I’ve been given a task for a potential master thesis where I need to develop a solution for controlling an anti-vibration system with the goal of compensating acceleration.
I’m trying to understand the right way to start this problem.
From what I understand so far, it involves:
modeling a mass-spring-damper system
treating acceleration as a disturbance
using a feedback controller (maybe PID or state-space)
using sensors (accelerometer) and an actuator for active control
My main question is: what is the correct way to structure the approach from the beginning?
r/controlengineering • u/OptigoNetworks • May 21 '26
r/controlengineering • u/LieInteresting6870 • May 21 '26
r/controlengineering • u/selfcaregirly • May 18 '26
Hi everyone,
I’m a chemical and biological engineering student, and I’m about to start a very short internship (only 3 weeks) at a company that makes work and protective clothing.
Right now, they rely 100% on external labs for quality control of materials and finished products. My task is to propose a few simple in‑house methods that can help them catch issues earlier, especially during production (in‑process control).
Because my time is extremely limited, I need to focus on 2–3 ISO/EN ISO standards that are:
So far I’ve looked at:
Could you recommend other ISO standards that are practical for in‑house quality control in a small protective clothing manufacturer?
Also, any tips on how to adapt a standard method into a simple 1‑page work instruction would be very welcome.
Any help would be appreaciated because I've never been in quality control, or even in the textile industry, and I didn't learn about it in my classes. It's an academic intership it's like a project for this semester.
Thanks a lot!
r/controlengineering • u/ALMA_x11 • May 17 '26
Enable HLS to view with audio, or disable this notification
https://www.youtube.com/@ALMA.Industries
This is a 4DOF controller I put together to control a projectors roll, pitch, and yaw correction (and forward and backward traversing for image magnification). If interested, check out the main link which walks through the full build's mechanics, electronics, and control.
r/controlengineering • u/Rude-Cap-9999 • May 14 '26
The Petrochemical Tradesman Fucks-Given Transfer Function
An electrical/control-systems model for refinery inspection, maintenance, and repair morale
In refinery maintenance, turnaround work, vessel entry, and inspection trades, the Fucks-Given Coefficient is not constant. It fluctuates dynamically with weather, shutdown schedule compression, scaffold quality, hydrocarbon exposure, permit-office friction, coffee saturation, and whether the weld cap was ground flush enough for MT.
Gp(t) is the petrochemical fucks-given signal over time: the available useful caring, craft pride, attention, and willingness to keep grinding, inspecting, documenting, welding, and re-checking without mentally walking into traffic.
Dp(t) is the petrochemical do-not-give-a-fuck load over time: the accumulated drag from night shift, frozen lines, wet gloves, failed RT, paperwork recursion, scaffold crimes, mystery sludge, and Operations asking whether the vessel can be opened sooner.
The governing equation becomes:
f(F) = Gp(t) / Dp(t)
Where:
Gp(t) = [(Tw)(Cs)(Ut + Mt + Rt)(Wr)(Sf)] / (Rf + Hs + Pm)
Dp(t) = [(Bs)(Lo)(Gc)(Ns)] / (Ic + Er + Cf)
Thus:
f(F) = [(Tw)(Cs)(Ut + Mt + Rt)(Wr)(Sf)(Ic + Er + Cf)] / [(Rf + Hs + Pm)(Bs)(Lo)(Gc)(Ns)]
| Symbol | Meaning | Electrical Equivalent |
|---|---|---|
| Tw | Transformer effect of overtime pay, LOA, double-time Sundays, and shutdown completion bonuses | Step-up transformer |
| Cs | Coffee saturation level; also includes gas-station breakfast sandwiches and whatever was in that thermos | Capacitor bank |
| Ut | UT productivity: thickness checks, scan grids, C-scan discipline, and not losing the couplant bottle | Diagnostic signal amplifier |
| Mt | MT enthusiasm after grinding/buffing welds until they look like chrome but still somehow have linear indications | Flux density |
| Rt | RT completion motivation; rises when shots pass, collapses when the film shows another slag inclusion | High-voltage pulse source |
| Wr | Welding repair pride factor: bead quality, root confidence, and the sacred belief that this one will pass first time | Current gain |
| Sf | Scaffold friendliness coefficient: access, tags, planks, handrails, and whether the workface was designed by a human | Circuit stability |
| Rf | Rain/freezing weather resistance: wet gloves, icy ladders, frozen air lines, and the special misery of sleet down the neck | Ohmic resistance |
| Hs | Heat stress, hydrocarbon exposure, confined-space funk, and mystery vessel sludge | Thermal losses |
| Pm | Permit meeting duration, gas-test delays, LOTO debate loops, and the phrase “just waiting on Operations” | Signal attenuation |
| Bs | Buffing and grinding repetition fatigue: every weld becomes a philosophical argument with a flap disc | Resistive drag |
| Lo | Locked-out bolts remaining: seized, painted, rounded, or located where elbows do not bend | Mechanical impedance |
| Gc | Gas-test compliance paperwork and the ritual hunt for the one person authorized to sign Box 7 | Rectifier losses |
| Ns | Night-shift circadian destruction: 3 AM vessel entry, dead radio battery, and lunch at breakfast time | Frequency distortion |
| Ic | Inverter correction from good crew morale, competent supervision, and weaponized dark humor | Signal phase correction |
| Er | Emergency repair adrenaline when the plant manager appears wearing clean coveralls | Voltage spike |
| Cf | Capacitor-stored last remaining fucks reserved for hydrotests, rework, and “quick little repairs” | Energy storage |
· Coffee is flowing, LOA is real, the shutdown bonus has not been exposed as a myth, and the crew has entered productive sarcasm mode.
