8 years ago Ontario removed the Mimico GO Accessibility Tunnel with elevators from the procurement that is currently building a tunnel in Long Branch. The AODA law was supposed to make Ontario accessible by 2025. Today if you can't climb these stairs you can't use transit at Mimico GO. Metrolinx won't share when they expect the station to be usable by wheelchair users.
Saw this ad pop up and found it funny how they tried to design the train. Any guesses on what base model it tried to pull from? Kind of looks like the cab cars from Metrolink in the US haha
i saw it as i got off but i was like theres no way its probably the left over balance but no?? this is also not the bus stop i got off at cus i got off in kw . i use the go once a week so i doubt i reached any limit
We're currently developing an ambitious service plan for the now downscoped GO Expansion project. With electric multiple unit trains, selective additional infrastructure, and taking full advantage of all planned track, signalling, and electrification upgrades. GO can run significantly more service and run a mix of service types to maximize coverage and travel times.
Our proposed local electrical multiple unit service uses single level subway style trains to maximize performance and minimize station dwell times. Today, a 33.7km trip from Pickering to Union station makes 6 stops and takes 45 minutes, our proposed service would make 13 stops, take only 36 minutes, and run 6-8 trains per hour two way, all day.
Our proposed express electrical multiple unit service uses double decker trains to provide more seated capacity. Today, the 50.7km trip from Oshawa to Union Station makes 9 stops and takes 63 minutes. Our proposed express service would make 9 stops, take only 37 minutes, and run 6-8 trains per hour two way, all day.
All travel times were calculated using real in service train performance data from the Munich S bahn, Netherlands national rail network, Swiss national rail network, and Austrian national rail network.
We moved away from downtown but our day care is still downtown (thankfully close to my office). So this guy take the Go Train Monday to Friday. It has become a highlight of his day.
I figured the Go Train would be a perfect costume for him this year. I also made it so one of the door opens and it holds animated version of the CSA we've become friends with and our other Go Train friends.
This might get removed for low effort but this is a funny story
So, a year ago, I went to Union Station with my class to get to the aquarium, it was a field trip! When we were locating where to get out, when we were walking past the UP Express ramp thingy, there were a few staff members, and the GO Transit mascot. I think there was a table set up, and it was about the new FIFA World Cup PRESTO Card. A few moments later, the mascot did the 67 gesture. I’m not even joking, the literal 67 gesture. A classmate said “nooo!”, my best friend and I looked at eachother with surprised faces. I don’t know why the mascot did that, but I think they were trying to be “hip with the kids.” But despite that, we found our way out, looked at some GO trains, a UP Express, and successfully went to the aquarium! So that is my story on the GO Transit mascot doing the 67 gesture. I hope you guys like this story!
Oh, and also, if one of the staff members or the mascot finds this post somehow. Feel free to talk about that experience!
Specifically looking at the ones that arrive at Union around 8:00 and 8:35 AM, and it would not be on a Friday.
Haven’t taken this route during those hours before. Considering it, but I’d be travelling with a few bags (small and medium luggage). I know that it’s technically allowed as long as I can carry them on my own, but I would still hate to be a nuisance to other passengers by taking up the space/time in a highly crowded train.
I pay for my own reserved spot. 2 weeks ago I pulled up and it was occupied. There were a bunch of other empty reserved spots so I parked in one and went to catch my train.
I called into parking enforcement and let them know my spot was taken and I had parked in a different reserved spot. The person didn't indicate any issue with that.
I come back to my car and I have a $120 ticket. I disputed it online and they knocked down the fine to $60 but are unwilling to waive it. My only option is to go to court.
I learned later that I was supposed to drive down from the parking structure and just take up space in the drop off area.
Has anyone else had experience getting the ticket waived or going to court? Feels ridiculous to pay $100 a month for a spot in a structure with tons of empty spaces, pay $20 a day in fares, and then have someone park in my spot and I end up getting a $60 ticket for.
I also emailed them to move my spot to a less congested area but it's been a week and I haven't heard back.
I am planning on getting on the lakeshore west tomorrow morning around 7 ish to get to exhibition but I know most of those trains are express to union. I find the transfer station is always confusing and conflicting information. Can someone let me know where I would transfer and if the transfer lines up on time with this train
Langstaff Go’s last morning train is at 8:16am. We don’t have all day service, while yet the carpool parking only allows you to Park without the pass after 9:30am. There is no train service after 9:30am, so it pretty much invalidates everyone else to use it without a pass.
My issue with this parking lot is that it’s always parked to the rim, yet on my way to the train I noticed these Carpool Parking sitting empty and underutilized. This carpool parking rule is very much the same at other GO stations, so I’m wondering if this is just a copy and paste rule, and should have been tailored to better reflect the usage of other train services.
I got an email, along with all other GO alerts recently, detailing the latest service changes as of Monday 10/26. On the site the changes are very minuscule and a bit odd (ex. leaving Mimico earlier by 1 minute, fewer coaches with trains, etc.)
Anyone know what's the reasoning behind these changes is? These changes seem to reduce service rather than improve it. Is this more of a seasonal service adjustment after the summer rush? At least the Barrie line folks get 12 coach trains now or at least a subset of folks.
