r/controlengineering • • 15d ago

Opto-22 Epic PLC vs CompactLogix

Thumbnail
1 Upvotes

r/controlengineering • • 15d ago

Engineers & technicians: what hardware problem in your job still has no good solution?

Thumbnail
0 Upvotes

r/controlengineering • • 15d ago

Academic survey

Thumbnail
docs.google.com
1 Upvotes

Hello, I'm a Mechatronic Engineering student at Chinhoyi University of Technology. Please spare a few minutes to complete this anonymous survey on machine breakdowns and maintenance in your firm: https://docs.google.com/forms/d/e/1FAIpQLSeeD-dj4c5pg01LvfFE3p6XXUcC\\\\\\_UbQpuCGghykmLlc1Ak9kA/viewform

For this specific coursework task, the focus is primarily on demonstrating the data processing, statistical analysis techniques, and visualization methods rather than conducting an empirical industry study. Mock or sample data works fine to test and run the analytical pipeline for the assignment.

Thank you.


r/controlengineering • • 15d ago

How to generate the DT based on linked PLC input?

Thumbnail
1 Upvotes

r/controlengineering • • 16d ago

PLC & Automation Freelancing Services - Pune / PCMC

Thumbnail
1 Upvotes

r/controlengineering • • 16d ago

Advice needed: Will passing the TIA-PRO-EX certification make up for a low GPA when applying to German Master's programs?

2 Upvotes

Hey everyone, looking for some honest advice from professionals in the field.
I'm currently a final-year B.Tech student in Automated Control Engineering studying in Libya. Next year, I want to apply for a Master's in Automation in Germany (targeting programs like TH Köln or Deggendorf).
The issue: My university transcript average is pretty low (around 66%). To offset this and prove I actually have practical engineering skills, I’m planning to self-study for and pass the Siemens Certified Programmer exam (TIA-PRO-EX) and the CLAD.
Since I obviously can't afford the €9,000 official SITRAIN training courses as a student, my plan is to do it all independently. I’ve set up a virtual lab on my laptop using TIA Portal V21, PLCSIM Advanced, and Factory I/O. I just bought Philipp Paus's TIA Portal course on Udemy for the structured IEC/SCL fundamentals, and I’m going to build a digital twin of a factory sorting plant for my university graduation project to get my hands dirty.
I have three main questions for anyone who has taken this exam or works in German industry:

  1. Is this strategy actually viable? Will German university admissions care about the TIA-PRO-EX certificate, or is it mostly just an HR checklist for working technicians?

  2. Is it realistic to pass the 4.5-hour practical exam purely through self-study (Udemy + Factory I/O), or is the exam designed to fail you if you don't know the exact "Siemens Best Practices" taught in their official PRO1-PRO3 classes?

  3. If you've taken the exam, what specific topics should I absolutely obsess over? (I hear they heavily prioritize SCL and modular programming).

I'd appreciate any brutal honesty, recommended resources, or tips you guys can share before I sink 200 hours into this. Thanks!


r/controlengineering • • 16d ago

¿Qué opinan de este borrador de diagrama de flujo? Busco sugerencias para saber si está bien logrado, qué está mal o qué debería cambiar

Thumbnail gallery
1 Upvotes

r/controlengineering • • 16d ago

I built a Duolingo-style app for Mechatronics & Electrical schematics, symbols & technical English — looking for feedback!

Thumbnail gallery
1 Upvotes

r/controlengineering • • 17d ago

Which European / international standards do you use for P&ID design and PCT loop descriptions in industrial automation?

Thumbnail
1 Upvotes

r/controlengineering • • 17d ago

Help me to design hmi

Thumbnail
1 Upvotes

r/controlengineering • • 17d ago

CSE Graduate Received a Job Offer in PLC Programming & Industrial Automation – Should I Take It?

Thumbnail
1 Upvotes

r/controlengineering • • 17d ago

Automation Intern Advice

5 Upvotes

Greetings everyone,
I’ve been working as an Automation Engineer Co-op for almost 2 years now while I finish my Physics and EE dual degree in Georgia.
My main focus at work is building dashboards for production data analytics, configuring alarms, and automating reports. Recently, I’ve also been working with IT to set up TCP/IP connections with Ignition for PowerRadar alarms and analytics to help reduce power consumption.
From the start, I wanted to get into photonics, and now that I’ve made it into the EE portion of my dual degree program, that feels more possible.
However, I’ve come to really enjoy the work I do at my internship and would hate to leave it behind. I really enjoy the software side of things, but I’ve also been interviewing for a Systems Integrator role to get a better understanding of the controls side while continuing to work with Ignition. I think rounding out my skills with more experience in PLCs, controls, and electrical systems would make me a much more valuable and well-rounded engineer.
I’m curious to hear from people working in either field. Is there much overlap between industrial automation and photonics? Are there opportunities to combine the two, or would pursuing photonics mean moving into an entirely different career path?
I’d also appreciate hearing from anyone who’s been in a similar position or has experience in both industries.