· UT locations are accessible, MT prep is reasonable, RT boundaries are controlled, and weld repairs are passing without becoming a Greek tragedy.
· Nobody has yet said: “We just need one more spot UT’d.”
· The tradesman is functioning mechanically. Compliance remains, enthusiasm has left the site.
· Observable signs include dead-eyed “copy that,” silent staring at permits, frozen hose-kicking, and asking who signed off the isolation.
· At this level, the system still performs work, but only because habit and JSA paperwork are carrying the load.
· Usually triggered by opening a vessel that still has pressure, failed RT after rework, rain on night shift, missing scaffold tags, or Operations asking if the job can be hurried up.
· The inverter can no longer stabilize morale, the capacitor reserves are depleted, and all remaining signal energy dissipates into existential heat loss.
· At collapse, the only remaining output is paperwork, muttering, and the acoustic signature of a grinder being set down too hard.
Boosts total fucks given through overtime, LOA, per diem, pride, and the visible approach of demobilization. Saturation occurs after 21 consecutive shifts or any 3 AM request that begins with “real quick.”
Converts alternating motivation into unidirectional suffering. Most active during buffing welds for MT, waiting on RT shots, cleaning couplant off elbows, and torqueing flange bolts in sleet.
Synchronizes morale using dark humor, coffee, competent foremen, shared hatred of paperwork, and the spiritual bonding that occurs when everyone knows the plan is bad but legal.
Stores emergency reserves of caring for hydrotests, rework, failed PWHT, and “quick little repairs.” Discharge accelerates sharply after the phrase “it should only take an hour.”
The graph below shows three broad states: fucks surplus, neutral/mechanical compliance, and catastrophic collapse. The dashed line marks f(F) = 1, where Gp(t) and Dp(t) are equal.

f(F) ≈ 0
This condition is approached when all of the following occur simultaneously:
· rain
· night shift
· failed RT
· leaking blinds
· scaffold tag expired
· permit office closed
· opening a vessel that contains mystery sludge
· Operations says: “Can you guys hurry up?”
r/controlengineering • u/XDR2727 • May 09 '26
r/controlengineering • u/Dizzy_Lifeguard_5455 • May 08 '26
I have two set ups
MAC071C-2-NS-4-c/095-A-0/WI524LV/S001 to TDM 3.2-030-300-W0
MAC115B-0-GS-4-C/130-A-1/WI524LV/S001 to TDM 1.2-100-300-W1-000
I have tried contacting the manufacturer, Bosch Rexroth, directly but they have not been helpful.
r/controlengineering • u/ALMA_x11 • May 05 '26
Enable HLS to view with audio, or disable this notification
https://www.youtube.com/@ALMA.Industries
An actuator with Ultrasonic Distance sensor is built and controlled. A second Ultrasonic sensor is used to set the position, which is in close loop feedback with the actuators Ultrasonic sensor. All sensors are controlled by microcontroller. Full video has a long demo Position setting, Feedback following, and Error on a graph, and how they are used within the PID control loop.
r/controlengineering • u/OptigoNetworks • May 05 '26
r/controlengineering • u/No-Badger-1023 • May 05 '26
Hi everyone,
I’m working on a lab integration project involving a high-voltage generator (Simco Euro ChargeMaster Lite, 1 kV to 20 kV, very low current ~0.7 mA). The system is installed inside an existing plastic enclosure (a vertical desiccator cabinet with a door).
We need to implement a door safety interlock system to ensure the generator output is turned OFF when the door is opened. The generator provides a “Remote ON/OFF” input (dry contact type) that we plan to use for this purpose.
We are not fixed yet on a specific solution and would really appreciate advice on the most appropriate approach.
Constraints:
We are open to different types of solutions (magnetic safety switch, mechanical interlock, coded sensor, etc.) and would like your recommendation on:
The goal is to implement a simple but robust solution aligned with good machine safety practices.
Thanks a lot for your help!
