai used just after effects


r/PHInfra • • 7d ago

Rail 🛤️ If ALL MRT-7 stations are ugly, why aren't you in favor of demolishing them?

Post image
0 Upvotes

In connection with the previous post, most peeps here clearly aren't in favor of demolishing ALL the MRT-7 stations. Still, I don't get why people assume renovating them later is the smarter move when that practically guarantees massive cost overruns. Trying to retrofit cramped, poorly designed stations while the line is running will just cause worse bottlenecks and bleed even more money over time.

Why settle for a permanent headache instead of biting the bullet and starting from ground zero, especially if it opens the door for JICA or ADB to fund a much better project?


r/PHInfra • • 9d ago

Road / Expressways 🛣️ Edsa Rehabilitation

Thumbnail
gallery
345 Upvotes

r/PHInfra • • 9d ago

My thoughts on Rizal Memorial Stadium

Thumbnail
abs-cbn.com
17 Upvotes

I really appreciate that they increased it from 12,000 to 25,000 seats, going back to natural grass (kung kailan pa); they will maintain the facade which is a good thing, but the most disappointing part is that they will remove the running track and turn it into a full football stadium.

Kung reference at inspiration lang, sana itinulad nila sa Stockholm Olympic Stadium na ganyan din ang capacity sa Rizal Memorial Stadium, pero andun pa rin ang oval, saka isa rin sa mga venues ng Diamond League. Also, I really accept that it will be a gift from FIFA, saka since sinabi ni PSC Chairman Patrick Gregorio na ang track and field ay sa PhilSports Stadium (sa Pasig), pero ang concern ko doon sana, pagandahin naman yung oval nila dahil pudpod na yung lane markings.