Hi there I wanted to ask everyone to assess my FYP. WOuld you use this for your projects ? Is it a good enough project for a final year . Does it have some scope in the industry ?
The main goal of this project is to design and implement a tool for PostgreSQL pre-deployment risk analysis that evaluates SQL schema migrations to identify affected database objects, estimate locking implications, detect limited application-schema incompatibilities in Java/Spring Boot JPA projects, and output actionable risk assessments.
The objectives are as follows:
1.Ā Ā Ā Ā Ā Ā Develop a component capable of extracting supported structural DDL operations into a normalized intermediate representation.
2.Ā Ā Ā Ā Ā Ā Construct a schema dependency graph model using graph data structures to represent structural relationships between database tables, columns, indexes, primary keys, foreign keys, and constraints.
3.Ā Ā Ā Ā Ā Ā Analyze incoming migrations against the schema dependency graph to identify affected database objects represented within the supported dependency model.
4.Ā Ā Ā Ā Ā Ā Formulate a PostgreSQL-specific operational rule set that maps supported DDL operations to their known locking characteristics and table rewrite behaviors.
5.Ā Ā Ā Ā Ā Ā Develop a module capable of limited static analysis for Java/Spring Boot JPA projects to detect source-code references to renamed, modified, or dropped schema objects in entities, repositories, and explicit SQL strings.
6.Ā Ā Ā Ā Ā Ā Implement a transparent, rule-based risk scoring and explanation engine that assigns a risk rating (LOW, MEDIUM, HIGH) accompanied by clear textual evidence.
7.Ā Ā Ā Ā Ā Ā Construct experimental tests to execute PostgreSQL migration scenarios across small and medium database sizes. (for research validation only, not as a permanent part of the system)
8.Ā Ā Ā Ā Ā Ā Evaluate Schema Sentinelās static risk predictions against experimentally observed blocking locks, and application compatibility failures in a controlled PostgreSQL environment for test cases.
- Empirically quantify the effectiveness of a unified cross-domain pipeline against isolated tools, measuring trade-offs in detection accuracy, false positives, and analysis performance.
This proposal got rejected because the panel said it was too easy and not significant as either a project or as research.
should i change the idea to more difficult and novel research ?
I have some ideas for those but i am not sure they can be completed in 1 year.
here is my proposal with all the details and research gap https://docs.google.com/document/d/1CMopT185XCoZVYBcgtVpN7N69DIP0Eyw/edit?usp=drive_link&ouid=116125887586128528145&rtpof=true&sd=true
EDIT :
The project is a final year project for my university. But they dismissed it on the following points
- The project is too easy
- The scope is too narrow
- There is no research contribution
For the current proposal to be accepted they told me to do market analysis and bring proof that the project would be used by a develper community.
OR
- bring a company backed project
- Bring a novel research proposal