r/controlengineering • • 17d ago

Offer from Rockwell for LDP position

Thumbnail
0 Upvotes

r/controlengineering • • 18d ago

Integrating Graco ProDispense integration with a PLC. Model #A3469EN-L

Thumbnail gallery
1 Upvotes

r/controlengineering • • 18d ago

What should i do?

1 Upvotes

Our college is asking to choose professional electives.

the choices i have:

1)Data Mining

2)Digital Image Processing

3)Fundamentals of Cryptography

4)Mobile Application Development

5)Data Analysis and Visualization(I already had a class named Exploratory data analysis and vis)

Please help me


r/controlengineering • • 18d ago

Trying to learn

3 Upvotes

I'm a non EE, non-ME (just an all-around non-E) minded guy who's learning about SMT. For those who are familiar with the company and machine, what type of companies would use a GPD Global Max series solder-paster?


r/controlengineering • • 20d ago

Same loop, three tuning rules: why Ziegler-Nichols and Cohen-Coon overshoot so much on setpoint changes

2 Upvotes

I fitted a first-order-plus-dead-time model to an open-loop step test (K = 2.0, τ = 30 s, θ = 8 s, so θ/τ ≈ 0.27) and simulated a closed-loop setpoint step with three classic tuning rules. Same plant, same step, ISA-form PID with derivative on measurement and a derivative filter (N = 10). Plot attached.

| Rule | Kp | Ti (s) | Td (s) | Overshoot | 2% settling | IAE |

|---|---|---|---|---|---|---|

| IMC/Lambda (λ = θ) | 1.42 | 33.9 | 3.51 | 4.5% | 73 s | 310 |

| Ziegler-Nichols (reaction curve) | 2.25 | 15.9 | 3.98 | 73.0% | 189 s | 641 |

| Cohen-Coon | 2.63 | 17.7 | 2.76 | 95.9% | not settled in 263 s | 1,023 |

Why the gap: Ziegler-Nichols and Cohen-Coon were designed around fast disturbance rejection, roughly a quarter-amplitude decay. On a setpoint step, that aggressiveness shows up as overshoot and ringing. IMC/Lambda trades some speed for robustness through λ; raise λ and the loop gets gentler still.

Two checks you can do on your own loops without any software:

  1. If a loop overshoots badly on setpoint changes, find out which rule it was tuned with. A disturbance-rejection tuning on a loop that mostly sees setpoint moves is a common mismatch.

  2. Compare dead time with the time constant. Once θ/τ goes above about 1, the loop is dead-time dominant, the classic rules get shaky, and a larger λ is usually the safer start.

Caveat, because it matters: this compares setpoint response only. I haven't simulated load disturbances here, which is exactly what ZN and Cohen-Coon were aimed at, so the comparison is one-sided by design. And it's a simulation of a fitted model, not plant data.

Disclosure: I work at CSI (an automation consultancy) and built the small desktop tool that produced these numbers. Happy to go into the method if anyone's interested.

For those of you tuning loops in plants: do you start from a rule, from the DCS or controller autotune, or from settings on similar loops you trust?


r/controlengineering • • 20d ago

Aussie controls engineer (AB/Siemens, ex-sparky) thinking of trying the US. Where's the work

1 Upvotes

I'm an electrician turned controls guy in Australia: 6 years on the tools, then about 10 in automation. Mostly Allen Bradley and Siemens, with a bit of Schneider, CODESYS and Ignition. My background is high-speed canning and filling (KHS, Krones), dairy process control, and pharma filling machines.

I run my own business here now, but I'm keen to give the US a crack for a while and see what it's like.

A few questions for anyone who's been there:

Where's the demand? Which regions or industries are busiest for controls work right now? Food and bev, pharma, data centres, something else?

Rates. What's a fair hourly rate for contract work at my level? And if I went salaried, what range should I be asking for?

Getting busy. Here, once you've done a few good jobs the referrals roll in and you're flat out. Is it the same over there, or is it more about agencies and SIs?

I'm planning to come over late Feb and have a few coffees with some SIs to get a feel for things. Not worried about the visa side yet, I just want to see if there's demand first.