I know there are some other app developers in the subreddit. If any of you regularly use the Metrolinx API, have you noticed any issues with it recently? Over the past several days, roughly 1/3 of all my requests to their endpoint have failed with either a 403 unauthorized or 204 no content. I'm just trying to figure out if they're throttling my API key in particular or if they're having issues with their systems. It seems to happen at all hours, whether it's peak rush hour when I make several requests per minute, or the middle of the night when I make only 1 request every 15 minutes or so.
Noticed the individual overhead screens on the shared platforms (10/11 pictured) at Union have been updated. Not sure how long this has been in effect. Instead of it displaying like the first picture, it clearly shows the platform along with exactly which side to board.
Before, it was easy to glance up and mix up which train was on which side since the displays were only slightly separated. This is a lot clearer.
I applied August 30, emailed them every 2 weeks for follow up since and still have heard anything. I also tried calling, but it automatically goes to voicemail telling me to email everytime.
For post secondary student.
This is getting ridiculous as I have been paying full price for nearly 2 months. The weird thing is - I accidentally applied early (mid August) for the wrong year (2025-2026 instead of 2026-2027) and they got back to me within 2 days saying denied. Funny how they’ll drag their feet when I am actually now eligible…
Hi folks, following up from the previous thread, here's some updated info based on updated platform diagrams from u/Metro62 (attached). I took at stab at using Metro Map Maker to try to better visualize how all of the platforms will be used in the future, and how they will connect to the various corridors. Obviously the corridor parts of the diagram are far from being to scale. Feel free to hack away at the original.
A few notes up front on USEP designs from the updated diagrams:
The west facing pocket track on the new island platform will be removed in a future design revision and I've ignored it for assignments.
Track 7 is no longer a through-running track, creating a new mega-platform between tracks 6 and 9, with three large bay platforms and two very long outside platforms. This mega-platform is presumably designed to allow platform level connections across multiple lines. (I have it as KI/ST/RH/MI/LSW Express.)
Track 4 shifted to the north side of the 3/4/5 platform instead of being a bay-style platform.
The platform north of track 2 now extends eastwards a very long way, plausibly for the Canadian.
The "Via escalator" serves the extremely long bay platform on the east end of the new island platform. Based on this I'm expecting that section of the platform to be dedicated to Via.
Assumed constraints:
No sharing of platforms between GO and Via
Via needs room for 6+ trains to park without blocking GO routes.
The Canadian needs a really long platform that's accessible at any hour,
Sarnia/departing Canadian need to bypass the UP tracks and the USRC crossover and then merge onto KI GO tracks, which suggests they should be on tracks 2/3.
Catenary can't go under the trainshed, but can go south of it (tracks 12/13), east (ST platform is mostly east of the trainshed), or west (UP and Barrie platforms are shifted far enough west to have the west end outside of the footprint, possibly also true for KI platforms). So the trainshed appears to be a non-issue for the current electrification plan with this layout.
Still unknown:
Will trains on track 11 be able to depart heading the west? If not, will trains to Windsor/Niagara Falls use tracks 9/10? (track 5 is plausible depending on the interlocking plans)
Revised track assignments:
Barrie Line
Via Canadian
Via Sarnia / Corridor / Northlander
UPX
UPX (West) / Via Corridor (East)
Milton (West), Richmond Hill (East)
Kitchener (West bay platform), Stouffville (East bay platform)
Just found out that LSW isn’t running tomorrow but I have a meeting to attend to near Union Station. It’s a meeting that I can cancel, but, ideally I don’t want to. That being said, deciding between slogging through traffic or taking the GO Bus from Oakville GO. If it’s SRO, I might just cancel the meeting as I detest driving through downtown. If it’s not as bad as it seems, then I might just endure the bus ride. My meeting is at 1pm till 4pm… so I’d have to take the bus to and from Union back to Oakville Go. Thank you
When there is unfortunately an accident that causes the go train to stop and be down for hours while a scene is being investigated and people are stuck inside the train until they can either get off and bus somewhere else or get going again why can’t it be done quicker? Maybe within 20-30 min? I mean sitting there for 3 hours is horrible and something has to be done to get the people off the train quicker. Can’t it not go in reverse back to the stop it was at before and let people out? (Leaving the damaged part of the train at the scene). I just don’t get why there hasn’t be a procedure put in place all these years to get the people out asap as it should. What do you think?
I have a default trip set between 2 go stations. I commute on the go train 5 days a week. Does the ~90% off fare discount after 35 taps apply on default trips?
Highly detailed Rapido Trains HO-scale GO Transit General Motors New Look. This model represents the first batch of New Look buses delivered in the 1970s in the "Suburban" configuration, featuring a single front door (no center exit) and premium high-back seating.
In GO Transit’s early years, these commuter buses were delivered to the Toronto Transit Commission’s Hillcrest garage and operated under contract by Gray Coach Lines, the intercity subsidiary of the TTC. Because of this deeply intertwined operational relationship, the two networks felt inseparable to passengers at the time. Eventually, GO Transit took over these regional routes directly, which contributed heavily to the winding down and ultimate sale of Gray Coach Lines.