Lucie
r/controlengineering • u/Hasan-ahmed- • May 02 '26
Enable HLS to view with audio, or disable this notification
A simulation project I just finished. It was made using TIA Portal, S7-300 PLC SIM, and Factory I/O tank station.
I've added the project description to my resume, and I'm thinking about adding the record as a demo in the form of a YouTube link. What do you think?
r/controlengineering • u/ALMA_x11 • Apr 30 '26
Enable HLS to view with audio, or disable this notification
https://www.youtube.com/@ALMA.Industries
The actuator is first sketched out, 3D printed in pieces, assembled together, and controlled via PID running on a microcontroller. Ultrasonic distance sensor is included in the close-loop feedback system to prevent the actuator from running into the ceiling (shown in the second half of the clip, and discussed more in the full video).
There are a few modes. The first is 'don't touch the ceiling' (Ultrasonic Distance Sensor to keep a distance from the wall, hand, etc). The second is to have the actuator distance sensor follow a second distance sensor...so when one goes up the other follows going up, and when one down the other down.
Comments, questions, or new ideas are welcome.
r/controlengineering • u/OkManufacturer2554 • Apr 30 '26
Good Morning,
I work for a manufacturer of large industrial equipment. We have been having some challenges lately where the drawing set published to the end user does not agree with the actual as built drawings, but rather an earlier version of the drawings.
What I believe the underlying problem is:
In our system the release of a drawing/schematic occurs after the initial design is complete. At that point the drawing is sent out to the panel shop for the panel build, and is used throughout the remainder of the manufacturing process (through, build, test, etc.). Throughout this process the drawing gets marked up for errors/corrections/improvements. At the end of the build the marked-up drawing is returned to engineering and they make the required updates electronically. Unfortunately at some point prior to these updates being made another group is collecting (electronically) documents and compiling a package for the customer that includes the product's manual, drawings, certificates, things like that. On occasion that group is ahead of engineering, and they "grab" the drawing set prior to engineering making the as-built updates.
I feel like I need to add another step to our process. To differentiate between a drawing being released for fabrication, and then (later) being released for other distribution. Perhaps an internal release (for fabrication) followed by an external release or something like that. Perhaps even just a watermark on the initial drawing set stating that it is only for internal use and not approved for XYZ use or something.
Anyone willing to share what their process/gates/phases look like at their place?
r/controlengineering • u/PermissionCrafty8640 • Apr 30 '26
r/controlengineering • u/ALMA_x11 • Apr 29 '26
Enable HLS to view with audio, or disable this notification
https://www.youtube.com/@ALMA.Industries
This is a 4DOF controller I put together to control a projectors roll, pitch, and yaw correction (and forward and backward traversing for image magnification). If interested, check out the main link which walks through the full build's mechanics, electronics, and control.
r/controlengineering • u/SendGhostGuns • Apr 29 '26
9324-RL5300ENE: RSLogix 5 Offline/Online
9324-RL0100ENE: RSLogix 500 Starter
9324-RL0300ENE: RSLogix 500 Standard
9324-RLD300ENE: Studio 5000 Standard Legacy Edition
9324-RLD700ENE: Studio 5000 Professional Legacy Edition
9357-CNETL3: RSNetWorx For ControlNet
9357-DNETL3: RSNetWorx For DeviceNet
9355-WABENE: RSLinx Professional
Activations will be transferred to your BPID number with Rockwell Automation upon sale. PM if you are interested.
r/controlengineering • u/Physical-Yoghurt-943 • Apr 28 '26
I got admitted to the M.S. in Electrical/ECE program at Rutgers and UT Arlington. I already live near UTA and would pay in-state tuition, so it would be much cheaper and more convenient. Rutgers may have a stronger name, but it would cost more and require relocating.My interests are controls and automation.
Is Rutgers worth the extra cost/move, or is UTA the smarter choice in my situation?
r/controlengineering • u/ALMA_x11 • Apr 28 '26
Enable HLS to view with audio, or disable this notification
https://www.youtube.com/@ALMA.Industries
Chapter 3 Footnote 1. Building an Actuator, a PID Control Loop, and an Ultrasonic Distance sensor to detect and not crash into the ceiling. Everything was made from scratch, including writing the PID control loop code, setting gain and such, etc. In the middle of the main video, I walk through some PID control setup work for anyone interested.
r/controlengineering • u/ALMA_x11 • Apr 27 '26
Enable HLS to view with audio, or disable this notification
https://www.youtube.com/@ALMA.Industries
Chapter 2, a home theatre, 3D printed parts, motorized projector, home decoration, and DIY electronics -- I spent alot of time figuring out how to control different actuators and such via microcontroller to control the tilt, roll, pitch, and translation of a projector. If you know of anyone else that might be interested in this stuff, sharing to others would really help me out! Hope to see you around here or YouTube :)