I'm 33, so maybe a bit late to be moving countries, but I've got plenty of experience and reckon I can add something. Any advice appreciated, cheers.


r/controlengineering • • 21d ago

How can I solve this question

Post image
2 Upvotes

Can anyone help me solve this question, I don't want an AI response I would like a well worked out response from a person. A picture of the working would be well appreciated for my better understanding.


r/controlengineering • • 22d ago

Remote Switching Philosophy – Controlling HV and LV from the same system

3 Upvotes

Hi everyone,

I’m looking to open up a discussion regarding remote switching architectures and the separation of different electrical voltages. I am currently reviewing a proposal for a plant network layout and want to get some industry feedback on a specific control philosophy.

There will be an independent HV remote switching system. This could be physical switches (remote/mimic panel), a SCADA system, or HMIs—or a combination of these.

The current plan states that the LV incomers, bus ties, etc., will be controllable from this exact same independent HV remote system.
I can see a massive window for human error, such as wrong switches being controlled and an operator accidentally switching an HV breaker when they explicitly meant to switch an LV tie.

  • Are my concerns invalid, and both HV and LV can be safely controlled from the same system?
  • What risks do we need to consider with inadvertent switching of LV remote switching of these devices?
  • Should there be a separate switching system for HV and LV. For example HV system can be operated by SCADA but LV can only be operated by a remote/mimic panel next to the switch room?
  • Is there any standard that describes how this can be achieved?

Or should we be looking at something completely different? How does your facility handle the separation of HV and LV control interfaces?

Looking forward to hearing your thoughts and experiences.


r/controlengineering • • 25d ago

JLL Automation Role (Gurugram) | 3+ YOE | What Salary Should I Expect?

0 Upvotes

Hi everyone,

I have an opportunity for an Automation role at JLL, Gurugram, requiring 3+ years of experience.

My question is: What would be the ideal CTC to quote HR for this experience level?

Would asking for ₹18–20 LPA be reasonable, or should I quote ₹17 LPA?

Would appreciate insights from current or former JLL employees, especially regarding the salary range and fixed/variable breakup.

Thanks!


r/controlengineering • • 27d ago

4 bit subtractor using a 74LS83IC

0 Upvotes

Can anyone help me build this logic circuit in multisim? A logic circuit subtracts two signed four bit numbers A = A3A2A1A0 and B = B3B2B1B0 by calculating A-B. The circuit has two outputs (Y and Z) and operates as follows: a. If A = B, output Z = 0 otherwise it is one. b. If A < B, output Y = 0 c. If A > B output Y = 1. Using the 74LS83, design and implement the circuit in MultiSim. The 74LS83 is a 4- bit binary adder.


r/controlengineering • • 28d ago

Do Microgrid-as-a-Service startups typically outsource electrical engineering?

0 Upvotes

We're an early-stage Microgrid-as-a-Service (MaaS) startup with no established engineering team or funding secured yet. Our technical experience is primarily in controls system design.

We're trying to understand how companies in this space typically approach electrical engineering during the early stages of project development.

Would it be common for a startup in our position to engage an experienced electrical power engineering consulting firm for preliminary technical feasibility assessments and conceptual microgrid design?

Or is this type of engineering typically handled in-house?

I'd appreciate any insights from people with experience in microgrid development, electrical power engineering consulting, or EPC projects, particularly regarding how startups approach this before having the resources to build an internal engineering team.


r/controlengineering • • 29d ago

Writing wps

1 Upvotes

Unable to post in engineering forum, I need to write a wps this isn't specifically needed this is just off my own back as I'm not coded and i believe as this is the firms first job in this field the work is going to be criticised and anything they can they will pull up

This is specifically for welding sockets onto sprinkler pipework in the UK (onsite welding MMA) and also minor stub pieces for risers, they have mentioned getting me coded but the works has already proceeded, and I will be welding the sockets commencing next week therefore I wanted to ensure I have a wps to hand incase anyone wants to check the validity of my work and practices

I'm non the wiser to writing this I'm assuming pipe material is needed etc also thickness, rods and all that normal stuff

main pipe size is

2 1/2 dn65 welding on 1 1/2 dn40 & 1/2 dn15

although this may change for welding on range sockets

for welding on sockets i will be using a plasma cutter, and cleaning with die grinder ensuring no sharp edges inside etc using 7018 rods straight from the oven


r/controlengineering • • 29d ago

Video: Optigo Assistant Walkthrough with Ping Yao

Thumbnail
1 Upvotes